Back to bathroom remodel contractors
F J S Construction
- Based in
- Santa Rosa
- On San Francisco permits
- Jul 2000 to Aug 2025
- Last 24 months
- 2 permits filed
69 permits since 2000: 55 completed, 8 never finaled, 6 expired or cancelled.
Of the 8 never-finaled permits, 1 is 3 to 5 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 10 completed, 1 expired or cancelled. Typically 6 days from filing to permit and 114 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 4, 2025 | Expired or cancelled withdrawn Sep 2025 | 84 Sotelo Av | new junior adu convert 593 sf (e) ground floor living space (bedroom, bathroom, laundry). capture an additional 155 sf of unfinished basement for a total of 748 df. replace all (e) rear windows. add kitchen. construct stairs from (e) deck to grade. re-pave concrete walkway between adjacent propertyDetails
new junior adu convert 593 sf (e) ground floor living space (bedroom, bathroom, laundry). capture an additional 155 sf of unfinished basement for a total of 748 df. replace all (e) rear windows. add kitchen. construct stairs from (e) deck to grade. re-pave concrete walkway between adjacent property | $100,000 |
| Mar 19, 2024 | Completed final sign-off Oct 2024 | 538 21st Av | existing bathroom remodel; new full bathroom and kitchen remodelDetails
existing bathroom remodel; new full bathroom and kitchen remodel | $95,000 |
| Oct 23, 2023 | Completed final sign-off Oct 2025 | 411 Douglass St | renovation to single family dwelling. new bathroom at basement. remodel existing kitchen including new windows and swing door at breakfast room. new graywater system under separate permit.Details
renovation to single family dwelling. new bathroom at basement. remodel existing kitchen including new windows and swing door at breakfast room. new graywater system under separate permit. | $130,000 |
| Nov 4, 2022 | Completed final sign-off Apr 2024 | 321 Missouri St | 2/f: widen opening in center bearing wall (additional 30") to 7'-9", bathroom remoel.Details
2/f: widen opening in center bearing wall (additional 30") to 7'-9", bathroom remoel. | $40,000 |
| Jun 30, 2022 | Completed final sign-off Jul 2022 | 51 Cityview Wy | as built revision to pa# 202009194537. infill door between bathroom and storage.Details
as built revision to pa# 202009194537. infill door between bathroom and storage. | |
| Sep 19, 2020 | Completed final sign-off Jul 2022 | 51 Cityview Wy | interior remodel. replace exterior doors/windows and add new window at back staircase. 1st floor: reconifgure rear of garage by adding 832 sq ft of living space. legalize new bedroom, bathroom,family room, & workout room. 2nd floor: reconfigure (e) bathroom.Details
interior remodel. replace exterior doors/windows and add new window at back staircase. 1st floor: reconifgure rear of garage by adding 832 sq ft of living space. legalize new bedroom, bathroom,family room, & workout room. 2nd floor: reconfigure (e) bathroom. | $150,000 |
| Feb 25, 2015 | Completed final sign-off May 2015 | 2245 Lincoln Wy | remodel bathroom. replace tub, tile, update plumbingDetails
remodel bathroom. replace tub, tile, update plumbing | $10,000 |
| Jul 11, 2013 | Completed final sign-off Nov 2013 | 251 Harold Av | remodel kitchen and bathroom, new cabinets and fixtures. frame in new pocket door. no structural.Details
remodel kitchen and bathroom, new cabinets and fixtures. frame in new pocket door. no structural. | $20,000 |
| May 22, 2012 | Completed final sign-off Jul 2012 | 5140 Diamond Heights Bl | remove one kitchen and one bathroom cabinets/contractors; and replace with new; re-tile bath tub and floor including kitchen floor, light to comply with cec 150(k)Details
remove one kitchen and one bathroom cabinets/contractors; and replace with new; re-tile bath tub and floor including kitchen floor, light to comply with cec 150(k) | $15,000 |
| Jan 31, 2012 | Completed final sign-off Apr 2012 | 527 Birch St | replace bathroom, fixtures, bath walls, where necessary tile and paint, no structural work one bathroom only, replace kitchen cabinets and fixtures, patch walls and paint, (n) lighting comply with cec 150(k)Details
replace bathroom, fixtures, bath walls, where necessary tile and paint, no structural work one bathroom only, replace kitchen cabinets and fixtures, patch walls and paint, (n) lighting comply with cec 150(k) | $25,000 |
| Jan 31, 2012 | Completed final sign-off Apr 2012 | 529 Birch St | replace bathroom fixtures, patch walls where necessary, tile and paint, no structural work, replace kitchen cabinets and fixtures, patch walls and paint, (n) lighting comply with cec(150)kDetails
replace bathroom fixtures, patch walls where necessary, tile and paint, no structural work, replace kitchen cabinets and fixtures, patch walls and paint, (n) lighting comply with cec(150)k | $25,000 |