Envisage Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2013 to Oct 2020
- Last 24 months
- 0 permits filed
41 permits since 2000: 32 completed, 2 never finaled, 7 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 4 completed, 1 expired or cancelled. Typically 27 days from filing to permit and 1524 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 12, 2018 | Completed final sign-off Nov 2021 | 456 Vallejo St | front building: rev to pa# 201417191881; correcting/updating interior fl. plans, exterior stairs to roof deck, pg&e utility alcore and related structural plans (under sep permit), changes for unit 1, unit 2 and unit 3.and adustment to front & back window due to structuralDetails
front building: rev to pa# 201417191881; correcting/updating interior fl. plans, exterior stairs to roof deck, pg&e utility alcore and related structural plans (under sep permit), changes for unit 1, unit 2 and unit 3.and adustment to front & back window due to structural | $8,000 |
| Nov 30, 2015 | Expired or cancelled expired Dec 2018 | 590 Lombard St | revision to app #201409126230. relocating and moving internal stairs in unit 590 lombard st. and making change to the 4th floor interior layout. include bathroom. n/a for maher must maintain roof accessDetails
revision to app #201409126230. relocating and moving internal stairs in unit 590 lombard st. and making change to the 4th floor interior layout. include bathroom. n/a for maher must maintain roof access | $15,000 |
| Nov 19, 2014 | Completed final sign-off Nov 2021 | 456 Vallejo St | rear bldg: basement: convert storage to habitable space including study, bedroom and bath. remodel kitchen and relocate stair to upper floor. at top floor remodel bedrooms and bathroom. new wood siding at front. new window and new roof deck.Details
rear bldg: basement: convert storage to habitable space including study, bedroom and bath. remodel kitchen and relocate stair to upper floor. at top floor remodel bedrooms and bathroom. new wood siding at front. new window and new roof deck. | $250,000 |
| Nov 19, 2014 | Completed final sign-off Nov 2021 | 456 Vallejo St | front bldg: unit #1: remodel unit including kitchen & bathroom. unit# 2: remodel unit including kitchen & bathroom. unit# 3: remodel unit including kitchen & bath. convert storage area at 1st floor into habitalbe space. provide connecting stair. new private roof decks.Details
front bldg: unit #1: remodel unit including kitchen & bathroom. unit# 2: remodel unit including kitchen & bathroom. unit# 3: remodel unit including kitchen & bath. convert storage area at 1st floor into habitalbe space. provide connecting stair. new private roof decks. | $300,000 |
| Jul 17, 2014 | Completed final sign-off Oct 2015 | 2331 Bryant St | convert existing storage space 623 into habitable. add circular staircase to 1st fl, add 1 bath to each floor, interior remodels. convert 175 attic space to habitable space. bldg. to be fully sprinklered under sep. permitDetails
convert existing storage space 623 into habitable. add circular staircase to 1st fl, add 1 bath to each floor, interior remodels. convert 175 attic space to habitable space. bldg. to be fully sprinklered under sep. permit | $300,000 |