Back to bathroom remodel contractors
F.O.J. Construction
- Based in
- Daly City
- On San Francisco permits
- May 2004 to Jul 2008
- Last 24 months
- 0 permits filed
15 permits since 2000: 15 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 177 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 12, 2006 | Completed final sign-off Oct 2006 | 410 Francisco St | remodel the bathroom, new tub, toilet, sink, electrical drywall, tile (e) replace existing 30"x64" window in kind. same size same location.Details
remodel the bathroom, new tub, toilet, sink, electrical drywall, tile (e) replace existing 30"x64" window in kind. same size same location. | $8,000 |
| May 3, 2005 | Completed final sign-off Dec 2005 | 3915 17th St | remodel kitchen and bath, upgrade elec in kitchen and bath. remove old cabinets, new cabinets.removeDetails
remodel kitchen and bath, upgrade elec in kitchen and bath. remove old cabinets, new cabinets.remove | $24,000 |
| Mar 9, 2005 | Completed final sign-off Nov 2006 | 70 Sheridan St | remodel of bathroom and kitchen and entry at 2 bedroom unit. remodel to studio unit entry. (add 2ndDetails
remodel of bathroom and kitchen and entry at 2 bedroom unit. remodel to studio unit entry. (add 2nd | $70,000 |
| Dec 21, 2004 | Completed final sign-off Jun 2005 | 2172 Pine St | remodel kitchen and bath. update elec in kitchen and bathroom. new cabinet in kitchen.replace 10 winDetails
remodel kitchen and bath. update elec in kitchen and bathroom. new cabinet in kitchen.replace 10 win | $20,000 |
| Jul 9, 2004 | Completed final sign-off Oct 2004 | 2485 Union St | update the elec in the kitchen one bathroom, install a new tub & new valve. build a wall behind theDetails
update the elec in the kitchen one bathroom, install a new tub & new valve. build a wall behind the | $10,000 |