Back to bathroom remodel contractors
Evra Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2007 to Oct 2025
- Last 24 months
- 1 permit filed
29 permits since 2000: 18 completed, 2 in progress, 5 never finaled, 4 expired or cancelled.
Of the 5 never-finaled permits, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 161 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 10, 2024 | Expired or cancelled expired Feb 2026 | 2326 Ulloa St | bathroom remodel: remove tile from walls and floor, remove bathtub, remove vanity, remove drywall to bare studs. install new drywall, install new bathtub, install new vanity and mirrors, install new tile on walls and floor. replace exhaust fan by one new one.Details
bathroom remodel: remove tile from walls and floor, remove bathtub, remove vanity, remove drywall to bare studs. install new drywall, install new bathtub, install new vanity and mirrors, install new tile on walls and floor. replace exhaust fan by one new one. | $8,000 |
| Oct 26, 2021 | Completed final sign-off Apr 2022 | 955 Corbett Av | replace water damaged cabinets with new, counters, sink, outlets. remodel (e) 1 kitchen & 1 bathroom. no structural work.Details
replace water damaged cabinets with new, counters, sink, outlets. remodel (e) 1 kitchen & 1 bathroom. no structural work. | $40,000 |
| Aug 18, 2021 | Completed final sign-off Mar 2023 | 630 Valencia St | structural: voluntary bracing of 4 exterior beams. architectural: patch back wall and ceiling finishes at structural work. new furring partition at drinking fountain. barrier removal: new accessible drinking fountain, bathroom signs, minor barrier removal at 2 public restrooms.Details
structural: voluntary bracing of 4 exterior beams. architectural: patch back wall and ceiling finishes at structural work. new furring partition at drinking fountain. barrier removal: new accessible drinking fountain, bathroom signs, minor barrier removal at 2 public restrooms. | $200,000 |
| Aug 4, 2015 | Completed final sign-off Oct 2015 | 38 Belcher St | install new kitchen cabinets,new sink, garbage disp,dish washer new counter tops, bathroom wall tile, floor tile new ceiling lights, install new flooring,no walls moved, removed, added or infilled.all (e) layouts to remian unchanged.Details
install new kitchen cabinets,new sink, garbage disp,dish washer new counter tops, bathroom wall tile, floor tile new ceiling lights, install new flooring,no walls moved, removed, added or infilled.all (e) layouts to remian unchanged. | $3,000 |
| Jan 24, 2008 | Completed final sign-off Oct 2008 | 2800 34th Av | straight remodel 2 bathrooms, replace all sheetrock on the house (except kitchen), install insulation in exterior walls, upgrade electrical (grounded outlets, gfi where needed). provide fluorescent light or occupany sensor in bathroom.Details
straight remodel 2 bathrooms, replace all sheetrock on the house (except kitchen), install insulation in exterior walls, upgrade electrical (grounded outlets, gfi where needed). provide fluorescent light or occupany sensor in bathroom. | $15,000 |
| Jul 9, 2007 | Completed final sign-off Aug 2007 | 731 Ellsworth St | remodel kitchen and two bathrooms, change electrical serviceDetails
remodel kitchen and two bathrooms, change electrical service | $20,000 |