Back to kitchen remodel contractors
F J Sandoval Co
- Based in
- San Francisco
- On San Francisco permits
- Oct 2008 to Mar 2026
- Last 24 months
- 5 permits filed
52 permits since 2000: 23 completed, 7 in progress, 9 never finaled, 13 expired or cancelled.
Of the 9 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old, 4 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
14 kitchen remodel permits: 7 completed, 1 in progress, 3 never finaled, 3 expired or cancelled. Typically 21 days from filing to permit and 713 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 2, 2025 | In progress issued Dec 2025 | 1867 15th Av | remodel (e) bathroom for master bedroom. remodel (e) kitchen. add (1) powder room in lower level. replace window in master bedroom. build deck platform lower level at yard.Details
remodel (e) bathroom for master bedroom. remodel (e) kitchen. add (1) powder room in lower level. replace window in master bedroom. build deck platform lower level at yard. | $90,000 |
| Apr 23, 2024 | Completed final sign-off Jul 2024 | 104 Walnut St | kitchen remodel in kindDetails
kitchen remodel in kind | $20,000 |
| Jul 18, 2023 | Never finaled issued Jul 2023, no final | 2630 Laguna St | remodel kitchen & one guess bathroom on second flr. remove & replace for like in kind.Details
remodel kitchen & one guess bathroom on second flr. remove & replace for like in kind. | $65,000 |
| Aug 31, 2021 | Never finaled issued Sep 2021, no final | 45 Cleary Ct | unit #4: remodel 2 bathrooms like for like. remodel (1) kitchen like for like. non-structural. work in unit #4 only.Details
unit #4: remodel 2 bathrooms like for like. remodel (1) kitchen like for like. non-structural. work in unit #4 only. | $35,000 |
| Jul 10, 2019 | Completed final sign-off Oct 2021 | 2060 Union St | unit #7: remodel kitchen and bath, add bath, remodel fire place. all work on 5th flDetails
unit #7: remodel kitchen and bath, add bath, remodel fire place. all work on 5th fl | $85,000 |
| Aug 24, 2018 | Completed final sign-off Jun 2021 | 2837 Broderick St | structural upgrade of extg space kitchen remodel and new electrical through outDetails
structural upgrade of extg space kitchen remodel and new electrical through out | $30,000 |
| Jul 24, 2018 | Completed final sign-off Jun 2021 | 2839 Broderick St | remodel kitchen, open non bearing wall to licing space, add bathroom at masterDetails
remodel kitchen, open non bearing wall to licing space, add bathroom at master | $30,000 |
| May 30, 2018 | Completed final sign-off Jun 2021 | 2835 Broderick St | structural upgrade of existing space, kitchen remodel. new elec throughout unit. water heater upgradeDetails
structural upgrade of existing space, kitchen remodel. new elec throughout unit. water heater upgrade | $60,000 |
| Nov 14, 2016 | Never finaled issued Dec 2016, no final | 2839 Broderick St | kitchen & bath renovation, addition of one powder room, removal on one structural wall, addition of landscape pavers; addition of (n) skylites (2),no windows/doors walls under this permit.Details
kitchen & bath renovation, addition of one powder room, removal on one structural wall, addition of landscape pavers; addition of (n) skylites (2),no windows/doors walls under this permit. | $48,000 |
| Apr 19, 2016 | Completed final sign-off Jul 2016 | 1446 08th Av | frame new closet in extg kitchen space with access to hall. no structural work.Details
frame new closet in extg kitchen space with access to hall. no structural work. | $800 |
| Nov 10, 2015 | Completed final sign-off May 2016 | 2839 Broderick St | repair dry rot to rear stairs. install handrail at side entrance, install electrical board, additional gfi outlets, smoke detectors, receptacles in kitchen; replace conduit; install vent for water heaters & combustion air vents; dwv plumbing laundry & toilet offsets; less than 50%Details
repair dry rot to rear stairs. install handrail at side entrance, install electrical board, additional gfi outlets, smoke detectors, receptacles in kitchen; replace conduit; install vent for water heaters & combustion air vents; dwv plumbing laundry & toilet offsets; less than 50% | $5,200 |
| Aug 24, 2015 | Expired or cancelled withdrawn Dec 2019 | 143 Corbett Av | intstall 2nd unit, install bedroom & bathroom and kitchen at ground levelDetails
intstall 2nd unit, install bedroom & bathroom and kitchen at ground level | $60,000 |
| Aug 6, 2014 | Expired or cancelled expired Mar 2021 | 132 Corbett Av | add occupancy at existing attic space. new bedroom, new bath, new spiral stair, four new dormers, skylight at kitchenDetails
add occupancy at existing attic space. new bedroom, new bath, new spiral stair, four new dormers, skylight at kitchen | $22,000 |
| Feb 24, 2014 | Expired or cancelled expired Feb 2021 | 132 Corbett Av | removal of a interior wall, new structure, expansion of existing kitchen, demo of existing addition that is dry rotted out. no additional square feet added.Details
removal of a interior wall, new structure, expansion of existing kitchen, demo of existing addition that is dry rotted out. no additional square feet added. | $38,000 |