Back to kitchen remodel contractors
Evergreen Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Feb 2017 to Jan 2025
- Last 24 months
- 1 permit filed
25 permits since 2000: 20 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 9 completed, 1 expired or cancelled. Typically 22 days from filing to permit and 146 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 6, 2023 | Completed final sign-off Jun 2024 | 2478 27th Av | construct 2 bedroom, 2 full bathroom, media room & install wet bar at g/f. remove/in-fill (e) central patio. remove (e) kitchen, bathroom & add 1 new bathroom & re-built interior staircase at 2/f. construct new deck at rear of building (18'-6"x7'x9').Details
construct 2 bedroom, 2 full bathroom, media room & install wet bar at g/f. remove/in-fill (e) central patio. remove (e) kitchen, bathroom & add 1 new bathroom & re-built interior staircase at 2/f. construct new deck at rear of building (18'-6"x7'x9'). | $390,500 |
| Oct 2, 2023 | Completed final sign-off May 2024 | 86 Inverness Dr | 2/f: remodel (e) kitchen and bathroom, remove (e) non-structural wall at the kitchen area. g/f: add (1) bedroom, (1) family room (add 521sf habitable space), 2 bath and a wet bar at the media room. relocate and renew (e) furnance, water heater, washer and dryer. no exterior workDetails
2/f: remodel (e) kitchen and bathroom, remove (e) non-structural wall at the kitchen area. g/f: add (1) bedroom, (1) family room (add 521sf habitable space), 2 bath and a wet bar at the media room. relocate and renew (e) furnance, water heater, washer and dryer. no exterior work | $80,000 |
| Aug 23, 2022 | Completed final sign-off Jan 2025 | 1790 17th Av | rev to pa202207229174: interior remodel: 1/f: add 2 bedrooms, 2 bathrooms a media room & wetbar. 2/f: remodel (e) bathroom & kitchen (under pa202207229174); remodel powder room, convert breakfast room to a study room and add 1 a bathroom.Details
rev to pa202207229174: interior remodel: 1/f: add 2 bedrooms, 2 bathrooms a media room & wetbar. 2/f: remodel (e) bathroom & kitchen (under pa202207229174); remodel powder room, convert breakfast room to a study room and add 1 a bathroom. | $120,000 |
| Jul 22, 2022 | Expired or cancelled expired Jan 2025 | 1790 17th Av | 2/f: remove and replace drywall in 2 bedrooms, 1 living room and dining room. add more electrical receptacgles. remodel (e) 1 kitchen & 1 bathroom.Details
2/f: remove and replace drywall in 2 bedrooms, 1 living room and dining room. add more electrical receptacgles. remodel (e) 1 kitchen & 1 bathroom. | $50,000 |
| Jun 16, 2022 | Completed final sign-off Sep 2022 | 1336 South Van Ness Av | 2nd floor add 1 bathroom. garage add 1 bathroom. remodel 2nd floor kitchen .Details
2nd floor add 1 bathroom. garage add 1 bathroom. remodel 2nd floor kitchen . | $20,000 |
| Jan 11, 2019 | Completed final sign-off Jun 2019 | 2567 31st Av | remodel kitchen and bathroom on the second floor.Details
remodel kitchen and bathroom on the second floor. | $30,000 |
| Nov 20, 2018 | Completed final sign-off Jul 2019 | 2343 25th Av | 1st fl - excavation, add 2 bedrms, 2 baths, wet bar & media; relocated int. stair btw 1st & 2nd fl; in-fill lightwell @ south side; in-fill space under popout @ rear of bldg; replace (e) garage door; 3nd fl - reconfigure int layout w/2 bedrms, 2 baths, kitchen, living, dining rm & wic; add (n) intDetails
1st fl - excavation, add 2 bedrms, 2 baths, wet bar & media; relocated int. stair btw 1st & 2nd fl; in-fill lightwell @ south side; in-fill space under popout @ rear of bldg; replace (e) garage door; 3nd fl - reconfigure int layout w/2 bedrms, 2 baths, kitchen, living, dining rm & wic; add (n) int | $135,000 |
| Jun 11, 2018 | Completed final sign-off Jul 2018 | 368 Capitol Av | kitchen remodel. no change in openings and wall layout.Details
kitchen remodel. no change in openings and wall layout. | $5,000 |
| Sep 21, 2017 | Completed final sign-off Mar 2018 | 254 Thrift St | 1/f- remove 2 (e) storage shed @ rear yard, add 2 bedrooms, 2 full bath. 2/f- remove bearing wall to create open kitchen, add 1 full bath. modify (e) deck @ rearDetails
1/f- remove 2 (e) storage shed @ rear yard, add 2 bedrooms, 2 full bath. 2/f- remove bearing wall to create open kitchen, add 1 full bath. modify (e) deck @ rear | $50,000 |
| Feb 2, 2017 | Completed final sign-off May 2017 | 27 Sylvan Dr | remodel kitchen, replace fixtures in bathrooms, remove stairs & partition wall on 2nd floor. add 2 bedrooms, 2 full bathrooms, 2 storage, remove partition wall, add entry door on 1st floor. relocate water heater, furnace, upgrade electrical & plumbing system.Details
remodel kitchen, replace fixtures in bathrooms, remove stairs & partition wall on 2nd floor. add 2 bedrooms, 2 full bathrooms, 2 storage, remove partition wall, add entry door on 1st floor. relocate water heater, furnace, upgrade electrical & plumbing system. | $70,000 |