Esquivel Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2021 to Jun 2026
- Last 24 months
- 5 permits filed
15 permits since 2000: 11 completed, 3 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 1 completed, 2 in progress, 1 never finaled. Typically 378 days from filing to permit and 281 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2025 | In progress filed Dec 2025, not yet issued | 1119 Cole St | lower 1st floor slab, remodel 1/f & garage, relocate (e) full bath and add wet bar. connect new 1/f space to (e) 2/f unit w/ new internal spiral stair. excavate new patio area at rear of 1/f w/ stair up to grade level. demo (e) rear stair, replace with (n) spiral stair and landings.Details
lower 1st floor slab, remodel 1/f & garage, relocate (e) full bath and add wet bar. connect new 1/f space to (e) 2/f unit w/ new internal spiral stair. excavate new patio area at rear of 1/f w/ stair up to grade level. demo (e) rear stair, replace with (n) spiral stair and landings. | $180,000 |
| Jul 7, 2022 | In progress issued Jul 2024 | 347 Los Palmos Dr | add 3rd floor with bath, expand and remodel 2nd floor with new rear deck and stair, convert unconditioned space to habitable on 1st floor with new half bath.Details
add 3rd floor with bath, expand and remodel 2nd floor with new rear deck and stair, convert unconditioned space to habitable on 1st floor with new half bath. | $280,000 |
| Apr 11, 2022 | Never finaled filed Apr 2022, never issued | 2476 Great Hy | build new roof deck build new stair penthouse at roof build new spiral stairs at existing stair wellDetails
build new roof deck build new stair penthouse at roof build new spiral stairs at existing stair well | $100,000 |
| Sep 20, 2021 | Completed final sign-off Jul 2022 | 556 Mississippi St | remodel ktichen and bath, relocate laundry, replace(e) interior stair in kindDetails
remodel ktichen and bath, relocate laundry, replace(e) interior stair in kind | $120,000 |