Back to kitchen remodel contractors
Ewen Utting Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2002 to Jul 2026
- Last 24 months
- 7 permits filed
66 permits since 2000: 38 completed, 6 in progress, 16 never finaled, 6 expired or cancelled.
Of the 16 never-finaled permits, 4 are 3 to 5 years old, 10 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
14 kitchen remodel permits: 7 completed, 5 never finaled, 2 expired or cancelled. Typically 14 days from filing to permit and 247 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 17, 2023 | Completed final sign-off Aug 2025 | 3325 Pierce St | interior remoddel and rebuild side rear stairs at 1st fl. fill in under e popout at 2nd fl. remodel kitchen, add bath, remodel primary bedroomDetails
interior remoddel and rebuild side rear stairs at 1st fl. fill in under e popout at 2nd fl. remodel kitchen, add bath, remodel primary bedroom | $125,000 |
| Feb 24, 2023 | Completed final sign-off Jun 2025 | 26 Avila St | remodel bathrooms & kitchen at 2nd floor. rebuild interior stairs from 2nd to 3rd floor. (n) interior stairs to 1st floor. develop 634 sf. ft. habitable space at 1st floor: new laundry, guest bedroom, bathroom, family room & office.Details
remodel bathrooms & kitchen at 2nd floor. rebuild interior stairs from 2nd to 3rd floor. (n) interior stairs to 1st floor. develop 634 sf. ft. habitable space at 1st floor: new laundry, guest bedroom, bathroom, family room & office. | $250,000 |
| Dec 9, 2022 | Never finaled issued Dec 2022, no final | 279 Vicente St | repair fire damage to (e) kitchen and bathroom. new cabinets in (e) locations. correction for nov# 2022-98-466.Details
repair fire damage to (e) kitchen and bathroom. new cabinets in (e) locations. correction for nov# 2022-98-466. | $75,000 |
| Jul 14, 2021 | Never finaled issued Nov 2021, no final | 544 Clayton St | unit 6 - 4th flr - revision to 2018 0322 4393: replace egress door to egress window per 1030.2 per ab019 (visible from street). adjust bath location. adjust kitchen location. interior work only.Details
unit 6 - 4th flr - revision to 2018 0322 4393: replace egress door to egress window per 1030.2 per ab019 (visible from street). adjust bath location. adjust kitchen location. interior work only. | |
| Jul 27, 2018 | Never finaled issued Jul 2018, no final | 441 Oak St | remodel (e) kitchen and two baths. (n) cabinets in existing locations, no structural work. plumbing and electrical under separate permit.Details
remodel (e) kitchen and two baths. (n) cabinets in existing locations, no structural work. plumbing and electrical under separate permit. | $15,000 |
| May 1, 2018 | Expired or cancelled expired Jul 2026 | 544 Clayton St | per ord# 162-16. add two units: 2 one bedroom units each to include a kitchen & bath.Details
per ord# 162-16. add two units: 2 one bedroom units each to include a kitchen & bath. | $150,000 |
| Mar 22, 2018 | Never finaled issued Jan 2020, no final | 544 Clayton St | per ordinance 43-14. legalize the 6th unit on the 4th flr. a (2) bedroom unit w/ kitchen & bath. fire alarm & sprinkler under separate permit.Details
per ordinance 43-14. legalize the 6th unit on the 4th flr. a (2) bedroom unit w/ kitchen & bath. fire alarm & sprinkler under separate permit. | $195,000 |
| Jun 10, 2015 | Never finaled issued Oct 2018, no final | 369 Duncan St | vertical & horiz addition.seismic upgrade,remodel&addition to(e)1-story sfd.bsmt-add(n)2nd unit( studio w/kitchen&bath).1/fl-remodel kitchen,living rm&dining rm.(n)2/fl-(n)3(n)bedrms,2(n)bath rms,(n)laundry,(n)roof.(n)3/fl-(n)family rm,office,bathrm& closets&(n)roof deck.Details
vertical & horiz addition.seismic upgrade,remodel&addition to(e)1-story sfd.bsmt-add(n)2nd unit( studio w/kitchen&bath).1/fl-remodel kitchen,living rm&dining rm.(n)2/fl-(n)3(n)bedrms,2(n)bath rms,(n)laundry,(n)roof.(n)3/fl-(n)family rm,office,bathrm& closets&(n)roof deck. | $500,000 |
| Sep 17, 2012 | Completed final sign-off Nov 2013 | 4564 19th St | remodel & addition all flrs of a (3) story over basement single family res. work includes: basement excavation for (n) habitable space w/(n) bath. 1st flr remodel & addition add bedroom, bath, laundry & play area. 2nd fl. remodeling & addition to expand kitchen & family room & add powder . 3rd flDetails
remodel & addition all flrs of a (3) story over basement single family res. work includes: basement excavation for (n) habitable space w/(n) bath. 1st flr remodel & addition add bedroom, bath, laundry & play area. 2nd fl. remodeling & addition to expand kitchen & family room & add powder . 3rd fl | $410,000 |
| Oct 27, 2011 | Completed final sign-off Mar 2012 | 1248 Leavenworth St | minor changes to 200710165569: 3 skylights and exterior delete angel at bay windows, front windows. spiral stair to rear yard instead of straight run stair. interior: minor floor plan changes to baths, closets, kitchens. structural: minor sturctural changes to accomodate interior changesDetails
minor changes to 200710165569: 3 skylights and exterior delete angel at bay windows, front windows. spiral stair to rear yard instead of straight run stair. interior: minor floor plan changes to baths, closets, kitchens. structural: minor sturctural changes to accomodate interior changes | $8,000 |
| Jun 4, 2009 | Completed final sign-off Dec 2009 | 2646 Chestnut St | 1st floor kitchen remodel, 2nd floor 2 1/2 bathroom remodel (2 on 2nd floor, 3rd floor add 1 bathroom.Details
1st floor kitchen remodel, 2nd floor 2 1/2 bathroom remodel (2 on 2nd floor, 3rd floor add 1 bathroom. | $100,000 |
| Feb 25, 2003 | Expired or cancelled expired Jan 2006 | 3456 Pierce St | remodel (e)kitchen,remove cabinets & install;(n)plmbg & elec,remodel (e)bathrm,install showerDetails
remodel (e)kitchen,remove cabinets & install;(n)plmbg & elec,remodel (e)bathrm,install shower | $45,000 |
| Aug 12, 2002 | Completed final sign-off Nov 2002 | 1432 Washington St | remodel kitchen. instill new plumbing, electric service,drywall& cabinets. no structural work.Details
remodel kitchen. instill new plumbing, electric service,drywall& cabinets. no structural work. | $15,000 |
| Feb 19, 2002 | Completed final sign-off Nov 2002 | 14 Glover St | remodel kitchen, relocate existing door in (e) wall non load bearing, no structural electric & plumbDetails
remodel kitchen, relocate existing door in (e) wall non load bearing, no structural electric & plumb | $25,000 |