Back to bathroom remodel contractors
Electra Plumbing & Const
- Based in
- San Francisco
- On San Francisco permits
- Jan 2008 to Sep 2026
- Last 24 months
- 8 permits filed
53 permits since 2000: 46 completed, 4 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 12 completed. Typically 0 days from filing to permit and 160 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 28, 2022 | Completed final sign-off Jan 2024 | 3342 Divisadero St | interior remodel, re-arrange non-bearing partitions, created new bathroom, move laundry, new bathroom window, remove laundry windowDetails
interior remodel, re-arrange non-bearing partitions, created new bathroom, move laundry, new bathroom window, remove laundry window | $25,000 |
| May 23, 2022 | Completed final sign-off Nov 2022 | 1725 Kearny St | retile 2nd bathroom and replace fixtures for bath #2Details
retile 2nd bathroom and replace fixtures for bath #2 | $10,000 |
| Jan 18, 2022 | Completed final sign-off Oct 2022 | 1448 Filbert St | bathroom remodel. demo wall tile, install new tile, fixtures and trim. build closet for new hvac heater in hallway by removing old heater.Details
bathroom remodel. demo wall tile, install new tile, fixtures and trim. build closet for new hvac heater in hallway by removing old heater. | $20,000 |
| Jan 18, 2022 | Completed final sign-off Jun 2022 | 2338 Pine St | unit 3: bathroom and kitchen remodel. replace like cabinets and fixtures with likeDetails
unit 3: bathroom and kitchen remodel. replace like cabinets and fixtures with like | $20,000 |
| Dec 6, 2021 | Completed final sign-off Nov 2022 | 1725 Kearny St | one kitchan and one bath remodel: replace kitchen cabinets, countertops with like, replace kitchen flooring and appliances. retile 1 bath.Details
one kitchan and one bath remodel: replace kitchen cabinets, countertops with like, replace kitchen flooring and appliances. retile 1 bath. | $20,000 |
| Dec 6, 2021 | Completed final sign-off Jan 2022 | 2861 Webster St | unit 3: one kitchan and one bath remodel: kitchen remodel demo of e cabinets and countertops and replacement with updated same. replace carpeting with lvpDetails
unit 3: one kitchan and one bath remodel: kitchen remodel demo of e cabinets and countertops and replacement with updated same. replace carpeting with lvp | $20,000 |
| May 26, 2020 | Completed final sign-off Feb 2021 | 2525 Larkin St | apt#402 : replace existing kitchen cabinets with like, new countertops, appliances and bathroom fixtures. kitchen & bathroom remodel in-kind.Details
apt#402 : replace existing kitchen cabinets with like, new countertops, appliances and bathroom fixtures. kitchen & bathroom remodel in-kind. | $25,000 |
| Jan 17, 2020 | Completed final sign-off Jun 2020 | 25 Mountain Spring Av | replace glass block/window combo with aluminum-frame window at side bathroom on upper floor.Details
replace glass block/window combo with aluminum-frame window at side bathroom on upper floor. | $2,500 |
| Aug 12, 2015 | Completed final sign-off Sep 2015 | 1001 Pine St | demo extg tile surrounding tub, install new. no other work in bathroom.Details
demo extg tile surrounding tub, install new. no other work in bathroom. | $5,000 |
| Dec 24, 2012 | Completed final sign-off Sep 2013 | 4431 19th St | bathroom remodel - replace (e) tile with new tile, replace (e) window and door with same size, install new vanity. replace in kind/ max u -factor 0.4. no structural charges.Details
bathroom remodel - replace (e) tile with new tile, replace (e) window and door with same size, install new vanity. replace in kind/ max u -factor 0.4. no structural charges. | $15,000 |
| Nov 21, 2012 | Completed final sign-off Dec 2012 | 1885 Jackson St | unit #302-bathroom remodel-new tile wall & floor, vanity, toilet & shower valveDetails
unit #302-bathroom remodel-new tile wall & floor, vanity, toilet & shower valve | $15,500 |
| May 10, 2011 | Completed final sign-off Sep 2011 | 2760 34th Av | replace (e) door in kitchen with pocket door. remodel (e) bathroom. new tile walls and floor. installation of tile floor in kitchen. no new lighting work under this permit.Details
replace (e) door in kitchen with pocket door. remodel (e) bathroom. new tile walls and floor. installation of tile floor in kitchen. no new lighting work under this permit. | $10,000 |