Back to kitchen remodel contractors
Electra Plumbing & Const
- Based in
- San Francisco
- On San Francisco permits
- Jan 2008 to Sep 2026
- Last 24 months
- 8 permits filed
53 permits since 2000: 46 completed, 4 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
23 kitchen remodel permits: 21 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 119 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 27, 2024 | Completed final sign-off Jul 2025 | 2525 Larkin St | unit 301. remodel of kitchen removal and replacement of all cabinets countertops, appliances and fixtures with like. no moving walls. approx. 100 sq ft.Details
unit 301. remodel of kitchen removal and replacement of all cabinets countertops, appliances and fixtures with like. no moving walls. approx. 100 sq ft. | $25,000 |
| Aug 23, 2024 | Completed final sign-off Nov 2024 | 2299 Pacific Av | unit 22-kitchen remodel: replacement of existing kitchen cabinets and countertop with like cabinets and counter. painting of kitchen.Details
unit 22-kitchen remodel: replacement of existing kitchen cabinets and countertop with like cabinets and counter. painting of kitchen. | $25,000 |
| Nov 17, 2023 | Completed final sign-off Jan 2024 | 3342 Divisadero St | add new skylight, add new passthrough opening between hall adn kitchen ref#: 202212289270Details
add new skylight, add new passthrough opening between hall adn kitchen ref#: 202212289270 | $10,000 |
| May 23, 2022 | Completed final sign-off Sep 2022 | 121 Santa Marina St | replacement of existing kitchen cabinets with like, new appliances, floor and sink. replacement of coutertops.Details
replacement of existing kitchen cabinets with like, new appliances, floor and sink. replacement of coutertops. | $20,000 |
| Jan 18, 2022 | Completed final sign-off Jun 2022 | 2338 Pine St | unit 3: bathroom and kitchen remodel. replace like cabinets and fixtures with likeDetails
unit 3: bathroom and kitchen remodel. replace like cabinets and fixtures with like | $20,000 |
| Dec 6, 2021 | Completed final sign-off Nov 2022 | 1725 Kearny St | one kitchan and one bath remodel: replace kitchen cabinets, countertops with like, replace kitchen flooring and appliances. retile 1 bath.Details
one kitchan and one bath remodel: replace kitchen cabinets, countertops with like, replace kitchen flooring and appliances. retile 1 bath. | $20,000 |
| Dec 6, 2021 | Completed final sign-off Jan 2022 | 2861 Webster St | unit 3: one kitchan and one bath remodel: kitchen remodel demo of e cabinets and countertops and replacement with updated same. replace carpeting with lvpDetails
unit 3: one kitchan and one bath remodel: kitchen remodel demo of e cabinets and countertops and replacement with updated same. replace carpeting with lvp | $20,000 |
| Nov 8, 2021 | Completed final sign-off Nov 2023 | 900 Bush St | unit 507. replace kitchen cabinets with like, replace flooring, appliances and fixturesDetails
unit 507. replace kitchen cabinets with like, replace flooring, appliances and fixtures | $20,000 |
| Mar 11, 2021 | Completed final sign-off Jul 2021 | 2861 Webster St | kitchen remodel - demolition of existing kitchen cabinets and countertops and replacement with updated.Details
kitchen remodel - demolition of existing kitchen cabinets and countertops and replacement with updated. | $20,000 |
| Sep 16, 2020 | Completed final sign-off Aug 2021 | 1150 Sacramento St | apt# 504: installation of kitchen cabinets, countertops, appliances, flooring and fixtures in kind.Details
apt# 504: installation of kitchen cabinets, countertops, appliances, flooring and fixtures in kind. | $35,000 |
| May 26, 2020 | Completed final sign-off Feb 2021 | 2525 Larkin St | apt#402 : replace existing kitchen cabinets with like, new countertops, appliances and bathroom fixtures. kitchen & bathroom remodel in-kind.Details
apt#402 : replace existing kitchen cabinets with like, new countertops, appliances and bathroom fixtures. kitchen & bathroom remodel in-kind. | $25,000 |
| Jan 17, 2020 | Completed final sign-off Oct 2023 | 818 Noe St | legalize rehabilitation of extg 225 sq ft rear yard deck extending from 2nd floor. kitchen with stairs to ground level.Details
legalize rehabilitation of extg 225 sq ft rear yard deck extending from 2nd floor. kitchen with stairs to ground level. | $18,000 |
| Sep 24, 2019 | Completed final sign-off Dec 2019 | 2861 Webster St | unit 10: kitchen remodel - demolition of existing cabinets and countertops and replacement with updated sameDetails
unit 10: kitchen remodel - demolition of existing cabinets and countertops and replacement with updated same | $25,000 |
| Aug 30, 2017 | Completed final sign-off Oct 2017 | 2861 Webster St | apartment #14: kitchen remodel. no structural changes. replacement of kitchen cabinets, countertops, with new same footprint.Details
apartment #14: kitchen remodel. no structural changes. replacement of kitchen cabinets, countertops, with new same footprint. | $21,300 |
| May 12, 2016 | Completed final sign-off Aug 2016 | 2595 Washington St | work in unit #6: kitchen remodel - removal and replacement of (e) cabinets, countertops, appliances in-kind. no structural changes.Details
work in unit #6: kitchen remodel - removal and replacement of (e) cabinets, countertops, appliances in-kind. no structural changes. | $21,160 |
| May 12, 2016 | Completed final sign-off May 2017 | 265 Union St | work in unit #3: kitchen remodel - removal and replacement of (e) cabinets, countertops, appliances in kind. no structural changes.Details
work in unit #3: kitchen remodel - removal and replacement of (e) cabinets, countertops, appliances in kind. no structural changes. | $21,160 |
| Feb 21, 2014 | Completed final sign-off Feb 2014 | 900 Bush St | removal and replacement of kitchen countertops and cabinets with same size. no new lighting or hoodDetails
removal and replacement of kitchen countertops and cabinets with same size. no new lighting or hood | $10,000 |
| May 10, 2013 | Completed final sign-off Jun 2013 | 2595 Washington St | kitchen remodel -removal and relacement at existing cabinets countertops floor, appliances in kind, no structural changes .Details
kitchen remodel -removal and relacement at existing cabinets countertops floor, appliances in kind, no structural changes . | $15,000 |
| May 10, 2011 | Completed final sign-off Sep 2011 | 2760 34th Av | replace (e) door in kitchen with pocket door. remodel (e) bathroom. new tile walls and floor. installation of tile floor in kitchen. no new lighting work under this permit.Details
replace (e) door in kitchen with pocket door. remodel (e) bathroom. new tile walls and floor. installation of tile floor in kitchen. no new lighting work under this permit. | $10,000 |
| Mar 7, 2011 | Completed final sign-off Sep 2011 | 2760 34th Av | replace (e) kitchen cabinets with new cabinets, new appliances and new counter-top. installation of vinyl floor. kitchen remodel onlyDetails
replace (e) kitchen cabinets with new cabinets, new appliances and new counter-top. installation of vinyl floor. kitchen remodel only | $15,000 |
| Nov 25, 2008 | Completed final sign-off Dec 2008 | 2595 Washington St | work @ unit# 4 only. replace (e) kitchen cabinets & appliance in (e) location.Details
work @ unit# 4 only. replace (e) kitchen cabinets & appliance in (e) location. | $15,000 |
| Sep 10, 2008 | Expired or cancelled cancelled Jan 2026 | 1088 Green St | install new door per plans at landing between ground floor and 2nd floor. remodel kitchen on 2nd flr, cabinets, vinyl floor, appliances, granite countertops, sink, and ldight fixtures.Details
install new door per plans at landing between ground floor and 2nd floor. remodel kitchen on 2nd flr, cabinets, vinyl floor, appliances, granite countertops, sink, and ldight fixtures. | $16,000 |
| Jan 9, 2008 | Never finaled issued Jan 2008, no final | 2525 Larkin St | replacement of (e) kitchen cabinets with same size, installation of new grantile counter top, appliances and new vinyl floor in apt #701. no changes to layout or structural changes.Details
replacement of (e) kitchen cabinets with same size, installation of new grantile counter top, appliances and new vinyl floor in apt #701. no changes to layout or structural changes. | $15,000 |