E - 5 Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2008 to Nov 2017
- Last 24 months
- 0 permits filed
65 permits since 2000: 50 completed, 7 never finaled, 8 expired or cancelled.
Of the 7 never-finaled permits, 2 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
16 stairs permits: 12 completed, 2 never finaled, 2 expired or cancelled. Typically 5 days from filing to permit and 151 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 5, 2017 | Completed final sign-off Jul 2018 | 2441 30th Av | repair/replace in-kind front exterior stairs due to dry rot & leak, not to exceed to exceed 50% max, components replace in-like-kind only.Details
repair/replace in-kind front exterior stairs due to dry rot & leak, not to exceed to exceed 50% max, components replace in-like-kind only. | $8,000 |
| Sep 22, 2016 | Completed final sign-off Aug 2017 | 2441 30th Av | at basement, convert unconditioned space and family room into habitable space. new bedeoom, bath and laundry room. provide new stairs to connect the 1st & 2nd flrs. repair (e) deck, relocate and remodel kitchen, relocate and remodel bathroom. add new bath at 1st & 2nd flrDetails
at basement, convert unconditioned space and family room into habitable space. new bedeoom, bath and laundry room. provide new stairs to connect the 1st & 2nd flrs. repair (e) deck, relocate and remodel kitchen, relocate and remodel bathroom. add new bath at 1st & 2nd flr | $80,000 |
| Sep 14, 2015 | Never finaled issued Sep 2015, no final | 67 Melrose Av | revision to app#201504143618. scope reduction: remove rear infill, remove cantilever balcony, revise stair. no relocation of kitchen.Details
revision to app#201504143618. scope reduction: remove rear infill, remove cantilever balcony, revise stair. no relocation of kitchen. | |
| Aug 6, 2015 | Completed final sign-off Jun 2019 | 3063 19th Av | whole house upgrade. 700 sq. ft. addition. garage, kitchen, master bedroom addition. new stairs, connecting all 3 story. kitchen, bathroom, game room & bar remodel.Details
whole house upgrade. 700 sq. ft. addition. garage, kitchen, master bedroom addition. new stairs, connecting all 3 story. kitchen, bathroom, game room & bar remodel. | $350,000 |
| Apr 14, 2015 | Completed final sign-off Apr 2016 | 67 Melrose Av | legalze (e) bedrm, bath & add fam room, powder rm, laundry rm, stairs @ lower floor. remodel (e) kitchen, dining, bedrms, add bath @ upper floor. exterior work: replace (e) windows, infill under (e) living spacr @ rear, (n) cantilever balcony at rear, new skylights.Details
legalze (e) bedrm, bath & add fam room, powder rm, laundry rm, stairs @ lower floor. remodel (e) kitchen, dining, bedrms, add bath @ upper floor. exterior work: replace (e) windows, infill under (e) living spacr @ rear, (n) cantilever balcony at rear, new skylights. | $120,000 |
| Dec 10, 2014 | Completed final sign-off Apr 2015 | 512 College Av | interior renovation of existing single family home that includes alteratio to the stairs at gg/f and creation of living room. 40 sf of garage space taken for laundry room and hallway; add 1 skylight.Details
interior renovation of existing single family home that includes alteratio to the stairs at gg/f and creation of living room. 40 sf of garage space taken for laundry room and hallway; add 1 skylight. | $25,000 |
| Aug 23, 2013 | Expired or cancelled cancelled Nov 2014 | 2044 Jefferson St | revision to pa #2012.0912.9502 - existing 2nd means of egress stairs shall not removed, building shall not be sprinklered throughout. roof deck to be enlarged. 1st floor closet to be enlarged.Details
revision to pa #2012.0912.9502 - existing 2nd means of egress stairs shall not removed, building shall not be sprinklered throughout. roof deck to be enlarged. 1st floor closet to be enlarged. | |
| May 29, 2013 | Completed final sign-off Sep 2013 | 1918 09th Av | remove 2nd flr balcony at rear yard; remove 1st flr covered porch at rear yard; in-fill at 1st flr, under habitable space (less than 10' above grade); interior remodel of den & bath at 1st flr, repl interior stairsDetails
remove 2nd flr balcony at rear yard; remove 1st flr covered porch at rear yard; in-fill at 1st flr, under habitable space (less than 10' above grade); interior remodel of den & bath at 1st flr, repl interior stairs | $42,000 |
| May 13, 2013 | Completed final sign-off Jan 2014 | 2339 26th Av | proposed relocated interior (e) stairs. not adding any habitable space at ground floorDetails
proposed relocated interior (e) stairs. not adding any habitable space at ground floor | $10,000 |
| Jan 3, 2013 | Completed final sign-off Jun 2013 | 1996 Mcallister St | (n) stairs to roof & (n) roof deck. remodel (e) kitchen, bathrooms & powder rm. repair dry rot at rear wall & re-roof powder rm.Details
(n) stairs to roof & (n) roof deck. remodel (e) kitchen, bathrooms & powder rm. repair dry rot at rear wall & re-roof powder rm. | $60,000 |
| Sep 12, 2012 | Expired or cancelled cancelled Nov 2014 | 2044 Jefferson St | remove (e) 2nd stairs, bldg to be full sprinklered per nfpa r-13 under seperate permit. social room remodel & expansion into garage. bathrm & closet remodel @2nd fl master bedrm. new laundry at 3rd fl, bathrm & closet remodel at 4th fl. expand (e) deck at 4th fl, seismic upgrade at 1st story levelDetails
remove (e) 2nd stairs, bldg to be full sprinklered per nfpa r-13 under seperate permit. social room remodel & expansion into garage. bathrm & closet remodel @2nd fl master bedrm. new laundry at 3rd fl, bathrm & closet remodel at 4th fl. expand (e) deck at 4th fl, seismic upgrade at 1st story level | $90,000 |
| Apr 4, 2012 | Completed final sign-off Sep 2012 | 1906 Powell St | 1)reconfigure extg storage and garage at 1st floor, 2)new powder room in storage. 3) new interior stairs from storage to hallway.Details
1)reconfigure extg storage and garage at 1st floor, 2)new powder room in storage. 3) new interior stairs from storage to hallway. | $22,000 |
| Nov 4, 2011 | Completed final sign-off Mar 2012 | 608 Mississippi St | repair dry rot on front stair. less than 50% total.Details
repair dry rot on front stair. less than 50% total. | $1,800 |
| Oct 5, 2011 | Completed final sign-off Feb 2012 | 1206 40th Av | replace kitchen cabinets. 2 new skylights on roof. remodel bath on lower floor. increase head room at existing stairsDetails
replace kitchen cabinets. 2 new skylights on roof. remodel bath on lower floor. increase head room at existing stairs | $18,000 |
| Aug 2, 2011 | Completed final sign-off Sep 2011 | 563 18th Av | re-stucco front stair, both side walls approx 100 sq. ft. area. work in common area.Details
re-stucco front stair, both side walls approx 100 sq. ft. area. work in common area. | $1,500 |
| Jan 11, 2008 | Never finaled issued Feb 2008, no final | 235 09th St | removate (e) bldg to provide commercial retail space w/new men's & women's restroom on the ground floor; and open offices private offices, & conference room on the 2nd floor. the project will provide an add'l exit stair at the back of the bldg to serve as a second egress for occupants on 2nd floor.Details
removate (e) bldg to provide commercial retail space w/new men's & women's restroom on the ground floor; and open offices private offices, & conference room on the 2nd floor. the project will provide an add'l exit stair at the back of the bldg to serve as a second egress for occupants on 2nd floor. | $75,000 |