Back to kitchen remodel contractors
Elite Wood Design
- Based in
- Rancho Cordova
- On San Francisco permits
- Feb 2014 to Oct 2019
- Last 24 months
- 0 permits filed
6 permits since 2000: 4 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 3 completed, 1 never finaled. Typically 0 days from filing to permit and 111 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 3, 2019 | Completed final sign-off Aug 2022 | 4121 23rd St | conversion of unconditioned storage at 1st fl into habitable space. enclose exterior space at 1st fl under e habitable space, new bath 1st fl, new interior stairs from 1st to 2nd fl. relocate kitchen at 2nd fl. 3rd fl add new bath and remodel e bath. new windows, doors, siding at rear elevationDetails
conversion of unconditioned storage at 1st fl into habitable space. enclose exterior space at 1st fl under e habitable space, new bath 1st fl, new interior stairs from 1st to 2nd fl. relocate kitchen at 2nd fl. 3rd fl add new bath and remodel e bath. new windows, doors, siding at rear elevation | $85,000 |
| Jun 14, 2019 | Completed final sign-off Oct 2019 | 723 Foerster St | kitchen remodel, update cabinets/countertops/flooring/backsplash, replace appliances w/out changing the layout; remove/replace knob wiring in the attic; install insulation in attic; addition of plug socket behind switch, addition of (2) lines for microwave.Details
kitchen remodel, update cabinets/countertops/flooring/backsplash, replace appliances w/out changing the layout; remove/replace knob wiring in the attic; install insulation in attic; addition of plug socket behind switch, addition of (2) lines for microwave. | $38,000 |
| Feb 5, 2015 | Completed final sign-off Apr 2015 | 16 Jessie St | unit #203: remove kitchen cabinet, install new cabinets, counter tops, re-install appliances at same location and pot filler, add 3 light ceiling (recessed lights) & light switches.Details
unit #203: remove kitchen cabinet, install new cabinets, counter tops, re-install appliances at same location and pot filler, add 3 light ceiling (recessed lights) & light switches. | $28,000 |
| Feb 24, 2014 | Never finaled issued Feb 2014, no final | 333 Bush St | #3801 - kitchen remodel - move the fridge, electrical, install new cabinets, countertop, appliancesDetails
#3801 - kitchen remodel - move the fridge, electrical, install new cabinets, countertop, appliances | $39,000 |