Engineered Soils Repairs
- Based in
- Walnut Creek
- On San Francisco permits
- May 2000 to Sep 2026
- Last 24 months
- 8 permits filed
175 permits since 2000: 145 completed, 6 in progress, 9 never finaled, 15 expired or cancelled.
Of the 9 never-finaled permits, 1 is 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
5 deck permits: 5 completed. Typically 14 days from filing to permit and 76 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 8, 2020 | Completed final sign-off Feb 2020 | 19 Sherwood Ct | replace failing piers for deck landing with reinforced concrete footing. install new wood posts and brackets.Details
replace failing piers for deck landing with reinforced concrete footing. install new wood posts and brackets. | $12,373 |
| May 8, 2019 | Completed final sign-off Sep 2020 | 2541 California St | remove and replace siding at rear levation, install new moment frame and new footing at rear stair support. in kind deck repairs as needed under 50%. common area.Details
remove and replace siding at rear levation, install new moment frame and new footing at rear stair support. in kind deck repairs as needed under 50%. common area. | $300,000 |
| Sep 28, 2016 | Completed final sign-off Dec 2016 | 425 Los Palmos Dr | deck support seismic improvements. install steel plate for 2 post/footing connections, install 1/2" plywood cripple wall at extg foundation wall. no reconstruction or expansion of (e) deck.Details
deck support seismic improvements. install steel plate for 2 post/footing connections, install 1/2" plywood cripple wall at extg foundation wall. no reconstruction or expansion of (e) deck. | $6,273 |
| Apr 25, 2013 | Completed final sign-off Jul 2014 | 150 Lombard St | waterproofing of courtyard deck & planting areas. new landscape & irrigation accessibility upgrades.Details
waterproofing of courtyard deck & planting areas. new landscape & irrigation accessibility upgrades. | $1,800,000 |
| Jun 6, 2007 | Completed final sign-off Aug 2007 | 220 Upper Tr | sub drain and surface drainage system-remove and replace deck as necessary and stairsDetails
sub drain and surface drainage system-remove and replace deck as necessary and stairs | $14,000 |