Back to bathroom remodel contractors
Ewen Utting Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2002 to Jul 2026
- Last 24 months
- 7 permits filed
66 permits since 2000: 38 completed, 6 in progress, 16 never finaled, 6 expired or cancelled.
Of the 16 never-finaled permits, 4 are 3 to 5 years old, 10 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 10 completed, 1 in progress, 8 never finaled, 1 expired or cancelled. Typically 54 days from filing to permit and 310 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 28, 2026 | In progress issued Aug 2026 | 4174 26th St | scope of work to include adding a new floor to existing single family dwelling to consist of a new primary bedroom, bathroom, closet, and a modest north deck.Details
scope of work to include adding a new floor to existing single family dwelling to consist of a new primary bedroom, bathroom, closet, and a modest north deck. | $426,000 |
| Nov 17, 2023 | Completed final sign-off Aug 2025 | 3325 Pierce St | interior remoddel and rebuild side rear stairs at 1st fl. fill in under e popout at 2nd fl. remodel kitchen, add bath, remodel primary bedroomDetails
interior remoddel and rebuild side rear stairs at 1st fl. fill in under e popout at 2nd fl. remodel kitchen, add bath, remodel primary bedroom | $125,000 |
| Sep 27, 2023 | Completed final sign-off Jun 2025 | 26 Avila St | revison to previous approved permit#202302242589. remodel master bedroom & bathroom @ 3rd flr. add (n) roof deck @ rear, (n) skylight, replace windows @ back of house(not visible from street). minor revisions to ground flr.Details
revison to previous approved permit#202302242589. remodel master bedroom & bathroom @ 3rd flr. add (n) roof deck @ rear, (n) skylight, replace windows @ back of house(not visible from street). minor revisions to ground flr. | $35,000 |
| Mar 15, 2023 | Never finaled issued Mar 2023, no final | 279 Vicente St | foundation replacement and redevelopment of (e) g/f. new interior stair (replace (e) non-conforming). new bathroom at 2/f. replace all windows.Details
foundation replacement and redevelopment of (e) g/f. new interior stair (replace (e) non-conforming). new bathroom at 2/f. replace all windows. | $200,000 |
| Feb 24, 2023 | Completed final sign-off Jun 2025 | 26 Avila St | remodel bathrooms & kitchen at 2nd floor. rebuild interior stairs from 2nd to 3rd floor. (n) interior stairs to 1st floor. develop 634 sf. ft. habitable space at 1st floor: new laundry, guest bedroom, bathroom, family room & office.Details
remodel bathrooms & kitchen at 2nd floor. rebuild interior stairs from 2nd to 3rd floor. (n) interior stairs to 1st floor. develop 634 sf. ft. habitable space at 1st floor: new laundry, guest bedroom, bathroom, family room & office. | $250,000 |
| Dec 9, 2022 | Never finaled issued Dec 2022, no final | 279 Vicente St | repair fire damage to (e) kitchen and bathroom. new cabinets in (e) locations. correction for nov# 2022-98-466.Details
repair fire damage to (e) kitchen and bathroom. new cabinets in (e) locations. correction for nov# 2022-98-466. | $75,000 |
| Jul 14, 2021 | Never finaled issued Nov 2021, no final | 544 Clayton St | unit 6 - 4th flr - revision to 2018 0322 4393: replace egress door to egress window per 1030.2 per ab019 (visible from street). adjust bath location. adjust kitchen location. interior work only.Details
unit 6 - 4th flr - revision to 2018 0322 4393: replace egress door to egress window per 1030.2 per ab019 (visible from street). adjust bath location. adjust kitchen location. interior work only. | |
| Sep 19, 2020 | Never finaled issued Dec 2020, no final | 439 Oak St | selective interior renovation wiht associated structural upgrades, and one new bathroom.Details
selective interior renovation wiht associated structural upgrades, and one new bathroom. | $38,000 |
| Sep 19, 2018 | Completed final sign-off Oct 2019 | 441 Oak St | 3rd fl new bathroom, e bearing wall at living rm to be removed, new closet at bedroom, voluntary plywood strentheningDetails
3rd fl new bathroom, e bearing wall at living rm to be removed, new closet at bedroom, voluntary plywood strenthening | $5,000 |
| Jul 27, 2018 | Never finaled issued Jul 2018, no final | 441 Oak St | remodel (e) kitchen and two baths. (n) cabinets in existing locations, no structural work. plumbing and electrical under separate permit.Details
remodel (e) kitchen and two baths. (n) cabinets in existing locations, no structural work. plumbing and electrical under separate permit. | $15,000 |
| May 1, 2018 | Expired or cancelled expired Jul 2026 | 544 Clayton St | per ord# 162-16. add two units: 2 one bedroom units each to include a kitchen & bath.Details
per ord# 162-16. add two units: 2 one bedroom units each to include a kitchen & bath. | $150,000 |
| May 1, 2018 | Never finaled issued Apr 2019, no final | 445 Oak St | convert (e) 1st fl garage into a (n) 3 bedroom, 2 bath adu unit per ord# 162-16. remove & replace (e) fountation.Details
convert (e) 1st fl garage into a (n) 3 bedroom, 2 bath adu unit per ord# 162-16. remove & replace (e) fountation. | $100,000 |
| Mar 22, 2018 | Never finaled issued Jan 2020, no final | 544 Clayton St | per ordinance 43-14. legalize the 6th unit on the 4th flr. a (2) bedroom unit w/ kitchen & bath. fire alarm & sprinkler under separate permit.Details
per ordinance 43-14. legalize the 6th unit on the 4th flr. a (2) bedroom unit w/ kitchen & bath. fire alarm & sprinkler under separate permit. | $195,000 |
| Jun 10, 2015 | Never finaled issued Oct 2018, no final | 369 Duncan St | vertical & horiz addition.seismic upgrade,remodel&addition to(e)1-story sfd.bsmt-add(n)2nd unit( studio w/kitchen&bath).1/fl-remodel kitchen,living rm&dining rm.(n)2/fl-(n)3(n)bedrms,2(n)bath rms,(n)laundry,(n)roof.(n)3/fl-(n)family rm,office,bathrm& closets&(n)roof deck.Details
vertical & horiz addition.seismic upgrade,remodel&addition to(e)1-story sfd.bsmt-add(n)2nd unit( studio w/kitchen&bath).1/fl-remodel kitchen,living rm&dining rm.(n)2/fl-(n)3(n)bedrms,2(n)bath rms,(n)laundry,(n)roof.(n)3/fl-(n)family rm,office,bathrm& closets&(n)roof deck. | $500,000 |
| Jul 23, 2014 | Completed final sign-off Dec 2019 | 55 Homestead St | remodel (e) residence: vertical & horizontal addition:1) raise (e) bldg +- 9'-0". 2) add one story & one basement below. 3) add one story above bldg. add 3 bedrooms & 3 1/2 bathrooms.Details
remodel (e) residence: vertical & horizontal addition:1) raise (e) bldg +- 9'-0". 2) add one story & one basement below. 3) add one story above bldg. add 3 bedrooms & 3 1/2 bathrooms. | $645,000 |
| Sep 17, 2012 | Completed final sign-off Nov 2013 | 4564 19th St | remodel & addition all flrs of a (3) story over basement single family res. work includes: basement excavation for (n) habitable space w/(n) bath. 1st flr remodel & addition add bedroom, bath, laundry & play area. 2nd fl. remodeling & addition to expand kitchen & family room & add powder . 3rd flDetails
remodel & addition all flrs of a (3) story over basement single family res. work includes: basement excavation for (n) habitable space w/(n) bath. 1st flr remodel & addition add bedroom, bath, laundry & play area. 2nd fl. remodeling & addition to expand kitchen & family room & add powder . 3rd fl | $410,000 |
| Oct 27, 2011 | Completed final sign-off Mar 2012 | 1248 Leavenworth St | minor changes to 200710165569: 3 skylights and exterior delete angel at bay windows, front windows. spiral stair to rear yard instead of straight run stair. interior: minor floor plan changes to baths, closets, kitchens. structural: minor sturctural changes to accomodate interior changesDetails
minor changes to 200710165569: 3 skylights and exterior delete angel at bay windows, front windows. spiral stair to rear yard instead of straight run stair. interior: minor floor plan changes to baths, closets, kitchens. structural: minor sturctural changes to accomodate interior changes | $8,000 |
| Jun 4, 2009 | Completed final sign-off Dec 2009 | 2646 Chestnut St | 1st floor kitchen remodel, 2nd floor 2 1/2 bathroom remodel (2 on 2nd floor, 3rd floor add 1 bathroom.Details
1st floor kitchen remodel, 2nd floor 2 1/2 bathroom remodel (2 on 2nd floor, 3rd floor add 1 bathroom. | $100,000 |
| Jul 24, 2002 | Completed final sign-off Feb 2003 | 2111 Hyde St | remodel bathroom & powder room new plumbing, electrical, drywall. no structural work. no chg to sizeDetails
remodel bathroom & powder room new plumbing, electrical, drywall. no structural work. no chg to size | $25,000 |
| Jan 30, 2002 | Completed final sign-off Jun 2002 | 55 San Leandro Wy | remodel existing bathroom,new plumbing & electricc existing layout to remain.no change to plan confiDetails
remodel existing bathroom,new plumbing & electricc existing layout to remain.no change to plan confi | $25,000 |