Back to bathroom remodel contractors
Earlywood Carpentry
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Nov 2014
- Last 24 months
- 0 permits filed
12 permits since 2000: 10 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 86 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 30, 2012 | Completed final sign-off Mar 2013 | 1244 30th Av | remodel kitchen, install new range, refrigerator, sink, upper & lower cabinets & counter top on (e). remodel bath upstairs, install new bathtub & vanities. remove closet wall construction in bathroom. construct wall in (e) bathroomDetails
remodel kitchen, install new range, refrigerator, sink, upper & lower cabinets & counter top on (e). remodel bath upstairs, install new bathtub & vanities. remove closet wall construction in bathroom. construct wall in (e) bathroom | $25,000 |
| Aug 1, 2011 | Completed final sign-off Nov 2011 | 103 Holly Park Cr | remodel bathroom, chagne out window, includes all fixtures and finishes and exhaust fan. no change of walls and openings.Details
remodel bathroom, chagne out window, includes all fixtures and finishes and exhaust fan. no change of walls and openings. | $18,000 |
| Aug 1, 2011 | Expired or cancelled cancelled Jan 2026 | 103 Holly Park Cr | remodel bathroom include change (e) window, all new fixtures, finishes & exhaust fanDetails
remodel bathroom include change (e) window, all new fixtures, finishes & exhaust fan | $18,000 |
| Dec 23, 2009 | Completed final sign-off Mar 2010 | 109 Scott St | remove drywall, 2 walls and ceiling in bathroom. replace exhaust fan and ceiling light fixtures. 2 elec outlets at sink vanity. install 1 light switch. new toilet and vanity sink. wainscotting and window trim and baseboard. provide he lights on sensor in bathDetails
remove drywall, 2 walls and ceiling in bathroom. replace exhaust fan and ceiling light fixtures. 2 elec outlets at sink vanity. install 1 light switch. new toilet and vanity sink. wainscotting and window trim and baseboard. provide he lights on sensor in bath | $8,000 |