Back to kitchen remodel contractors
Eignor Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2009 to Apr 2017
- Last 24 months
- 0 permits filed
70 permits since 2000: 60 completed, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
24 kitchen remodel permits: 21 completed, 3 never finaled. Typically 0 days from filing to permit and 202 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 18, 2017 | Completed final sign-off May 2017 | 1546 45th Av | application to revise scope of work of pa#201609076968 new scope of work: remodel kitchen and 2 bathroomsDetails
application to revise scope of work of pa#201609076968 new scope of work: remodel kitchen and 2 bathrooms | |
| Jan 30, 2017 | Completed final sign-off Jun 2017 | 110 15th Av | remodel 2nd floor kitchen and bathroom, remodel 3rd flr bathroom and bedrooms. new windows and skylightsDetails
remodel 2nd floor kitchen and bathroom, remodel 3rd flr bathroom and bedrooms. new windows and skylights | $24,000 |
| Dec 12, 2016 | Completed final sign-off Jun 2017 | 110 15th Av | remodel (e) kitchen and 2-1/2 bathrooms. no structural work. replace fixtures and finishes, upgrade electrical and plumbing. no walls moved, rmeoved, added or infilled. all (e) layouts to remain unchanged.Details
remodel (e) kitchen and 2-1/2 bathrooms. no structural work. replace fixtures and finishes, upgrade electrical and plumbing. no walls moved, rmeoved, added or infilled. all (e) layouts to remain unchanged. | $35,000 |
| Sep 7, 2016 | Completed final sign-off May 2017 | 1546 45th Av | remodel kitchen and 4 bathrooms. replace cabinetry, fixtures and finishes. no wall removal or structural work.Details
remodel kitchen and 4 bathrooms. replace cabinetry, fixtures and finishes. no wall removal or structural work. | $30,000 |
| Jul 25, 2016 | Completed final sign-off Jun 2017 | 2446 Washington St | kitchen remodel : change cabinets, fixtures and finishes. no structural work. no wall modification!Details
kitchen remodel : change cabinets, fixtures and finishes. no structural work. no wall modification! | $18,000 |
| Jan 11, 2016 | Completed final sign-off May 2017 | 335 Greenwich St | renovate existing kitchen and 1.5 bathroom - new fixtures and finishes, new hardwood floors throughout unit. upgrade electrical and plumbing. no walls moved, removed, added or infilled. all existing layout to remain unchanged.Details
renovate existing kitchen and 1.5 bathroom - new fixtures and finishes, new hardwood floors throughout unit. upgrade electrical and plumbing. no walls moved, removed, added or infilled. all existing layout to remain unchanged. | $25,000 |
| Apr 22, 2015 | Completed final sign-off Dec 2015 | 2011 Golden Gate Av | remodel kitchen; open up wall between sunroon and family/kitchen, enlarge entry to living room walkthru from 3' to 8'Details
remodel kitchen; open up wall between sunroon and family/kitchen, enlarge entry to living room walkthru from 3' to 8' | $54,000 |
| Mar 30, 2015 | Completed final sign-off Mar 2016 | 2253 Franklin St | interior remodel - 1 kitchen & 2-1/2 bathrooms. upgrade plumbing & electrical. refinish hardwood floors. no structural work. n/a maher ordinanceDetails
interior remodel - 1 kitchen & 2-1/2 bathrooms. upgrade plumbing & electrical. refinish hardwood floors. no structural work. n/a maher ordinance | $40,000 |
| Feb 27, 2015 | Completed final sign-off Nov 2015 | 908 Cabrillo St | remodel (e) kitchen (12' x 10') & 2 bathrooms (8' x 8' & 6' x 8'); replace fixtures, new cabinetry, new appliances, upgrade electrical.Details
remodel (e) kitchen (12' x 10') & 2 bathrooms (8' x 8' & 6' x 8'); replace fixtures, new cabinetry, new appliances, upgrade electrical. | $35,000 |
| Feb 18, 2015 | Completed final sign-off Mar 2019 | 3312 17th St | horiz addition @1st story com'l. infill of (e) lightwell @ 2nd & 3rd story new entry & exit stairs fr dwg. facade wk @(e)bldg. interior remodel (e) efficiency dwg unis. vert. addition of 4/f mezz w/2 new dwgs. fire sprinklers & elect wrk via seperate permit; add 2 bedrms & 2 kitchens & 2 bath.Details
horiz addition @1st story com'l. infill of (e) lightwell @ 2nd & 3rd story new entry & exit stairs fr dwg. facade wk @(e)bldg. interior remodel (e) efficiency dwg unis. vert. addition of 4/f mezz w/2 new dwgs. fire sprinklers & elect wrk via seperate permit; add 2 bedrms & 2 kitchens & 2 bath. | $527,068 |
| Nov 3, 2014 | Completed final sign-off Dec 2015 | 557 Dolores St | kitchen and bathroom remodel - all fixtures to remain in same location. repair to kitchen and bathroom and (e) hardwood floors due to water damage from unit above.Details
kitchen and bathroom remodel - all fixtures to remain in same location. repair to kitchen and bathroom and (e) hardwood floors due to water damage from unit above. | $8,000 |
| Jun 18, 2014 | Never finaled issued Jun 2014, no final | 676 Clipper St | unit 2, remodel existing kitchen, replace cabinets and fixtures, refinish existing floorsDetails
unit 2, remodel existing kitchen, replace cabinets and fixtures, refinish existing floors | $9,500 |
| Feb 3, 2014 | Never finaled issued Feb 2014, no final | 3864 25th St | kitchen & powder room remodel at 2nd fl;(n)plumbing fixtures, cabinets & coubtertops to repelace (e).no new wall & no (e)wall relocation.bring all electrical & pliumbing up to code.replace four (e)windows at rear of bldg in-kind,not visible from street. u-factor for all windows shall not exceed 0.4.Details
kitchen & powder room remodel at 2nd fl;(n)plumbing fixtures, cabinets & coubtertops to repelace (e).no new wall & no (e)wall relocation.bring all electrical & pliumbing up to code.replace four (e)windows at rear of bldg in-kind,not visible from street. u-factor for all windows shall not exceed 0.4. | $12,000 |
| Nov 26, 2013 | Completed final sign-off Jun 2014 | 1248 Montgomery St | interior remodel at 2nd fl. demo existing 2nd fl bath, new bath in existing storage space. cosmetic upgrades in kitchen and bedrooms. new window in existing location at rear of property. new window at property line wall at new bedroomDetails
interior remodel at 2nd fl. demo existing 2nd fl bath, new bath in existing storage space. cosmetic upgrades in kitchen and bedrooms. new window in existing location at rear of property. new window at property line wall at new bedroom | $25,000 |
| Apr 24, 2013 | Completed final sign-off Jul 2013 | 557 Dolores St | kitchen remodel- replace existing cabinets & fixtures in existing kitchen & adjecent laundry, upgrade plumbing & electrical, re-finish existing floors.Details
kitchen remodel- replace existing cabinets & fixtures in existing kitchen & adjecent laundry, upgrade plumbing & electrical, re-finish existing floors. | $15,000 |
| Jan 9, 2013 | Completed final sign-off Dec 2014 | 45 Belcher St | conversion of (e) storage to conditioned / living space to accomodate one new unit @ 1st floor. proposed kitchen & bath remodel @ 2nd floor. proposed new roof deck @ stairs connection to 3rd floor unit. all work to be performed within (e) laundry of building.Details
conversion of (e) storage to conditioned / living space to accomodate one new unit @ 1st floor. proposed kitchen & bath remodel @ 2nd floor. proposed new roof deck @ stairs connection to 3rd floor unit. all work to be performed within (e) laundry of building. | $120,000 |
| Jun 27, 2012 | Completed final sign-off Nov 2012 | 2211 Bryant St | remodel extg kitchen:new cabinets,add island cabnet to kichen.replace exgt plmg fixtures. up grade electrical to meet code.Details
remodel extg kitchen:new cabinets,add island cabnet to kichen.replace exgt plmg fixtures. up grade electrical to meet code. | $12,500 |
| Mar 12, 2012 | Completed final sign-off Feb 2014 | 17 Alta St | remodel & add'n to(e)historic residen. ext'r work include removal of shingle cladding @ front elevation & orig siding underneath be repaired/restored. at rear a small add'n be contructed w/(n)siding, roofing, doors, windows. int'r, 1st fl remodeled kitchen, dining rm & powder rm. 2nd fl: (n) bedrm.Details
remodel & add'n to(e)historic residen. ext'r work include removal of shingle cladding @ front elevation & orig siding underneath be repaired/restored. at rear a small add'n be contructed w/(n)siding, roofing, doors, windows. int'r, 1st fl remodeled kitchen, dining rm & powder rm. 2nd fl: (n) bedrm. | $150,000 |
| Jan 9, 2012 | Completed final sign-off May 2012 | 70 San Jacinto Wy | replace existing kitchen cabinets: replace existing plumbing fixtures. upgrade electrical to code. replace (2) existing doors at rear of property.Details
replace existing kitchen cabinets: replace existing plumbing fixtures. upgrade electrical to code. replace (2) existing doors at rear of property. | $15,000 |
| Jan 9, 2012 | Never finaled issued Jan 2012, no final | 1960 Golden Gate Av | revision to pa#201112150763. replace existing kitchen cabs; replace existing plumbing fixtures. upgrade electrical to code. replace existing windows at side of property. same size & location.lDetails
revision to pa#201112150763. replace existing kitchen cabs; replace existing plumbing fixtures. upgrade electrical to code. replace existing windows at side of property. same size & location.l | $6,500 |
| Oct 24, 2011 | Completed final sign-off Nov 2011 | 100 Saint Germain Av | kitchen remodel - replace existing kitchen cabinets and counters, replace existing plumbing fixtures, upgrade electrical, refinish existing hardwood floors.Details
kitchen remodel - replace existing kitchen cabinets and counters, replace existing plumbing fixtures, upgrade electrical, refinish existing hardwood floors. | $12,500 |
| Sep 13, 2011 | Completed final sign-off Dec 2011 | 972 Clayton St | replace existing clay sewer line from street to garage door, install new 50 gallon water heater, replace kitchen countertops @ 1/f unit, repair damaged/dryrot to existing exterior staircase, replace 2 existing doors for each unit, new concrete sidewalk @ rear yard,Details
replace existing clay sewer line from street to garage door, install new 50 gallon water heater, replace kitchen countertops @ 1/f unit, repair damaged/dryrot to existing exterior staircase, replace 2 existing doors for each unit, new concrete sidewalk @ rear yard, | $10,000 |
| Mar 17, 2011 | Completed final sign-off Apr 2011 | 1465 Hayes St | replace existing kitchen cabinets, upgrade electrical for new appliances, add water line for new fridge, re-tile kitchen floor, no change to (e) lightingDetails
replace existing kitchen cabinets, upgrade electrical for new appliances, add water line for new fridge, re-tile kitchen floor, no change to (e) lighting | $5,000 |
| May 5, 2009 | Completed final sign-off Mar 2010 | 524 Baker St | new master bathroom & enlarge opening at kitchen & dining room. also to comply with nov# 200857297 & add 2 new skylights.Details
new master bathroom & enlarge opening at kitchen & dining room. also to comply with nov# 200857297 & add 2 new skylights. | $8,000 |