Ethan Allen Construction
- Based in
- Canyon
- On San Francisco permits
- Aug 2008 to May 2015
- Last 24 months
- 0 permits filed
22 permits since 2000: 15 completed, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 85 days from filing to permit and 666 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 3, 2014 | Completed final sign-off Oct 2018 | 4540 19th St | remodel of existing home conversion of basement to habitable space. horizontal addition at rear, upper story addition. new garage. upper story to be master bedroom & bathroom. horizontal addition to be living room.Details
remodel of existing home conversion of basement to habitable space. horizontal addition at rear, upper story addition. new garage. upper story to be master bedroom & bathroom. horizontal addition to be living room. | $560,000 |
| Oct 28, 2011 | Completed final sign-off Aug 2013 | 1051 Francisco St | revision to approv pa#2008-0811-8900 incl horizontal addition & interior remodel.bsmt-new entrance @ street,1st level-horizontal addition & interior remodel of lower unit. 2nd level-remodel beds & baths, 3rd level - remodel living,dining,kitchen.Details
revision to approv pa#2008-0811-8900 incl horizontal addition & interior remodel.bsmt-new entrance @ street,1st level-horizontal addition & interior remodel of lower unit. 2nd level-remodel beds & baths, 3rd level - remodel living,dining,kitchen. | |
| Jul 29, 2010 | Completed final sign-off Oct 2012 | 765 Sanchez St | revision to (e) pa# 2009/11/25/2135 to include: interior: 1st) reconfigure bath area & mudroom.2nd fl)reconfigure floor plan; 3rd fl)reconfigure powder/pantry; exterior: minor window layout changes on north &rear (some windows deleted or reduced;reduce(e) 2nd level rear deck(orig permit deleted)Details
revision to (e) pa# 2009/11/25/2135 to include: interior: 1st) reconfigure bath area & mudroom.2nd fl)reconfigure floor plan; 3rd fl)reconfigure powder/pantry; exterior: minor window layout changes on north &rear (some windows deleted or reduced;reduce(e) 2nd level rear deck(orig permit deleted) | |
| Nov 25, 2009 | Completed final sign-off Oct 2012 | 765 Sanchez St | remove (e) rear wood deck at 2nd level rear. 1st fl: add 1 bath, voluntary struc. upgrade. 2nd fl: add 1 bath, 1 bedroom to make 3 bed/ 3 bath. 3rd fl: remodel (e) kitchen, dining, living, (e) wood burning fp remains. ext. remodel: replace/enlarge (e) wdw at rear north side, upgrade decks.Details
remove (e) rear wood deck at 2nd level rear. 1st fl: add 1 bath, voluntary struc. upgrade. 2nd fl: add 1 bath, 1 bedroom to make 3 bed/ 3 bath. 3rd fl: remodel (e) kitchen, dining, living, (e) wood burning fp remains. ext. remodel: replace/enlarge (e) wdw at rear north side, upgrade decks. | $339,000 |