Back to kitchen remodel contractors
Dylan Arrants Construction
- Based in
- Oakland
- On San Francisco permits
- Jul 2004 to Mar 2021
- Last 24 months
- 0 permits filed
44 permits since 2000: 26 completed, 8 never finaled, 10 expired or cancelled.
Of the 8 never-finaled permits, 2 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 never finaled. Typically 74 days from filing to permit and 1018 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 25, 2021 | Never finaled issued Jun 2021, no final | 1701 Franklin St | kitchen remodel and shear wall alteration.Details
kitchen remodel and shear wall alteration. | $20,000 |
| Apr 18, 2019 | Completed final sign-off Jun 2025 | 1 Daniel Burnham Ct | on 10th floor unit 1014 -interior renovation including kitchen and bath n/a maherDetails
on 10th floor unit 1014 -interior renovation including kitchen and bath n/a maher | $35,000 |
| Nov 6, 2006 | Completed final sign-off Jan 2007 | 80 Diamond St | kitchen remodel, remove non-structural pantry, insulate, new sheetrock (50%) within the kitchen, replace cabinets, appliances, replace 1 window (+3'from property line) with compliance low-e unit. u factor, less than .67.Details
kitchen remodel, remove non-structural pantry, insulate, new sheetrock (50%) within the kitchen, replace cabinets, appliances, replace 1 window (+3'from property line) with compliance low-e unit. u factor, less than .67. | $20,000 |