Back to kitchen remodel contractors
F.O.J. Construction
- Based in
- Daly City
- On San Francisco permits
- May 2004 to Jul 2008
- Last 24 months
- 0 permits filed
15 permits since 2000: 15 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 8 completed. Typically 0 days from filing to permit and 165 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 23, 2007 | Completed final sign-off Oct 2007 | 1073 Natoma St | remodel the kitchen, install new cabinets, upgrade the electrical in kitchen. no structural 50% of wattage of new lighting to be flourscentDetails
remodel the kitchen, install new cabinets, upgrade the electrical in kitchen. no structural 50% of wattage of new lighting to be flourscent | $9,000 |
| Jun 7, 2006 | Completed final sign-off Nov 2006 | 70 Sheridan St | revision of appl#200503097101 switch location of kitchen to (e) bedroomDetails
revision of appl#200503097101 switch location of kitchen to (e) bedroom | |
| Mar 20, 2006 | Completed final sign-off Nov 2006 | 1936 Powell St | install new kitchen cabinets in both units, correct and upgrade existing electrical service in kitchens. install new tile flooring in kitchen. paint exterior building. no partition changes. no exterior windows.Details
install new kitchen cabinets in both units, correct and upgrade existing electrical service in kitchens. install new tile flooring in kitchen. paint exterior building. no partition changes. no exterior windows. | $25,000 |
| May 3, 2005 | Completed final sign-off Dec 2005 | 3915 17th St | remodel kitchen and bath, upgrade elec in kitchen and bath. remove old cabinets, new cabinets.removeDetails
remodel kitchen and bath, upgrade elec in kitchen and bath. remove old cabinets, new cabinets.remove | $24,000 |
| Mar 9, 2005 | Completed final sign-off Nov 2006 | 70 Sheridan St | remodel of bathroom and kitchen and entry at 2 bedroom unit. remodel to studio unit entry. (add 2ndDetails
remodel of bathroom and kitchen and entry at 2 bedroom unit. remodel to studio unit entry. (add 2nd | $70,000 |
| Dec 21, 2004 | Completed final sign-off Jun 2005 | 2172 Pine St | remodel kitchen and bath. update elec in kitchen and bathroom. new cabinet in kitchen.replace 10 winDetails
remodel kitchen and bath. update elec in kitchen and bathroom. new cabinet in kitchen.replace 10 win | $20,000 |
| Jul 9, 2004 | Completed final sign-off Oct 2004 | 2485 Union St | update the elec in the kitchen one bathroom, install a new tub & new valve. build a wall behind theDetails
update the elec in the kitchen one bathroom, install a new tub & new valve. build a wall behind the | $10,000 |
| May 26, 2004 | Completed final sign-off Sep 2004 | 49 Carmel St | upgrade existing electrical service in kitchen and add gas line service for stove, refrigerator.***Details
upgrade existing electrical service in kitchen and add gas line service for stove, refrigerator.*** | $7,000 |