Back to bathroom remodel contractors
E H B Construction
- Based in
- Daly City
- On San Francisco permits
- Aug 2001 to Aug 2023
- Last 24 months
- 0 permits filed
63 permits since 2000: 56 completed, 1 never finaled, 6 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 15 completed. Typically 0 days from filing to permit and 105 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 6, 2021 | Completed final sign-off Aug 2021 | 91 States St | partial bathroom upgrade, 5'x10' approx. 50 sq. ft., like-for-like, bathroom fan shall comply w/cmc 403.7 & 502.2.1Details
partial bathroom upgrade, 5'x10' approx. 50 sq. ft., like-for-like, bathroom fan shall comply w/cmc 403.7 & 502.2.1 | $17,890 |
| Dec 13, 2019 | Completed final sign-off Jul 2020 | 232 Diamond St | open floors in bath and hallway to allow plumber to install new drain pipes & close up after . all work in kindDetails
open floors in bath and hallway to allow plumber to install new drain pipes & close up after . all work in kind | $8,000 |
| Aug 21, 2019 | Completed final sign-off Dec 2019 | 305 Eureka St | dry rot repair bathroom shower wall.Details
dry rot repair bathroom shower wall. | $7,500 |
| Jun 25, 2019 | Completed final sign-off Oct 2019 | 155 San Benito Wy | bathroom upgrade. remove and replace bath tub, remove and replace toilet, remove and replace vanity, remove and replace bathroom fan.Details
bathroom upgrade. remove and replace bath tub, remove and replace toilet, remove and replace vanity, remove and replace bathroom fan. | $28,000 |
| Jun 8, 2016 | Completed final sign-off Aug 2016 | 2715 Cabrillo St | remodel kitchen & bath. no change in opening & wall layout. kitchen lighting min 50% wattage high efficacy, bathroom lighting high efficacy or controlled by manual on sensor with high efficacy main light.Details
remodel kitchen & bath. no change in opening & wall layout. kitchen lighting min 50% wattage high efficacy, bathroom lighting high efficacy or controlled by manual on sensor with high efficacy main light. | $32,849 |
| Mar 11, 2015 | Completed final sign-off May 2015 | 1469 09th Av | upgrade bathroom @ 2nd floor - remove bathtub, install shower stall, relocate vanity, install fan exhaust thru roof, toilet to remain in same location. replace light fixture led. no structural work.Details
upgrade bathroom @ 2nd floor - remove bathtub, install shower stall, relocate vanity, install fan exhaust thru roof, toilet to remain in same location. replace light fixture led. no structural work. | $22,000 |
| Dec 12, 2014 | Completed final sign-off Mar 2015 | 1765 Pacific Av | upgrade hall bathroom 1-1/2, upgrade full bath with shower stall, install new tile & plumb fixtures, remove all tile & plumb fixturesDetails
upgrade hall bathroom 1-1/2, upgrade full bath with shower stall, install new tile & plumb fixtures, remove all tile & plumb fixtures | $15,000 |
| Sep 8, 2014 | Completed final sign-off Jan 2016 | 430 Irving St | change of occuapncy for r3 to r2 - convert an office space on the lower level of a 2 units residential bldg into 2 bedroom apt. new kitchen, bath,. building must be sprinklered through-out to nfpa 13. sprinkler system and fire alarm submittals under separate applications.Details
change of occuapncy for r3 to r2 - convert an office space on the lower level of a 2 units residential bldg into 2 bedroom apt. new kitchen, bath,. building must be sprinklered through-out to nfpa 13. sprinkler system and fire alarm submittals under separate applications. | $80,000 |
| Dec 5, 2013 | Completed final sign-off Jan 2014 | 1974 34th Av | water damage repair in bathroom, remove sheet rock, remove flooring, install new water valves for shower, re-install tile walls and tile floor.Details
water damage repair in bathroom, remove sheet rock, remove flooring, install new water valves for shower, re-install tile walls and tile floor. | $7,800 |
| May 14, 2013 | Completed final sign-off May 2013 | 704 Santiago St | open wall between bathroom and front room. repair broken drain pipe and refinish wall, open ceiling as needed.repair pipe.Details
open wall between bathroom and front room. repair broken drain pipe and refinish wall, open ceiling as needed.repair pipe. | $6,200 |
| May 2, 2012 | Completed final sign-off May 2014 | 875 43rd Av | remodel extg kitchen at 2nd floor. and bath on 3rd floor. add non bearing walls in garage, replace front windows, upgrade elec and mech. systems. open wall between kitchen and dining room, repair rear stair from rear yard to 2nd floor. 3 rear windows replaced & one window infill.Details
remodel extg kitchen at 2nd floor. and bath on 3rd floor. add non bearing walls in garage, replace front windows, upgrade elec and mech. systems. open wall between kitchen and dining room, repair rear stair from rear yard to 2nd floor. 3 rear windows replaced & one window infill. | $50,000 |
| May 8, 2008 | Completed final sign-off Sep 2008 | 1243 21st Av | renew pa# 2001/02/08/1680 (dry rot repair), pa# 2000/08/16/8082 (kitchen remodel), pa# 2000/08/15/7896 (new bathroom on 3rd floor) & pa# 2000/05/31/1430 (kitchen remodel) for final inspection only.Details
renew pa# 2001/02/08/1680 (dry rot repair), pa# 2000/08/16/8082 (kitchen remodel), pa# 2000/08/15/7896 (new bathroom on 3rd floor) & pa# 2000/05/31/1430 (kitchen remodel) for final inspection only. | |
| Jun 22, 2006 | Completed final sign-off Sep 2006 | 18 Lansing St | 1 kitchen remove existing wall shelving & install new cabinet. 1 bathroom remove bath tub & install shower. non structural work.Details
1 kitchen remove existing wall shelving & install new cabinet. 1 bathroom remove bath tub & install shower. non structural work. | $9,200 |
| Jun 13, 2002 | Completed final sign-off Nov 2002 | 2256 Cecilia Av | bathroom upgrade, dry rot, kitchen upgrade, replace windows 7 total, bolt down foundationDetails
bathroom upgrade, dry rot, kitchen upgrade, replace windows 7 total, bolt down foundation | $28,000 |
| Feb 21, 2002 | Completed final sign-off Jun 2003 | 578 Filbert St | kitchen & bathroom remodelDetails
kitchen & bathroom remodel | $36,500 |