Back to bathroom remodel contractors
Evans & Wallace
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Jun 2016
- Last 24 months
- 0 permits filed
76 permits since 2000: 59 completed, 5 never finaled, 12 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 13 completed. Typically 0 days from filing to permit and 148 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 14, 2016 | Completed final sign-off Sep 2016 | 2200 Pacific Av | revision of permit # 201503049899 to add new sheetrock at spare bedroom, new finishes at spare bathroomDetails
revision of permit # 201503049899 to add new sheetrock at spare bedroom, new finishes at spare bathroom | $15,000 |
| Jan 13, 2016 | Completed final sign-off Mar 2016 | 809 Castro St | replace bath fixtures & finishes in like kind. add lighting at kitchenDetails
replace bath fixtures & finishes in like kind. add lighting at kitchen | $15,000 |
| Sep 17, 2015 | Completed final sign-off Jan 2016 | 782 Elizabeth St | replace bathroom fixtures in-like kind.Details
replace bathroom fixtures in-like kind. | $15,000 |
| Mar 4, 2015 | Completed final sign-off Sep 2016 | 2200 Pacific Av | repair water damaged sheetrock walls at bedroom hall and bathroom - unit #4c w/ 5/8" type "x" sheetrock.Details
repair water damaged sheetrock walls at bedroom hall and bathroom - unit #4c w/ 5/8" type "x" sheetrock. | $5,000 |
| Apr 25, 2014 | Completed final sign-off Sep 2014 | 3574 22nd St | on ground floor combine e studio and laundry rm into 1 larger family room. add front door entrance to this space. fill in the open space beneath kitchen at rear of building to create a guest rm with 1/2 bath. include a perforated drain system under this space.Details
on ground floor combine e studio and laundry rm into 1 larger family room. add front door entrance to this space. fill in the open space beneath kitchen at rear of building to create a guest rm with 1/2 bath. include a perforated drain system under this space. | $45,000 |
| Jan 15, 2014 | Completed final sign-off Jun 2014 | 61 Homestead St | remove interior bearing wall between kitchen/dining room, replace kitchen cabinets, fixtures & appliances in kind, replace upstairs bath fixtures & finishes in kind, replace 6 front windows in kind with solid wood windows/w/ogee lugs.Details
remove interior bearing wall between kitchen/dining room, replace kitchen cabinets, fixtures & appliances in kind, replace upstairs bath fixtures & finishes in kind, replace 6 front windows in kind with solid wood windows/w/ogee lugs. | $25,000 |
| Nov 27, 2013 | Completed final sign-off May 2014 | 1306 York St | on ground floor level convert extg walk in closet storage room into a full bath. legalize extg exercise room. add electrical new plumbing where needed, add new skylight to 2nd floor hallway.Details
on ground floor level convert extg walk in closet storage room into a full bath. legalize extg exercise room. add electrical new plumbing where needed, add new skylight to 2nd floor hallway. | $21,000 |
| Jul 29, 2010 | Completed final sign-off Apr 2011 | 251 Bonview St | kitchen remodeling at 2nd floor. add master bedroom, bathroom and media room at ground floor. new skylights.Details
kitchen remodeling at 2nd floor. add master bedroom, bathroom and media room at ground floor. new skylights. | $132,920 |
| Jan 22, 2009 | Completed final sign-off Jan 2010 | 2200 Pacific Av | replace & refurbish finishes in condominium unit; replace cabinetry in guest bath & kitchen, replace sinks & faucets in bath & kitchen; new appliances, replace switches and receptacles throughout.Details
replace & refurbish finishes in condominium unit; replace cabinetry in guest bath & kitchen, replace sinks & faucets in bath & kitchen; new appliances, replace switches and receptacles throughout. | $90,000 |
| Sep 19, 2005 | Completed final sign-off Oct 2005 | 133 Palm Av | #4- bathroom remodel,new sheetrock,tile,replace (e)window,new shower,sink,toilet.no new electrical,Details
#4- bathroom remodel,new sheetrock,tile,replace (e)window,new shower,sink,toilet.no new electrical, | $10,000 |
| Aug 25, 2005 | Completed final sign-off Oct 2005 | 712 Page St | bathroom remodel. sheetrock close off one of two doors lights, plumbing. no structural work.Details
bathroom remodel. sheetrock close off one of two doors lights, plumbing. no structural work. | $10,000 |
| Oct 2, 2001 | Completed final sign-off Mar 2002 | 1490 32nd Av | renovation of kitchen on upper floor, bathroom on lowerDetails
renovation of kitchen on upper floor, bathroom on lower | $40,000 |
| Aug 27, 2001 | Completed final sign-off Dec 2001 | 807 Castro St | replace bathroom fixtures and finishes at existing locationsDetails
replace bathroom fixtures and finishes at existing locations | $6,000 |