Back to bathroom remodel contractors
Dylan Arrants Construction
- Based in
- Oakland
- On San Francisco permits
- Jul 2004 to Mar 2021
- Last 24 months
- 0 permits filed
44 permits since 2000: 26 completed, 8 never finaled, 10 expired or cancelled.
Of the 8 never-finaled permits, 2 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
7 bathroom remodel permits: 4 completed, 3 expired or cancelled. Typically 1 days from filing to permit and 529 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 18, 2019 | Completed final sign-off Jun 2025 | 1 Daniel Burnham Ct | on 10th floor unit 1014 -interior renovation including kitchen and bath n/a maherDetails
on 10th floor unit 1014 -interior renovation including kitchen and bath n/a maher | $35,000 |
| Sep 18, 2018 | Completed final sign-off Jul 2019 | 1701 Franklin St | new half bath with sink, vanity and w.c and door on first floor.Details
new half bath with sink, vanity and w.c and door on first floor. | $7,000 |
| Mar 20, 2015 | Completed final sign-off May 2017 | 1800 Mission St | enlarge existing bathroom to a new womens's restroom for patrons at events at the drill court. upgrade of finishes in men's room. all work is within building envelope. maher n/a.Details
enlarge existing bathroom to a new womens's restroom for patrons at events at the drill court. upgrade of finishes in men's room. all work is within building envelope. maher n/a. | $89,000 |
| Aug 12, 2009 | Expired or cancelled revoked Sep 2009 | 281 Harvard St | remodel bathroom. add skylight and replace existing window in bathroom from single glaze to double glaze. no change in size or loc.Details
remodel bathroom. add skylight and replace existing window in bathroom from single glaze to double glaze. no change in size or loc. | $10,000 |
| May 21, 2009 | Completed final sign-off Jul 2009 | 16 Ord Ct | remodel bathroom, replace tub, fixture, demo/replace sheetrock. new tile, new pocket door at bathroom.Details
remodel bathroom, replace tub, fixture, demo/replace sheetrock. new tile, new pocket door at bathroom. | $10,000 |
| May 6, 2008 | Expired or cancelled expired Nov 2010 | 33 Harper St | remodel 2nd floor bathroom. demo drywall, reframe/block for new fixtures/tile. insulate, redo interior finishesDetails
remodel 2nd floor bathroom. demo drywall, reframe/block for new fixtures/tile. insulate, redo interior finishes | $20,000 |
| Jul 5, 2007 | Expired or cancelled expired Jan 2010 | 1191 Dolores St | revision to pa# 2005/11/16/8253. add 2 new dormers, relocate permitted 2 dormers. relocated permitted bathroom. add skylight above stairs.Details
revision to pa# 2005/11/16/8253. add 2 new dormers, relocate permitted 2 dormers. relocated permitted bathroom. add skylight above stairs. | $18,000 |