Back to bathroom remodel contractors
F J Sandoval Co
- Based in
- San Francisco
- On San Francisco permits
- Oct 2008 to Mar 2026
- Last 24 months
- 5 permits filed
52 permits since 2000: 23 completed, 7 in progress, 9 never finaled, 13 expired or cancelled.
Of the 9 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old, 4 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 5 completed, 3 in progress, 5 never finaled, 2 expired or cancelled. Typically 2 days from filing to permit and 797 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 2, 2025 | In progress issued Dec 2025 | 1867 15th Av | remodel (e) bathroom for master bedroom. remodel (e) kitchen. add (1) powder room in lower level. replace window in master bedroom. build deck platform lower level at yard.Details
remodel (e) bathroom for master bedroom. remodel (e) kitchen. add (1) powder room in lower level. replace window in master bedroom. build deck platform lower level at yard. | $90,000 |
| May 13, 2025 | Completed final sign-off Mar 2026 | 1671 Geneva Av | to comply with nov #202293661. revert room back to original use. removal of partial bathroom. no loss of dwelling unit.Details
to comply with nov #202293661. revert room back to original use. removal of partial bathroom. no loss of dwelling unit. | $30,000 |
| Sep 30, 2024 | In progress issued Sep 2024 | 2630 Laguna St | 2nd fl. remove and replace in kind master bathroom: toilet sinks fixtures tub fixturs; power room: toliet and sink. no other work.Details
2nd fl. remove and replace in kind master bathroom: toilet sinks fixtures tub fixturs; power room: toliet and sink. no other work. | $6,000 |
| Sep 3, 2024 | In progress issued Sep 2024 | 1964 08th Av | remodel (1) bathroom add (1) bathroom, all work on 2nd flr bathrooms. voluntary strenghthening seismic upgrades/foundation bolting upgrade (e) 100 amp service to 200 mp service. foundation bolting 32" on center with 8" embedment. 5/8" anchor bolts and 3x3 square washerDetails
remodel (1) bathroom add (1) bathroom, all work on 2nd flr bathrooms. voluntary strenghthening seismic upgrades/foundation bolting upgrade (e) 100 amp service to 200 mp service. foundation bolting 32" on center with 8" embedment. 5/8" anchor bolts and 3x3 square washer | $60,000 |
| Jul 18, 2023 | Never finaled issued Jul 2023, no final | 2630 Laguna St | remodel kitchen & one guess bathroom on second flr. remove & replace for like in kind.Details
remodel kitchen & one guess bathroom on second flr. remove & replace for like in kind. | $65,000 |
| Aug 31, 2021 | Never finaled issued Sep 2021, no final | 45 Cleary Ct | unit #4: remodel 2 bathrooms like for like. remodel (1) kitchen like for like. non-structural. work in unit #4 only.Details
unit #4: remodel 2 bathrooms like for like. remodel (1) kitchen like for like. non-structural. work in unit #4 only. | $35,000 |
| Jul 10, 2019 | Completed final sign-off Oct 2021 | 2060 Union St | unit #7: remodel kitchen and bath, add bath, remodel fire place. all work on 5th flDetails
unit #7: remodel kitchen and bath, add bath, remodel fire place. all work on 5th fl | $85,000 |
| Jul 24, 2018 | Completed final sign-off Jun 2021 | 2839 Broderick St | remodel kitchen, open non bearing wall to licing space, add bathroom at masterDetails
remodel kitchen, open non bearing wall to licing space, add bathroom at master | $30,000 |
| Nov 14, 2016 | Never finaled issued Dec 2016, no final | 2839 Broderick St | kitchen & bath renovation, addition of one powder room, removal on one structural wall, addition of landscape pavers; addition of (n) skylites (2),no windows/doors walls under this permit.Details
kitchen & bath renovation, addition of one powder room, removal on one structural wall, addition of landscape pavers; addition of (n) skylites (2),no windows/doors walls under this permit. | $48,000 |
| Jun 21, 2016 | Never finaled issued Nov 2019, no final | 134 Capistrano Av | 1st flr: convert (e) spaces to have a bedroom a family room and a full bath. 2nd flr: remodel (e) kitche and bath. add a rear deckDetails
1st flr: convert (e) spaces to have a bedroom a family room and a full bath. 2nd flr: remodel (e) kitche and bath. add a rear deck | $40,000 |
| Aug 24, 2015 | Expired or cancelled withdrawn Dec 2019 | 143 Corbett Av | intstall 2nd unit, install bedroom & bathroom and kitchen at ground levelDetails
intstall 2nd unit, install bedroom & bathroom and kitchen at ground level | $60,000 |
| Sep 18, 2014 | Completed final sign-off Nov 2016 | 143 Corbett Av | install new bathroom on 3rd floor, remodel existing bathroom on 3rd fl. address complaint 20149441Details
install new bathroom on 3rd floor, remodel existing bathroom on 3rd fl. address complaint 20149441 | $25,000 |
| Aug 11, 2014 | Completed final sign-off Nov 2016 | 143 Corbett Av | repair dry rot on floor & wall of third floor bathroom. replace plumbing fixts. (e) lighting & ventilation to remain.Details
repair dry rot on floor & wall of third floor bathroom. replace plumbing fixts. (e) lighting & ventilation to remain. | $13,000 |
| Aug 6, 2014 | Expired or cancelled expired Mar 2021 | 132 Corbett Av | add occupancy at existing attic space. new bedroom, new bath, new spiral stair, four new dormers, skylight at kitchenDetails
add occupancy at existing attic space. new bedroom, new bath, new spiral stair, four new dormers, skylight at kitchen | $22,000 |
| Dec 17, 2013 | Never finaled issued Dec 2013, no final | 1348 Dolores St | unit #2:remove and replace window, replace bathroom vanity,remove interior doors and casing (nonstructural), remove closet, install new base and crown/Details
unit #2:remove and replace window, replace bathroom vanity,remove interior doors and casing (nonstructural), remove closet, install new base and crown/ | $2,500 |