Engineered Soils Repairs

Contractor license
668184
State license record
Based in
Walnut Creek
On San Francisco permits
May 2000 to Sep 2026
Last 24 months
8 permits filed

175 permits since 2000: 145 completed, 6 in progress, 9 never finaled, 15 expired or cancelled.

Of the 9 never-finaled permits, 1 is 5 to 10 years old, 8 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Stairs permits

AllDeck 5Stairs 9

9 stairs permits: 6 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 92 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
May 8, 2019Completed
final sign-off Sep 2020
2541 California Stremove and replace siding at rear levation, install new moment frame and new footing at rear stair support. in kind deck repairs as needed under 50%. common area.
Details
Permit
201905080064
Status
complete
Filed
May 8, 2019
Permit issued
Jul 17, 2019
Final sign-off
Sep 10, 2020
Declared cost
$300,000
Address
2541 California St

remove and replace siding at rear levation, install new moment frame and new footing at rear stair support. in kind deck repairs as needed under 50%. common area.

Open the permit page

$300,000
Jun 28, 2016Completed
final sign-off Sep 2016
316 Rutledge Ststairway and basement area subdrain work, basement foundation wall damp proofing.
Details
Permit
201606281087
Status
complete
Filed
Jun 28, 2016
Permit issued
Jun 28, 2016
Final sign-off
Sep 14, 2016
Declared cost
$42,762
Address
316 Rutledge St

stairway and basement area subdrain work, basement foundation wall damp proofing.

Open the permit page

$42,762
Sep 3, 2015Expired or cancelled
cancelled Dec 2015
864 Chenery Stinstall approx. 4 ft of subdrain pipe extg light well area. install subdrain against foundation retaining wall near the intermediate stair landing area. ref permit # 2015-0812-4088 for (e) subdrain location at adjacent property 870 chenery st
Details
Permit
201509036126
Status
cancelled
Filed
Sep 3, 2015
Permit issued
Sep 3, 2015
Address
864 Chenery St

install approx. 4 ft of subdrain pipe extg light well area. install subdrain against foundation retaining wall near the intermediate stair landing area. ref permit # 2015-0812-4088 for (e) subdrain location at adjacent property 870 chenery st

Open the permit page

Aug 12, 2015Expired or cancelled
cancelled Dec 2015
870 Chenery Stinstall subdrain at the foundation/retaining wall near the intermediate stair landing, connect (n) sub drain to (e) sub drain system. ref permit application # 2105-0903-6126 for subdrain at adjacent property 864 chenery st
Details
Permit
201508124088
Status
cancelled
Filed
Aug 12, 2015
Permit issued
Sep 3, 2015
Declared cost
$10,000
Address
870 Chenery St

install subdrain at the foundation/retaining wall near the intermediate stair landing, connect (n) sub drain to (e) sub drain system. ref permit application # 2105-0903-6126 for subdrain at adjacent property 864 chenery st

Open the permit page

$10,000
Jun 6, 2007Completed
final sign-off Aug 2007
220 Upper Trsub drain and surface drainage system-remove and replace deck as necessary and stairs
Details
Permit
200706063201
Status
complete
Filed
Jun 6, 2007
Permit issued
Jun 6, 2007
Final sign-off
Aug 21, 2007
Declared cost
$14,000
Address
220 Upper Tr

sub drain and surface drainage system-remove and replace deck as necessary and stairs

Open the permit page

$14,000
Feb 12, 2007Completed
final sign-off May 2007
2545 Green Stbehind front retaining wall, drainage, waterproofing stairway/landing sub grade drainage & flashing repair work.
Details
Permit
200702123911
Status
complete
Filed
Feb 12, 2007
Permit issued
Feb 12, 2007
Final sign-off
May 30, 2007
Declared cost
$36,000
Address
2545 Green St

behind front retaining wall, drainage, waterproofing stairway/landing sub grade drainage & flashing repair work.

Open the permit page

$36,000
Feb 12, 2007Completed
final sign-off May 2007
2555 Green Stfront retaining wall, drainage, waterproofing, stairway/landing, sub grade drainage and flashing repair.
Details
Permit
200702123914
Status
complete
Filed
Feb 12, 2007
Permit issued
Feb 12, 2007
Final sign-off
May 30, 2007
Declared cost
$32,000
Address
2555 Green St

front retaining wall, drainage, waterproofing, stairway/landing, sub grade drainage and flashing repair.

Open the permit page

$32,000
Sep 20, 2004Completed
final sign-off Sep 2004
5160 Diamond Heights Blfoundation support at stairway tower to correct problems associated w/hillside erosion-final inspect
Details
Permit
200409204625
Status
complete
Filed
Sep 20, 2004
Permit issued
Sep 20, 2004
Final sign-off
Sep 21, 2004
Address
5160 Diamond Heights Bl

foundation support at stairway tower to correct problems associated w/hillside erosion-final inspect

Open the permit page

Jul 28, 2003Never finaled
issued Oct 2003, no final
5160 Diamond Heights Blfoundation support at a stairway tower to correct problems associated with hillside erosion
Details
Permit
200307280509
Status
issued
Filed
Jul 28, 2003
Permit issued
Oct 9, 2003
Declared cost
$15,625
Address
5160 Diamond Heights Bl

foundation support at a stairway tower to correct problems associated with hillside erosion

Open the permit page

$15,625