Back to kitchen remodel contractors
E F Mcginness And Sons
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Dec 2021
- Last 24 months
- 0 permits filed
108 permits since 2000: 83 completed, 16 never finaled, 9 expired or cancelled.
Of the 16 never-finaled permits, 10 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 10 completed, 1 never finaled. Typically 1 days from filing to permit and 277 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 14, 2021 | Completed final sign-off Nov 2021 | 2030 Fell St | #10 - replace all fixtures, fittings and cosmetic items in the one bathroom and one kitchen and paint. no structural or layout changes. replace in kind approx 100 sf of rotted siding in lightwell outside the bathroom window. plumbing and electrical by othersDetails
#10 - replace all fixtures, fittings and cosmetic items in the one bathroom and one kitchen and paint. no structural or layout changes. replace in kind approx 100 sf of rotted siding in lightwell outside the bathroom window. plumbing and electrical by others | $18,000 |
| Dec 22, 2020 | Completed final sign-off Nov 2021 | 2577 Sacramento St | replace kitchen in-kind, due to concrete work on seismic upgradeDetails
replace kitchen in-kind, due to concrete work on seismic upgrade | $5,000 |
| Sep 24, 2020 | Never finaled issued Sep 2020, no final | 2732 Greenwich St | unit #2732 & #2734: remodel 2 kitchens and 2 bathrooms, laundry rooms. new cabinets, tile, counter tops, new flooring. no change to layout. all work in-kind.Details
unit #2732 & #2734: remodel 2 kitchens and 2 bathrooms, laundry rooms. new cabinets, tile, counter tops, new flooring. no change to layout. all work in-kind. | $80,000 |
| Aug 27, 2020 | Completed final sign-off Apr 2022 | 1469 Kearny St | interior remodel of 1467 & 1469 kearny apartments with newly enclosed 9sf habitable space at 1467 kitchen (enclose existing porch). enclose existing rear deck. revision to bath layout on pa #202002215052 at 1469 kearny bathroom, add scope of electrical at all bedrooms on 4th fl.Details
interior remodel of 1467 & 1469 kearny apartments with newly enclosed 9sf habitable space at 1467 kitchen (enclose existing porch). enclose existing rear deck. revision to bath layout on pa #202002215052 at 1469 kearny bathroom, add scope of electrical at all bedrooms on 4th fl. | $15,000 |
| Jun 13, 2020 | Completed final sign-off Nov 2021 | 2030 Fell St | unit #8: remodel kitchen - new cabinets, countertops, appliances.Details
unit #8: remodel kitchen - new cabinets, countertops, appliances. | $17,000 |
| May 13, 2019 | Completed final sign-off Jan 2021 | 3645 Washington St | install opening between kitchen and family room. (other work scope under separate permit 201904117789)Details
install opening between kitchen and family room. (other work scope under separate permit 201904117789) | $10,000 |
| Apr 11, 2019 | Completed final sign-off Jan 2021 | 3645 Washington St | demo & replace finish fixtures at kitchen 3 baths & half bath incl sinks, showers, toilets, vanities, new cabs, fixtures & surfaces. no structural. mep permits pulled separately.Details
demo & replace finish fixtures at kitchen 3 baths & half bath incl sinks, showers, toilets, vanities, new cabs, fixtures & surfaces. no structural. mep permits pulled separately. | $50,000 |
| Jul 10, 2018 | Completed final sign-off Jul 2020 | 101 Christopher Dr | renovate kitchen; bathroom; bedrooms & stair replacement. new master bedroom, bath within bldg envelope in ground floor. no exterior expansion. replace windows. no vinyl permitted. (new master bedroom @ basement level.)Details
renovate kitchen; bathroom; bedrooms & stair replacement. new master bedroom, bath within bldg envelope in ground floor. no exterior expansion. replace windows. no vinyl permitted. (new master bedroom @ basement level.) | $200,000 |
| Apr 11, 2012 | Completed final sign-off May 2012 | 950 Duncan St | unit #208 change out kitchen cabinets, countertops, sink & faucet & all appliances. no structural, no lighting change.Details
unit #208 change out kitchen cabinets, countertops, sink & faucet & all appliances. no structural, no lighting change. | $10,000 |
| Aug 24, 2011 | Completed final sign-off Oct 2011 | 3652 Clay St | strenghten underside framing at kitchen floor. replace concrete footing at existing exterior wall.Details
strenghten underside framing at kitchen floor. replace concrete footing at existing exterior wall. | $4,500 |
| Jul 13, 2011 | Completed final sign-off Dec 2011 | 3652 Clay St | remove all kitchen cabinetry. install new kitchen cabinets, sinks, faucets, waste disposal, new tile, new light fixtures. no structural work.Details
remove all kitchen cabinetry. install new kitchen cabinets, sinks, faucets, waste disposal, new tile, new light fixtures. no structural work. | $40,000 |