Back to bathroom remodel contractors
Envisage Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2013 to Oct 2020
- Last 24 months
- 0 permits filed
41 permits since 2000: 32 completed, 2 never finaled, 7 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 10 completed, 1 never finaled, 2 expired or cancelled. Typically 12 days from filing to permit and 282 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 16, 2019 | Completed final sign-off Jun 2020 | 20 Bellair Pl | demo partial interior, remodel kitchen, bathroom, new walls, drywall, new appliances, new replacement heaters, new flooring all full remodel including electrical and plumbing framing, all interior, no exterior on structuralDetails
demo partial interior, remodel kitchen, bathroom, new walls, drywall, new appliances, new replacement heaters, new flooring all full remodel including electrical and plumbing framing, all interior, no exterior on structural | $118,700 |
| Aug 8, 2019 | Completed final sign-off Jun 2020 | 22 Bellair Pl | demo interior, remodel kitchen, remodel bath, new drywall, new electrical outlets, swithes, fixtures, new plumbing fixtures, new flooring & tile, all remodel to interior of the apartment, no exterior changes, no structural changesDetails
demo interior, remodel kitchen, remodel bath, new drywall, new electrical outlets, swithes, fixtures, new plumbing fixtures, new flooring & tile, all remodel to interior of the apartment, no exterior changes, no structural changes | $118,000 |
| May 7, 2018 | Completed final sign-off Apr 2019 | 24 Bellair Pl | demo/remodel kitchen, new flooring, move bath, install new kitchenette, new bath, new bath, elec, paint. w/d hookups, new tile, plumbing fixtures, install hvac, new closet, new h waterheaterDetails
demo/remodel kitchen, new flooring, move bath, install new kitchenette, new bath, new bath, elec, paint. w/d hookups, new tile, plumbing fixtures, install hvac, new closet, new h waterheater | $131,200 |
| Sep 8, 2016 | Completed final sign-off Apr 2017 | 42 Farragut Av | revision to app#201603041266. demolition in kitchen, bathroom, flooring, closet and hallway. remodel of kitchen, bathroom and paint. replace flooring, light fixture, interior doors, exterior doors.Details
revision to app#201603041266. demolition in kitchen, bathroom, flooring, closet and hallway. remodel of kitchen, bathroom and paint. replace flooring, light fixture, interior doors, exterior doors. | |
| Aug 30, 2016 | Completed final sign-off Jan 2017 | 513 30th St | layout change/relocate 3 bedrooms, 2 bathrooms on 3rd floor. 1 bathroom on 2nd floor & new bathroom & office on 1st floor.Details
layout change/relocate 3 bedrooms, 2 bathrooms on 3rd floor. 1 bathroom on 2nd floor & new bathroom & office on 1st floor. | $50,000 |
| Jul 15, 2016 | Completed final sign-off Apr 2017 | 42 Farragut Av | demo kitchen, 2 baths, flooring,closets garage door single panel windows and 3 walls. repair roof, replace hot water tank, furnace, remodel kitchen , flooring, 2 bathrooms, move 1 bathroom, change storage into den/bedroom add 1 bathroom. replce garage door. paint house.Details
demo kitchen, 2 baths, flooring,closets garage door single panel windows and 3 walls. repair roof, replace hot water tank, furnace, remodel kitchen , flooring, 2 bathrooms, move 1 bathroom, change storage into den/bedroom add 1 bathroom. replce garage door. paint house. | $166,411 |
| Nov 30, 2015 | Expired or cancelled expired Dec 2018 | 590 Lombard St | revision to app #201409126230. relocating and moving internal stairs in unit 590 lombard st. and making change to the 4th floor interior layout. include bathroom. n/a for maher must maintain roof accessDetails
revision to app #201409126230. relocating and moving internal stairs in unit 590 lombard st. and making change to the 4th floor interior layout. include bathroom. n/a for maher must maintain roof access | $15,000 |
| Nov 19, 2014 | Completed final sign-off Nov 2021 | 456 Vallejo St | rear bldg: basement: convert storage to habitable space including study, bedroom and bath. remodel kitchen and relocate stair to upper floor. at top floor remodel bedrooms and bathroom. new wood siding at front. new window and new roof deck.Details
rear bldg: basement: convert storage to habitable space including study, bedroom and bath. remodel kitchen and relocate stair to upper floor. at top floor remodel bedrooms and bathroom. new wood siding at front. new window and new roof deck. | $250,000 |
| Nov 19, 2014 | Completed final sign-off Nov 2021 | 456 Vallejo St | front bldg: unit #1: remodel unit including kitchen & bathroom. unit# 2: remodel unit including kitchen & bathroom. unit# 3: remodel unit including kitchen & bath. convert storage area at 1st floor into habitalbe space. provide connecting stair. new private roof decks.Details
front bldg: unit #1: remodel unit including kitchen & bathroom. unit# 2: remodel unit including kitchen & bathroom. unit# 3: remodel unit including kitchen & bath. convert storage area at 1st floor into habitalbe space. provide connecting stair. new private roof decks. | $300,000 |
| Nov 17, 2014 | Never finaled issued Mar 2017, no final | 438 29th St | horizontal & vertical addition at rear. interior renovation to all floors of (e) single family home. included (n) kitchen, bedrooms & baths.Details
horizontal & vertical addition at rear. interior renovation to all floors of (e) single family home. included (n) kitchen, bedrooms & baths. | $700,000 |
| Jul 17, 2014 | Completed final sign-off Oct 2015 | 2331 Bryant St | convert existing storage space 623 into habitable. add circular staircase to 1st fl, add 1 bath to each floor, interior remodels. convert 175 attic space to habitable space. bldg. to be fully sprinklered under sep. permitDetails
convert existing storage space 623 into habitable. add circular staircase to 1st fl, add 1 bath to each floor, interior remodels. convert 175 attic space to habitable space. bldg. to be fully sprinklered under sep. permit | $300,000 |
| May 20, 2014 | Completed final sign-off Jan 2015 | 2331 Bryant St | demo drywall at ceilings and walls for exploratory purposes. partial demo kitchens and baths to expose conditions. partial demo 1st fl slab at rear. not full foundation removal.Details
demo drywall at ceilings and walls for exploratory purposes. partial demo kitchens and baths to expose conditions. partial demo 1st fl slab at rear. not full foundation removal. | $6,000 |
| Jul 25, 2013 | Expired or cancelled cancelled Nov 2024 | 513 30th St | horizontal addition to side and rear of building, including new roof, deck and additional bathrooms and bedrooms.Details
horizontal addition to side and rear of building, including new roof, deck and additional bathrooms and bedrooms. | $350,000 |