Elite Wood Design
- Based in
- Rancho Cordova
- On San Francisco permits
- Feb 2014 to Oct 2019
- Last 24 months
- 0 permits filed
6 permits since 2000: 4 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 1 days from filing to permit and 1056 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 3, 2019 | Completed final sign-off Aug 2022 | 4121 23rd St | conversion of unconditioned storage at 1st fl into habitable space. enclose exterior space at 1st fl under e habitable space, new bath 1st fl, new interior stairs from 1st to 2nd fl. relocate kitchen at 2nd fl. 3rd fl add new bath and remodel e bath. new windows, doors, siding at rear elevationDetails
conversion of unconditioned storage at 1st fl into habitable space. enclose exterior space at 1st fl under e habitable space, new bath 1st fl, new interior stairs from 1st to 2nd fl. relocate kitchen at 2nd fl. 3rd fl add new bath and remodel e bath. new windows, doors, siding at rear elevation | $85,000 |