Block 0059, lot 005
150 Lombard St
- City’s use
- Single Family Residential
- Built
- 1975
- Stories
- 1
- Units
- 1
- Rooms
- 1 bathroom
- Building
- 1,015 sq ft
- Zoning
- RC4
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
23 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 25, 2021 | Completed final sign-off May 2022 | 150 Lombard St | Centric Building Inc. | bldg 1: revision to pa 202009023320. level 1 lighting control revision to add occpancy sensors.Details
bldg 1: revision to pa 202009023320. level 1 lighting control revision to add occpancy sensors. | |
| Dec 11, 2020 | Completed final sign-off May 2022 | 150 Lombard St | Centric Building Inc. | reference to pa #202009023320 - minor interior framing revision to add metal stud and gypboard clad "pilasters" to support permitted light cove. fixtures at floor 2-9Details
reference to pa #202009023320 - minor interior framing revision to add metal stud and gypboard clad "pilasters" to support permitted light cove. fixtures at floor 2-9 | |
| Sep 2, 2020 | Never finaled issued Oct 2020, no final | 150 Lombard St | Centric Building Inc. | bldg #1: interior remodel of existing building interior common corridors: new tile flooring on level 1, new finishes (wall to wall carpet, wall covering, paint) and replacing exisitng light fixtures with new low energy (lep) light fixtures; new led lighting at select locations as required by code.Details
bldg #1: interior remodel of existing building interior common corridors: new tile flooring on level 1, new finishes (wall to wall carpet, wall covering, paint) and replacing exisitng light fixtures with new low energy (lep) light fixtures; new led lighting at select locations as required by code. | $35,000 |
| Aug 26, 2019 | Never finaled issued Aug 2019, no final | 150 Lombard St | street spaceDetails
street space | ||
| Jan 30, 2018 | Completed final sign-off Mar 2018 | 150 Lombard St | Marchetti Group | reference 201610251117 - structural work for storage addition, change framing material from wood to steel maher naDetails
reference 201610251117 - structural work for storage addition, change framing material from wood to steel maher na | |
| Oct 25, 2016 | Completed final sign-off Mar 2018 | 150 Lombard St | Marchetti Group | 167 sq ft store room addition to (e) lobby building including (n) sink & electric workDetails
167 sq ft store room addition to (e) lobby building including (n) sink & electric work | $50,000 |
| Aug 22, 2014 | Never finaled issued Aug 2014, no final | 150 Lombard St | street spaceDetails
street space | ||
| Jul 24, 2014 | Never finaled issued Jul 2014, no final | 150 Lombard St | Access Systems & Solutions Inc | building 1 - install rooftop equipment for window washing, equipment not visible from street when not in use. reference pa #2014.0325.1642. n/a maher ordinanceDetails
building 1 - install rooftop equipment for window washing, equipment not visible from street when not in use. reference pa #2014.0325.1642. n/a maher ordinance | |
| Mar 25, 2014 | Completed final sign-off Jun 2014 | 150 Lombard St | Access Systems & Solutions Inc | install (davit bases) at rooftop equipment for window washing, not visible form street. compliance with ordinance #155-13 not requiredDetails
install (davit bases) at rooftop equipment for window washing, not visible form street. compliance with ordinance #155-13 not required | $220,000 |
| Nov 6, 2013 | Completed final sign-off Mar 2014 | 150 Lombard St | Siemens Industry, Inc. | 1st floor:addition of 1 horn/strobe and 1 strobe for the restroom additions. all new devices connect onto the fire alarm system. ref app#201309126598Details
1st floor:addition of 1 horn/strobe and 1 strobe for the restroom additions. all new devices connect onto the fire alarm system. ref app#201309126598 | $1,000 |
| Oct 24, 2013 | Completed final sign-off Jul 2014 | 150 Lombard St | Engineered Soils Repairs | common area only- rev. to pa# 201309126598: delete one accessible shower from scope of work, relocate water drinking fountains.Details
common area only- rev. to pa# 201309126598: delete one accessible shower from scope of work, relocate water drinking fountains. | |
| Sep 12, 2013 | Completed final sign-off Jul 2014 | 150 Lombard St | Robert L Brown Construction Inc. | revision to app#201304255489. change location of sink and toilet. also...revise original floor plans to correct errors.Details
revision to app#201304255489. change location of sink and toilet. also...revise original floor plans to correct errors. | |
| Apr 25, 2013 | Completed final sign-off Jul 2014 | 150 Lombard St | Engineered Soils Repairs | waterproofing of courtyard deck & planting areas. new landscape & irrigation accessibility upgrades.Details
waterproofing of courtyard deck & planting areas. new landscape & irrigation accessibility upgrades. | $1,800,000 |
| Oct 2, 2012 | Completed final sign-off Jan 2013 | 150 Lombard St | Acco Engineered Systems Inc. Dba Acco En | rev. to pa# 201204047496- replace 2 boilers, rev. 1. add sequence of operation & flue calculation for clarification located parking lot/basement level, new flues.Details
rev. to pa# 201204047496- replace 2 boilers, rev. 1. add sequence of operation & flue calculation for clarification located parking lot/basement level, new flues. | |
| Apr 4, 2012 | Completed final sign-off Jan 2013 | 150 Lombard St | Acco Engineered Systems Inc. Dba Acco En | replace (2) boilers. located in parking lot/basement on basement level, new flues.Details
replace (2) boilers. located in parking lot/basement on basement level, new flues. | $250,000 |
| Nov 17, 2010 | Completed final sign-off Mar 2012 | 150 Lombard St | Priority Architectural Graphics Dba Prio | (x27) emergency evacuation maps to be reviewed by sffd only.Details
(x27) emergency evacuation maps to be reviewed by sffd only. | $8,100 |
| Feb 13, 2009 | Completed final sign-off Feb 2009 | 150 Lombard St | Siemens Industry, Inc. | revision to pa# 2008-0806-8568-relocate smoke detectors & pulls-bldg #1,2,3,4-garage; relocate smoke detectors & pulls-bldg #1,2,3,4-street level; relocate smoke detectors & pulls-bldg #3,4-4th floorDetails
revision to pa# 2008-0806-8568-relocate smoke detectors & pulls-bldg #1,2,3,4-garage; relocate smoke detectors & pulls-bldg #1,2,3,4-street level; relocate smoke detectors & pulls-bldg #3,4-4th floor | |
| Aug 6, 2008 | Never finaled issued Aug 2008, no final | 150 Lombard St | Siemens Industry, Inc. | tenant improvement at garage area, street level bldg. 3 & 4. add 10 smoke detectors and relocate 15 pull stations.Details
tenant improvement at garage area, street level bldg. 3 & 4. add 10 smoke detectors and relocate 15 pull stations. | $5,000 |
| Nov 3, 2003 | Completed final sign-off Mar 2004 | 150 Lombard St | Wallace Remodeling Inc. | kitchen remodeling. new cabinets & counters.Details
kitchen remodeling. new cabinets & counters. | $25,000 |
| Jul 28, 2003 | Expired or cancelled expired Sep 2007 | 150 Lombard St | The Lawson Roofing Co Inc. | reroofingDetails
reroofing | $186,000 |
| Feb 5, 2003 | Never finaled issued Feb 2003, no final | 150 Lombard St | street spaceDetails
street space | ||
| Feb 4, 2003 | Never finaled issued Feb 2003, no final | 150 Lombard St | general upgrde to (e) bldng lobby & commo0n hallways-new paint, new carpets, new wallcover, wall patDetails
general upgrde to (e) bldng lobby & commo0n hallways-new paint, new carpets, new wallcover, wall pat | $20,000 | |
| Jan 7, 2000 | Expired or cancelled expired May 2000 | 150 Lombard St | renewalDetails
renewal | $11 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.