Ethan Allen Construction
- Based in
- Canyon
- On San Francisco permits
- Aug 2008 to May 2015
- Last 24 months
- 0 permits filed
22 permits since 2000: 15 completed, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 34 days from filing to permit and 481 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 13, 2012 | Completed final sign-off Oct 2012 | 765 Sanchez St | revision to pa# 2009-1222-3701-add cabinets to garage, delete 2 kitchen windows, replace (e) garage window, replace (e) lower level stairs.Details
revision to pa# 2009-1222-3701-add cabinets to garage, delete 2 kitchen windows, replace (e) garage window, replace (e) lower level stairs. | |
| May 27, 2011 | Completed final sign-off Oct 2012 | 765 Sanchez St | revision to app#200912223701 to include change configuration of extg entry stair at front. reconfigure & reduce windows on pentroom by adding more wall at front and rear.Details
revision to app#200912223701 to include change configuration of extg entry stair at front. reconfigure & reduce windows on pentroom by adding more wall at front and rear. | |
| Dec 22, 2009 | Completed final sign-off Oct 2012 | 765 Sanchez St | vertical addition of new 4th fl including new roof deck. horizontal addition at front including new stair (interior) to 4th fl suite, new exterior entry stair from 3rd fl to grade at 2nd lvl, enlarge (e) rear deck at grade 1st fl, interior.Details
vertical addition of new 4th fl including new roof deck. horizontal addition at front including new stair (interior) to 4th fl suite, new exterior entry stair from 3rd fl to grade at 2nd lvl, enlarge (e) rear deck at grade 1st fl, interior. | $195,000 |