Dw & Jy Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2008 to Nov 2022
- Last 24 months
- 0 permits filed
18 permits since 2000: 16 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 109 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 17, 2017 | Completed final sign-off Feb 2019 | 243 Farallones St | change master bedrm to other side. remodel (e) kitchen, turn (e) bathrm to master bath. turn breakfast nook to hall bath. remove & install new drywall with insulation. new lighting & electrical throughout 2nd floor. reconfigure dining room into new bedroom with closet. replace windows in both baths.Details
change master bedrm to other side. remodel (e) kitchen, turn (e) bathrm to master bath. turn breakfast nook to hall bath. remove & install new drywall with insulation. new lighting & electrical throughout 2nd floor. reconfigure dining room into new bedroom with closet. replace windows in both baths. | $50,000 |
| Dec 2, 2016 | Completed final sign-off Jan 2017 | 595 Ofarrell St | rev. to 201610271276; remodel kitchen cabinets & countertop for unit 4Details
rev. to 201610271276; remodel kitchen cabinets & countertop for unit 4 | $6,000 |
| Nov 26, 2012 | Completed final sign-off Mar 2013 | 1723 27th Av | kitchen and bathroom remodel; kitchen lighting min 50% total wattage high efficacy, bath lighting, high efficacy unless controlled by occupancy sensorDetails
kitchen and bathroom remodel; kitchen lighting min 50% total wattage high efficacy, bath lighting, high efficacy unless controlled by occupancy sensor | $9,000 |
| May 17, 2012 | Completed final sign-off Jun 2014 | 264 Ewing Tr | interior remodel: adding master bedroom at ground floor, replace extg furnace and water heater at same location and remodel bathroom and kitchen at 2nd floor as per plan.Details
interior remodel: adding master bedroom at ground floor, replace extg furnace and water heater at same location and remodel bathroom and kitchen at 2nd floor as per plan. | $38,000 |
| Feb 6, 2009 | Completed final sign-off Mar 2009 | 1871 Green St | remove kitchen and one full bathroom. replace cabinets sink. floor. bath tubDetails
remove kitchen and one full bathroom. replace cabinets sink. floor. bath tub | $12,000 |