Back to bathroom remodel contractors
Eignor Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2009 to Apr 2017
- Last 24 months
- 0 permits filed
70 permits since 2000: 60 completed, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
23 bathroom remodel permits: 23 completed. Typically 0 days from filing to permit and 202 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 18, 2017 | Completed final sign-off May 2017 | 1546 45th Av | application to revise scope of work of pa#201609076968 new scope of work: remodel kitchen and 2 bathroomsDetails
application to revise scope of work of pa#201609076968 new scope of work: remodel kitchen and 2 bathrooms | |
| Mar 29, 2017 | Completed final sign-off Jun 2017 | 972 Clayton St | bathroom remodel. no structural. all (e) framing to remain.Details
bathroom remodel. no structural. all (e) framing to remain. | $12,000 |
| Jan 30, 2017 | Completed final sign-off Jun 2017 | 110 15th Av | remodel 2nd floor kitchen and bathroom, remodel 3rd flr bathroom and bedrooms. new windows and skylightsDetails
remodel 2nd floor kitchen and bathroom, remodel 3rd flr bathroom and bedrooms. new windows and skylights | $24,000 |
| Dec 12, 2016 | Completed final sign-off Jun 2017 | 110 15th Av | remodel (e) kitchen and 2-1/2 bathrooms. no structural work. replace fixtures and finishes, upgrade electrical and plumbing. no walls moved, rmeoved, added or infilled. all (e) layouts to remain unchanged.Details
remodel (e) kitchen and 2-1/2 bathrooms. no structural work. replace fixtures and finishes, upgrade electrical and plumbing. no walls moved, rmeoved, added or infilled. all (e) layouts to remain unchanged. | $35,000 |
| Sep 7, 2016 | Completed final sign-off May 2017 | 1546 45th Av | remodel kitchen and 4 bathrooms. replace cabinetry, fixtures and finishes. no wall removal or structural work.Details
remodel kitchen and 4 bathrooms. replace cabinetry, fixtures and finishes. no wall removal or structural work. | $30,000 |
| Feb 8, 2016 | Completed final sign-off Apr 2016 | 1503 Golden Gate Av | remodel of (e) bathroom on 2nd floor; replace all (e) fixtures & finishes. compliance with maher ordinance no 155-13 not required.Details
remodel of (e) bathroom on 2nd floor; replace all (e) fixtures & finishes. compliance with maher ordinance no 155-13 not required. | $9,800 |
| Jan 11, 2016 | Completed final sign-off May 2017 | 335 Greenwich St | renovate existing kitchen and 1.5 bathroom - new fixtures and finishes, new hardwood floors throughout unit. upgrade electrical and plumbing. no walls moved, removed, added or infilled. all existing layout to remain unchanged.Details
renovate existing kitchen and 1.5 bathroom - new fixtures and finishes, new hardwood floors throughout unit. upgrade electrical and plumbing. no walls moved, removed, added or infilled. all existing layout to remain unchanged. | $25,000 |
| Oct 23, 2015 | Completed final sign-off Jan 2016 | 709 Broderick St | remodel 2 exisitng bathrooms, replace tile, fixtrues & finishes in 2 bathrooms.Details
remodel 2 exisitng bathrooms, replace tile, fixtrues & finishes in 2 bathrooms. | $15,000 |
| Aug 25, 2015 | Completed final sign-off Feb 2016 | 140 Yerba Buena Av | bathroom renovation - replace (e) tile, fixture and finishes. new window in office to replace (e). new cabinets in (e) laundry roomDetails
bathroom renovation - replace (e) tile, fixture and finishes. new window in office to replace (e). new cabinets in (e) laundry room | $10,000 |
| Mar 30, 2015 | Completed final sign-off Mar 2016 | 2253 Franklin St | interior remodel - 1 kitchen & 2-1/2 bathrooms. upgrade plumbing & electrical. refinish hardwood floors. no structural work. n/a maher ordinanceDetails
interior remodel - 1 kitchen & 2-1/2 bathrooms. upgrade plumbing & electrical. refinish hardwood floors. no structural work. n/a maher ordinance | $40,000 |
| Feb 27, 2015 | Completed final sign-off Nov 2015 | 908 Cabrillo St | remodel (e) kitchen (12' x 10') & 2 bathrooms (8' x 8' & 6' x 8'); replace fixtures, new cabinetry, new appliances, upgrade electrical.Details
remodel (e) kitchen (12' x 10') & 2 bathrooms (8' x 8' & 6' x 8'); replace fixtures, new cabinetry, new appliances, upgrade electrical. | $35,000 |
| Feb 18, 2015 | Completed final sign-off Mar 2019 | 3312 17th St | horiz addition @1st story com'l. infill of (e) lightwell @ 2nd & 3rd story new entry & exit stairs fr dwg. facade wk @(e)bldg. interior remodel (e) efficiency dwg unis. vert. addition of 4/f mezz w/2 new dwgs. fire sprinklers & elect wrk via seperate permit; add 2 bedrms & 2 kitchens & 2 bath.Details
horiz addition @1st story com'l. infill of (e) lightwell @ 2nd & 3rd story new entry & exit stairs fr dwg. facade wk @(e)bldg. interior remodel (e) efficiency dwg unis. vert. addition of 4/f mezz w/2 new dwgs. fire sprinklers & elect wrk via seperate permit; add 2 bedrms & 2 kitchens & 2 bath. | $527,068 |
| Nov 3, 2014 | Completed final sign-off Dec 2015 | 557 Dolores St | kitchen and bathroom remodel - all fixtures to remain in same location. repair to kitchen and bathroom and (e) hardwood floors due to water damage from unit above.Details
kitchen and bathroom remodel - all fixtures to remain in same location. repair to kitchen and bathroom and (e) hardwood floors due to water damage from unit above. | $8,000 |
| Nov 3, 2014 | Completed final sign-off Mar 2016 | 180 Manchester St | reconfiguration of stair, split large room into 2 rooms and bathroom, add small half bath & window.Details
reconfiguration of stair, split large room into 2 rooms and bathroom, add small half bath & window. | $50,000 |
| Nov 26, 2013 | Completed final sign-off Jun 2014 | 1248 Montgomery St | interior remodel at 2nd fl. demo existing 2nd fl bath, new bath in existing storage space. cosmetic upgrades in kitchen and bedrooms. new window in existing location at rear of property. new window at property line wall at new bedroomDetails
interior remodel at 2nd fl. demo existing 2nd fl bath, new bath in existing storage space. cosmetic upgrades in kitchen and bedrooms. new window in existing location at rear of property. new window at property line wall at new bedroom | $25,000 |
| Aug 9, 2013 | Completed final sign-off Nov 2013 | 140 Yerba Buena Av | convert existing storage room to full bathroomDetails
convert existing storage room to full bathroom | $15,000 |
| Jul 23, 2013 | Completed final sign-off Mar 2014 | 10 Lucky St | replace /repair existing plumbing and electrical in both units to comply with sf dbi code. voluntary compliance. remodel 2 existing bathroomsDetails
replace /repair existing plumbing and electrical in both units to comply with sf dbi code. voluntary compliance. remodel 2 existing bathrooms | $10,000 |
| Mar 27, 2013 | Completed final sign-off May 2013 | 324 Arguello Bl | remodel existing bathroom, replace existing fixtures, same location. new tiles, new vanity, add hook up for laundry in existing closet.Details
remodel existing bathroom, replace existing fixtures, same location. new tiles, new vanity, add hook up for laundry in existing closet. | $5,000 |
| Jan 9, 2013 | Completed final sign-off Dec 2014 | 45 Belcher St | conversion of (e) storage to conditioned / living space to accomodate one new unit @ 1st floor. proposed kitchen & bath remodel @ 2nd floor. proposed new roof deck @ stairs connection to 3rd floor unit. all work to be performed within (e) laundry of building.Details
conversion of (e) storage to conditioned / living space to accomodate one new unit @ 1st floor. proposed kitchen & bath remodel @ 2nd floor. proposed new roof deck @ stairs connection to 3rd floor unit. all work to be performed within (e) laundry of building. | $120,000 |
| Nov 14, 2012 | Completed final sign-off Mar 2013 | 3651 21st St | remodel 2 existing bathrooms on top floor, replace existing tub/shower new vanity cabinets in each bathrm, new tile on each bathrm no change in walls and opening layout, permanent lighting in bathroom shall be high efficacy or controlled by manual on occupancy sensorsDetails
remodel 2 existing bathrooms on top floor, replace existing tub/shower new vanity cabinets in each bathrm, new tile on each bathrm no change in walls and opening layout, permanent lighting in bathroom shall be high efficacy or controlled by manual on occupancy sensors | $6,500 |
| Jan 26, 2012 | Completed final sign-off Oct 2013 | 1366 Hayes St | interior remodel of 2 (e) bathrooms, alteration of (e) fireplaces from wood burning to gas direct vent. remove portion of (e) 2nd floor story non bearing partition wallDetails
interior remodel of 2 (e) bathrooms, alteration of (e) fireplaces from wood burning to gas direct vent. remove portion of (e) 2nd floor story non bearing partition wall | $40,000 |
| Sep 20, 2011 | Completed final sign-off May 2012 | 3864 25th St | add new bath on 1st floor den area and legalize den. adding window on rear elevation.Details
add new bath on 1st floor den area and legalize den. adding window on rear elevation. | $15,000 |
| May 5, 2009 | Completed final sign-off Mar 2010 | 524 Baker St | new master bathroom & enlarge opening at kitchen & dining room. also to comply with nov# 200857297 & add 2 new skylights.Details
new master bathroom & enlarge opening at kitchen & dining room. also to comply with nov# 200857297 & add 2 new skylights. | $8,000 |