Back to kitchen remodel contractors
Esquivel Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2021 to Jun 2026
- Last 24 months
- 5 permits filed
15 permits since 2000: 11 completed, 3 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 147 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 7, 2024 | Completed final sign-off Aug 2025 | 710 Broderick St | lower (e) slab 0f 1st floor unit 7 inchs. remodel unit including relocate kitchen and add french doorsDetails
lower (e) slab 0f 1st floor unit 7 inchs. remodel unit including relocate kitchen and add french doors | $25,000 |
| Feb 16, 2024 | Completed final sign-off May 2024 | 54 San Jose Av | kitchen remodel. remove existing to replace new cabinets, drywall, paint, electrical and plumbing. install new appliances.Details
kitchen remodel. remove existing to replace new cabinets, drywall, paint, electrical and plumbing. install new appliances. | $15,000 |
| Aug 21, 2023 | Completed final sign-off Nov 2023 | 800 Church St | apt #1: kitchen remodel. remove existing cabinets to replace with ne cabinets. install new electric for new applicance. lighting. install new drywall and paint. (e) kitchen 84 sq. ftDetails
apt #1: kitchen remodel. remove existing cabinets to replace with ne cabinets. install new electric for new applicance. lighting. install new drywall and paint. (e) kitchen 84 sq. ft | $2,800 |
| Sep 1, 2022 | Completed final sign-off Mar 2023 | 6516 California St | kitchen and bathroom remodelDetails
kitchen and bathroom remodel | $24,000 |
| Jun 2, 2022 | Completed final sign-off May 2023 | 1119 Cole St | remodel kitchen: replace ktichen cabinets, counter tops, & fixtures. replace tile in bathroom. no exterior work. all work in-kind interior.Details
remodel kitchen: replace ktichen cabinets, counter tops, & fixtures. replace tile in bathroom. no exterior work. all work in-kind interior. | $40,000 |