Back to kitchen remodel contractors
Evans & Wallace
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Jun 2016
- Last 24 months
- 0 permits filed
76 permits since 2000: 59 completed, 5 never finaled, 12 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 10 completed. Typically 0 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 13, 2016 | Completed final sign-off Nov 2016 | 141 Buena Vista East Av | kitchen remodel: replace fixtures & finishes in like-kind. new cabinets, countertops & wood flooring.Details
kitchen remodel: replace fixtures & finishes in like-kind. new cabinets, countertops & wood flooring. | $15,000 |
| Jan 13, 2016 | Completed final sign-off Mar 2016 | 809 Castro St | replace bath fixtures & finishes in like kind. add lighting at kitchenDetails
replace bath fixtures & finishes in like kind. add lighting at kitchen | $15,000 |
| Nov 20, 2014 | Completed final sign-off Apr 2015 | 3027 Anza St | replace kitchen cabinets in-like-kind, provide 5/8" diameter anchor bolts at sill plate, add plywood to (e) stud walls at basement where possible, install, insulation at basement and add 5/8" sheetrock at garage ceiling.Details
replace kitchen cabinets in-like-kind, provide 5/8" diameter anchor bolts at sill plate, add plywood to (e) stud walls at basement where possible, install, insulation at basement and add 5/8" sheetrock at garage ceiling. | $3,000 |
| Apr 25, 2014 | Completed final sign-off Sep 2014 | 3574 22nd St | on ground floor combine e studio and laundry rm into 1 larger family room. add front door entrance to this space. fill in the open space beneath kitchen at rear of building to create a guest rm with 1/2 bath. include a perforated drain system under this space.Details
on ground floor combine e studio and laundry rm into 1 larger family room. add front door entrance to this space. fill in the open space beneath kitchen at rear of building to create a guest rm with 1/2 bath. include a perforated drain system under this space. | $45,000 |
| Jan 15, 2014 | Completed final sign-off Jun 2014 | 61 Homestead St | remove interior bearing wall between kitchen/dining room, replace kitchen cabinets, fixtures & appliances in kind, replace upstairs bath fixtures & finishes in kind, replace 6 front windows in kind with solid wood windows/w/ogee lugs.Details
remove interior bearing wall between kitchen/dining room, replace kitchen cabinets, fixtures & appliances in kind, replace upstairs bath fixtures & finishes in kind, replace 6 front windows in kind with solid wood windows/w/ogee lugs. | $25,000 |
| Jul 29, 2010 | Completed final sign-off Apr 2011 | 251 Bonview St | kitchen remodeling at 2nd floor. add master bedroom, bathroom and media room at ground floor. new skylights.Details
kitchen remodeling at 2nd floor. add master bedroom, bathroom and media room at ground floor. new skylights. | $132,920 |
| Oct 6, 2009 | Completed final sign-off May 2010 | 3358 22nd St | kitchen & bedroom remodel to 3360 22nd (upper unit) in 2 unit building. bearing wall removal, voluntary seismic strengthening upgrade, window replacementDetails
kitchen & bedroom remodel to 3360 22nd (upper unit) in 2 unit building. bearing wall removal, voluntary seismic strengthening upgrade, window replacement | $86,000 |
| Jan 22, 2009 | Completed final sign-off Jan 2010 | 2200 Pacific Av | replace & refurbish finishes in condominium unit; replace cabinetry in guest bath & kitchen, replace sinks & faucets in bath & kitchen; new appliances, replace switches and receptacles throughout.Details
replace & refurbish finishes in condominium unit; replace cabinetry in guest bath & kitchen, replace sinks & faucets in bath & kitchen; new appliances, replace switches and receptacles throughout. | $90,000 |
| Jan 16, 2002 | Completed final sign-off Apr 2002 | 710 Page St | replace existing kitchen & cabinets and fixtures in existing locations. no structural workDetails
replace existing kitchen & cabinets and fixtures in existing locations. no structural work | $7,000 |
| Oct 2, 2001 | Completed final sign-off Mar 2002 | 1490 32nd Av | renovation of kitchen on upper floor, bathroom on lowerDetails
renovation of kitchen on upper floor, bathroom on lower | $40,000 |