F J S Construction
- Based in
- Santa Rosa
- On San Francisco permits
- Jul 2000 to Aug 2025
- Last 24 months
- 2 permits filed
69 permits since 2000: 55 completed, 8 never finaled, 6 expired or cancelled.
Of the 8 never-finaled permits, 1 is 3 to 5 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
6 stairs permits: 4 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 172 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 4, 2025 | Expired or cancelled withdrawn Sep 2025 | 84 Sotelo Av | new junior adu convert 593 sf (e) ground floor living space (bedroom, bathroom, laundry). capture an additional 155 sf of unfinished basement for a total of 748 df. replace all (e) rear windows. add kitchen. construct stairs from (e) deck to grade. re-pave concrete walkway between adjacent propertyDetails
new junior adu convert 593 sf (e) ground floor living space (bedroom, bathroom, laundry). capture an additional 155 sf of unfinished basement for a total of 748 df. replace all (e) rear windows. add kitchen. construct stairs from (e) deck to grade. re-pave concrete walkway between adjacent property | $100,000 |
| Mar 21, 2023 | Never finaled issued Jun 2023, no final | 4281 24th St | replace (e) front wood staircase due to dryrot, (e) wood guardrail to be replaced in-kind, new 1.5" graspabale handrailDetails
replace (e) front wood staircase due to dryrot, (e) wood guardrail to be replaced in-kind, new 1.5" graspabale handrail | $10,000 |
| Sep 19, 2020 | Completed final sign-off Jul 2022 | 51 Cityview Wy | interior remodel. replace exterior doors/windows and add new window at back staircase. 1st floor: reconifgure rear of garage by adding 832 sq ft of living space. legalize new bedroom, bathroom,family room, & workout room. 2nd floor: reconfigure (e) bathroom.Details
interior remodel. replace exterior doors/windows and add new window at back staircase. 1st floor: reconifgure rear of garage by adding 832 sq ft of living space. legalize new bedroom, bathroom,family room, & workout room. 2nd floor: reconfigure (e) bathroom. | $150,000 |
| Jul 23, 2015 | Completed final sign-off Jun 2016 | 227 Douglass St | rear deck repairs. replace rotted beams, posts & stairs as necessary with pressure treated lumber. less than 50% repair. repair in-kind.Details
rear deck repairs. replace rotted beams, posts & stairs as necessary with pressure treated lumber. less than 50% repair. repair in-kind. | $10,000 |
| Jun 25, 2013 | Completed final sign-off Jul 2013 | 550 03rd Av | repair extg exterior stair footing. as per plan.Details
repair extg exterior stair footing. as per plan. | $4,000 |
| Dec 2, 2011 | Completed final sign-off Dec 2011 | 585 Connecticut St | repair dry rot/water damage & stairs. all work in kind.Details
repair dry rot/water damage & stairs. all work in kind. | $5,000 |