Back to bathroom remodel contractors
E - 5 Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2008 to Nov 2017
- Last 24 months
- 0 permits filed
65 permits since 2000: 50 completed, 7 never finaled, 8 expired or cancelled.
Of the 7 never-finaled permits, 2 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
18 bathroom remodel permits: 17 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 223 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 6, 2017 | Completed final sign-off Dec 2017 | 248 Granada Av | remodel the bathroom: removethe tile and tub. in-kind, same size, same locations.Details
remodel the bathroom: removethe tile and tub. in-kind, same size, same locations. | $1,800 |
| Sep 22, 2016 | Completed final sign-off Aug 2017 | 2441 30th Av | at basement, convert unconditioned space and family room into habitable space. new bedeoom, bath and laundry room. provide new stairs to connect the 1st & 2nd flrs. repair (e) deck, relocate and remodel kitchen, relocate and remodel bathroom. add new bath at 1st & 2nd flrDetails
at basement, convert unconditioned space and family room into habitable space. new bedeoom, bath and laundry room. provide new stairs to connect the 1st & 2nd flrs. repair (e) deck, relocate and remodel kitchen, relocate and remodel bathroom. add new bath at 1st & 2nd flr | $80,000 |
| Aug 6, 2015 | Completed final sign-off Jun 2019 | 3063 19th Av | whole house upgrade. 700 sq. ft. addition. garage, kitchen, master bedroom addition. new stairs, connecting all 3 story. kitchen, bathroom, game room & bar remodel.Details
whole house upgrade. 700 sq. ft. addition. garage, kitchen, master bedroom addition. new stairs, connecting all 3 story. kitchen, bathroom, game room & bar remodel. | $350,000 |
| Apr 14, 2015 | Completed final sign-off Apr 2016 | 67 Melrose Av | legalze (e) bedrm, bath & add fam room, powder rm, laundry rm, stairs @ lower floor. remodel (e) kitchen, dining, bedrms, add bath @ upper floor. exterior work: replace (e) windows, infill under (e) living spacr @ rear, (n) cantilever balcony at rear, new skylights.Details
legalze (e) bedrm, bath & add fam room, powder rm, laundry rm, stairs @ lower floor. remodel (e) kitchen, dining, bedrms, add bath @ upper floor. exterior work: replace (e) windows, infill under (e) living spacr @ rear, (n) cantilever balcony at rear, new skylights. | $120,000 |
| Dec 2, 2014 | Completed final sign-off Jan 2020 | 138 Rey St | 2 story horizontal addition at rear yard, 4 new bedroom's , 3 new baths.Details
2 story horizontal addition at rear yard, 4 new bedroom's , 3 new baths. | $135,000 |
| Feb 14, 2014 | Completed final sign-off Aug 2014 | 160 Dorchester Wy | 2 bathrooms remodel on top floor; bathroom lighting shall be high efficacy or controlled by manual on sensor. no change to wall and opening layoutDetails
2 bathrooms remodel on top floor; bathroom lighting shall be high efficacy or controlled by manual on sensor. no change to wall and opening layout | $6,000 |
| Dec 27, 2013 | Completed final sign-off Mar 2015 | 526 Chenery St | horizontal addition at rear yard 300 sq. ft. new bathroom, partial foundation replacement replace 2 existing windows in kindDetails
horizontal addition at rear yard 300 sq. ft. new bathroom, partial foundation replacement replace 2 existing windows in kind | $48,000 |
| Jul 9, 2013 | Completed final sign-off Nov 2016 | 3984 20th St | vertical addition: new 2nd story with roof deck, 2 new bedrooms, 2 new baths, 1 kitchen remodel. replace foundations & seismic upgrade. convert storage area @ garage into habitable space. interior remodel of (e) dwelling.Details
vertical addition: new 2nd story with roof deck, 2 new bedrooms, 2 new baths, 1 kitchen remodel. replace foundations & seismic upgrade. convert storage area @ garage into habitable space. interior remodel of (e) dwelling. | $290,000 |
| May 29, 2013 | Completed final sign-off Sep 2013 | 1918 09th Av | remove 2nd flr balcony at rear yard; remove 1st flr covered porch at rear yard; in-fill at 1st flr, under habitable space (less than 10' above grade); interior remodel of den & bath at 1st flr, repl interior stairsDetails
remove 2nd flr balcony at rear yard; remove 1st flr covered porch at rear yard; in-fill at 1st flr, under habitable space (less than 10' above grade); interior remodel of den & bath at 1st flr, repl interior stairs | $42,000 |
| Feb 8, 2013 | Completed final sign-off Jun 2013 | 1996 Mcallister St | window replacement in kind, windows facing central ave & mcallister to be wood window w/ogee lugs for the double hung, windows facing rear yard at 2nd story to be vinyl clad wood windows, all (n) windows to be double glazed, max 0.4 'u' value ;windows at baths to be tempered glass, casement windowsDetails
window replacement in kind, windows facing central ave & mcallister to be wood window w/ogee lugs for the double hung, windows facing rear yard at 2nd story to be vinyl clad wood windows, all (n) windows to be double glazed, max 0.4 'u' value ;windows at baths to be tempered glass, casement windows | $13,000 |
| Jan 3, 2013 | Completed final sign-off Jun 2013 | 1996 Mcallister St | (n) stairs to roof & (n) roof deck. remodel (e) kitchen, bathrooms & powder rm. repair dry rot at rear wall & re-roof powder rm.Details
(n) stairs to roof & (n) roof deck. remodel (e) kitchen, bathrooms & powder rm. repair dry rot at rear wall & re-roof powder rm. | $60,000 |
| Oct 12, 2012 | Completed final sign-off Jun 2013 | 2039 Hayes St | unit#1 kitchen remodel update elec,plumb & replace furnace. unit#2 kitchen * bath remodel update elec & plumb. replace furnace. unit#3 update elect. unit#4 kitchen & bath remodel, update elec & plumb & replace furnace, elect panel upgrades in same location. no window/door changes.Details
unit#1 kitchen remodel update elec,plumb & replace furnace. unit#2 kitchen * bath remodel update elec & plumb. replace furnace. unit#3 update elect. unit#4 kitchen & bath remodel, update elec & plumb & replace furnace, elect panel upgrades in same location. no window/door changes. | $46,000 |
| Oct 20, 2011 | Expired or cancelled expired Jan 2016 | 74 Pond St | work only at: 74 pond street only: dry rot repair and remodel bathroom. dryrot repair in bathroom area, all work in kind approx 50 s.f.Details
work only at: 74 pond street only: dry rot repair and remodel bathroom. dryrot repair in bathroom area, all work in kind approx 50 s.f. | $7,000 |
| Oct 5, 2011 | Completed final sign-off Feb 2012 | 1206 40th Av | replace kitchen cabinets. 2 new skylights on roof. remodel bath on lower floor. increase head room at existing stairsDetails
replace kitchen cabinets. 2 new skylights on roof. remodel bath on lower floor. increase head room at existing stairs | $18,000 |
| Jul 15, 2010 | Completed final sign-off Apr 2011 | 2060 Grove St | bathroom remodelling on one level and laundry room remodelling on another unit. replace 3 existing service panels and wire upgrade. replace old plumbing with copper pipes. install central heating system. no new walls and no existing wall relocation.Details
bathroom remodelling on one level and laundry room remodelling on another unit. replace 3 existing service panels and wire upgrade. replace old plumbing with copper pipes. install central heating system. no new walls and no existing wall relocation. | $15,000 |
| Jun 21, 2010 | Completed final sign-off Aug 2011 | 60 Justin Dr | remodeling kitchen and bath. replacing electrical wires and updating plumbing. fixing dry rot below windows of house, replacing back windows. dry rot not visable from street.Details
remodeling kitchen and bath. replacing electrical wires and updating plumbing. fixing dry rot below windows of house, replacing back windows. dry rot not visable from street. | $30,000 |
| Aug 17, 2009 | Completed final sign-off Nov 2009 | 2260 Judah St | remodel kitchen and bathDetails
remodel kitchen and bath | $10,000 |
| Oct 8, 2008 | Completed final sign-off Dec 2008 | 2226 38th Av | to comply nov# 200866577- remove cabinet counter with wet sink including all utility lines to source in the existing laundry rm. relocate dryer,washer with laundry tray back to existing laundry rm. legalize full bath at ground floor.Details
to comply nov# 200866577- remove cabinet counter with wet sink including all utility lines to source in the existing laundry rm. relocate dryer,washer with laundry tray back to existing laundry rm. legalize full bath at ground floor. | $3,500 |