Earlywood Carpentry
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Nov 2014
- Last 24 months
- 0 permits filed
12 permits since 2000: 10 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 0 days from filing to permit and 48 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 24, 2010 | Completed final sign-off Sep 2010 | 3732 23rd St | replace rotten stair stringer, replace all stair treads at same location in rear yard, replace four 10' lengths of 2x6" desk surface where rotten, comply with his 201060186. all in kind repair, less than 50% of stair structure.Details
replace rotten stair stringer, replace all stair treads at same location in rear yard, replace four 10' lengths of 2x6" desk surface where rotten, comply with his 201060186. all in kind repair, less than 50% of stair structure. | $1,520 |
| Dec 7, 2007 | Completed final sign-off Feb 2008 | 814 Fillmore St | repair add stairs @ side of property. handrails, top & bottom landing. less than 50%.Details
repair add stairs @ side of property. handrails, top & bottom landing. less than 50%. | $2,500 |