Evergreen Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Feb 2017 to Jan 2025
- Last 24 months
- 1 permit filed
25 permits since 2000: 20 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 4 completed. Typically 27 days from filing to permit and 144 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 6, 2023 | Completed final sign-off Jun 2024 | 2478 27th Av | construct 2 bedroom, 2 full bathroom, media room & install wet bar at g/f. remove/in-fill (e) central patio. remove (e) kitchen, bathroom & add 1 new bathroom & re-built interior staircase at 2/f. construct new deck at rear of building (18'-6"x7'x9').Details
construct 2 bedroom, 2 full bathroom, media room & install wet bar at g/f. remove/in-fill (e) central patio. remove (e) kitchen, bathroom & add 1 new bathroom & re-built interior staircase at 2/f. construct new deck at rear of building (18'-6"x7'x9'). | $390,500 |
| Nov 20, 2018 | Completed final sign-off Jul 2019 | 2343 25th Av | 1st fl - excavation, add 2 bedrms, 2 baths, wet bar & media; relocated int. stair btw 1st & 2nd fl; in-fill lightwell @ south side; in-fill space under popout @ rear of bldg; replace (e) garage door; 3nd fl - reconfigure int layout w/2 bedrms, 2 baths, kitchen, living, dining rm & wic; add (n) intDetails
1st fl - excavation, add 2 bedrms, 2 baths, wet bar & media; relocated int. stair btw 1st & 2nd fl; in-fill lightwell @ south side; in-fill space under popout @ rear of bldg; replace (e) garage door; 3nd fl - reconfigure int layout w/2 bedrms, 2 baths, kitchen, living, dining rm & wic; add (n) int | $135,000 |
| May 2, 2018 | Completed final sign-off May 2019 | 2567 31st Av | repair existing front stair in kindDetails
repair existing front stair in kind | $5,000 |
| Feb 2, 2017 | Completed final sign-off May 2017 | 27 Sylvan Dr | remodel kitchen, replace fixtures in bathrooms, remove stairs & partition wall on 2nd floor. add 2 bedrooms, 2 full bathrooms, 2 storage, remove partition wall, add entry door on 1st floor. relocate water heater, furnace, upgrade electrical & plumbing system.Details
remodel kitchen, replace fixtures in bathrooms, remove stairs & partition wall on 2nd floor. add 2 bedrooms, 2 full bathrooms, 2 storage, remove partition wall, add entry door on 1st floor. relocate water heater, furnace, upgrade electrical & plumbing system. | $70,000 |