E H B Construction
- Based in
- Daly City
- On San Francisco permits
- Aug 2001 to Aug 2023
- Last 24 months
- 0 permits filed
63 permits since 2000: 56 completed, 1 never finaled, 6 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
9 stairs permits: 8 completed, 1 never finaled. Typically 0 days from filing to permit and 97 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 7, 2022 | Completed final sign-off Jul 2022 | 1370 Florida St | revision to pa 202110281402. remove existing exterior stair and replace with new wood exterior stair in the rear of the building. stair for required means of egress.Details
revision to pa 202110281402. remove existing exterior stair and replace with new wood exterior stair in the rear of the building. stair for required means of egress. | $8,000 |
| Mar 21, 2019 | Completed final sign-off May 2019 | 305 Eureka St | repair stairs in kind @ back of building. less than 50% & not visible to stDetails
repair stairs in kind @ back of building. less than 50% & not visible to st | $20,000 |
| May 2, 2012 | Completed final sign-off May 2014 | 875 43rd Av | remodel extg kitchen at 2nd floor. and bath on 3rd floor. add non bearing walls in garage, replace front windows, upgrade elec and mech. systems. open wall between kitchen and dining room, repair rear stair from rear yard to 2nd floor. 3 rear windows replaced & one window infill.Details
remodel extg kitchen at 2nd floor. and bath on 3rd floor. add non bearing walls in garage, replace front windows, upgrade elec and mech. systems. open wall between kitchen and dining room, repair rear stair from rear yard to 2nd floor. 3 rear windows replaced & one window infill. | $50,000 |
| Sep 3, 2009 | Completed final sign-off Oct 2009 | 3814 26th St | remove upper flight rear stairs as per bldg code interpretation " egree 003-07", "delete exit for r3/2 units" main entry in front of house. add 42" guard rail to existing upper door. repair low fight of stairs.Details
remove upper flight rear stairs as per bldg code interpretation " egree 003-07", "delete exit for r3/2 units" main entry in front of house. add 42" guard rail to existing upper door. repair low fight of stairs. | $3,200 |
| Nov 10, 2006 | Completed final sign-off Feb 2007 | 12 Oakwood St | comply with nov# 200669202. replace (e) stairs and landing in kind or better.Details
comply with nov# 200669202. replace (e) stairs and landing in kind or better. | $31,000 |
| Jun 22, 2006 | Never finaled issued Jun 2006, no final | 12 Oakwood St | to comply with nov# 200669202. repair back stair as describe in city housing inspection complaint# 200669202. replace in kind less than 50%.Details
to comply with nov# 200669202. repair back stair as describe in city housing inspection complaint# 200669202. replace in kind less than 50%. | $6,800 |
| Feb 10, 2006 | Completed final sign-off May 2006 | 1243 21st Av | repair dry rot back stair and upper porch wall and replace door.Details
repair dry rot back stair and upper porch wall and replace door. | $8,200 |
| Aug 11, 2005 | Completed final sign-off Oct 2005 | 3970 18th St | replace back stairs in kindDetails
replace back stairs in kind | $9,200 |
| Feb 27, 2004 | Completed final sign-off Aug 2004 | 4448 20th St | replace back stairs in kind -to comply nov 200230776 dated 8/15/02 item #2.Details
replace back stairs in kind -to comply nov 200230776 dated 8/15/02 item #2. |