Back to kitchen remodel contractors
Evra Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2007 to Oct 2025
- Last 24 months
- 1 permit filed
29 permits since 2000: 18 completed, 2 in progress, 5 never finaled, 4 expired or cancelled.
Of the 5 never-finaled permits, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
7 kitchen remodel permits: 4 completed, 2 in progress, 1 expired or cancelled. Typically 1 days from filing to permit and 116 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 24, 2025 | In progress issued May 2026 | 333 07th St | renovation of all restrooms and shower rooms. renovation of existing kitchen. skylight replacement. mep equipment and related roof penetrations. add new elevator incl pit and machine room.Details
renovation of all restrooms and shower rooms. renovation of existing kitchen. skylight replacement. mep equipment and related roof penetrations. add new elevator incl pit and machine room. | $2,345,530 |
| Apr 24, 2023 | In progress issued Jul 2024 | 5600 Geary Bl | addition of 1-kitchen in the existing buildingDetails
addition of 1-kitchen in the existing building | $35,000 |
| Oct 26, 2021 | Completed final sign-off Apr 2022 | 955 Corbett Av | replace water damaged cabinets with new, counters, sink, outlets. remodel (e) 1 kitchen & 1 bathroom. no structural work.Details
replace water damaged cabinets with new, counters, sink, outlets. remodel (e) 1 kitchen & 1 bathroom. no structural work. | $40,000 |
| Aug 4, 2015 | Completed final sign-off Oct 2015 | 38 Belcher St | install new kitchen cabinets,new sink, garbage disp,dish washer new counter tops, bathroom wall tile, floor tile new ceiling lights, install new flooring,no walls moved, removed, added or infilled.all (e) layouts to remian unchanged.Details
install new kitchen cabinets,new sink, garbage disp,dish washer new counter tops, bathroom wall tile, floor tile new ceiling lights, install new flooring,no walls moved, removed, added or infilled.all (e) layouts to remian unchanged. | $3,000 |
| Sep 15, 2014 | Expired or cancelled expired Oct 2021 | 2018 Webster St | renovation to (e) 4 story bldg add basement/garage level & a horiz add. up to the rear yard line for the 2/f & 3/f w/a 4/f deck each unit to have (n) kitchen.Details
renovation to (e) 4 story bldg add basement/garage level & a horiz add. up to the rear yard line for the 2/f & 3/f w/a 4/f deck each unit to have (n) kitchen. | $750,000 |
| Jan 24, 2008 | Completed final sign-off Oct 2008 | 2800 34th Av | straight remodel 2 bathrooms, replace all sheetrock on the house (except kitchen), install insulation in exterior walls, upgrade electrical (grounded outlets, gfi where needed). provide fluorescent light or occupany sensor in bathroom.Details
straight remodel 2 bathrooms, replace all sheetrock on the house (except kitchen), install insulation in exterior walls, upgrade electrical (grounded outlets, gfi where needed). provide fluorescent light or occupany sensor in bathroom. | $15,000 |
| Jul 9, 2007 | Completed final sign-off Aug 2007 | 731 Ellsworth St | remodel kitchen and two bathrooms, change electrical serviceDetails
remodel kitchen and two bathrooms, change electrical service | $20,000 |