Back to bathroom remodel contractors
Dw & Jy Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2008 to Nov 2022
- Last 24 months
- 0 permits filed
18 permits since 2000: 16 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 9 completed, 1 expired or cancelled. Typically 13 days from filing to permit and 198 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 17, 2017 | Completed final sign-off Feb 2019 | 243 Farallones St | change master bedrm to other side. remodel (e) kitchen, turn (e) bathrm to master bath. turn breakfast nook to hall bath. remove & install new drywall with insulation. new lighting & electrical throughout 2nd floor. reconfigure dining room into new bedroom with closet. replace windows in both baths.Details
change master bedrm to other side. remodel (e) kitchen, turn (e) bathrm to master bath. turn breakfast nook to hall bath. remove & install new drywall with insulation. new lighting & electrical throughout 2nd floor. reconfigure dining room into new bedroom with closet. replace windows in both baths. | $50,000 |
| Oct 27, 2016 | Completed final sign-off Jan 2017 | 595 Ofarrell St | unit 4: remodel of bathroom; no structural changes.Details
unit 4: remodel of bathroom; no structural changes. | $6,000 |
| Apr 11, 2016 | Completed final sign-off Jan 2017 | 2732 36th Av | add two full bathroom, one sturdy room, one bedroom, one mud room & one storage on 1st floor per plan.Details
add two full bathroom, one sturdy room, one bedroom, one mud room & one storage on 1st floor per plan. | $40,000 |
| Sep 9, 2015 | Completed final sign-off Jul 2016 | 2312 32nd Av | add one bedroom, entertainment & 2 bathroom on 1/f, turn (e) storage into office & mud room on 1/f.Details
add one bedroom, entertainment & 2 bathroom on 1/f, turn (e) storage into office & mud room on 1/f. | $40,000 |
| Jun 20, 2014 | Completed final sign-off Jan 2015 | 2362 38th Av | construct one bedroom, den, storage, & two bathrooms on ground floor. infill at rear extg storage on ground floor. remove extg door on 2nd floor.Details
construct one bedroom, den, storage, & two bathrooms on ground floor. infill at rear extg storage on ground floor. remove extg door on 2nd floor. | $45,000 |
| Nov 26, 2012 | Completed final sign-off Mar 2013 | 1723 27th Av | kitchen and bathroom remodel; kitchen lighting min 50% total wattage high efficacy, bath lighting, high efficacy unless controlled by occupancy sensorDetails
kitchen and bathroom remodel; kitchen lighting min 50% total wattage high efficacy, bath lighting, high efficacy unless controlled by occupancy sensor | $9,000 |
| May 17, 2012 | Completed final sign-off Jun 2014 | 264 Ewing Tr | interior remodel: adding master bedroom at ground floor, replace extg furnace and water heater at same location and remodel bathroom and kitchen at 2nd floor as per plan.Details
interior remodel: adding master bedroom at ground floor, replace extg furnace and water heater at same location and remodel bathroom and kitchen at 2nd floor as per plan. | $38,000 |
| Feb 6, 2009 | Completed final sign-off Mar 2009 | 1871 Green St | remove kitchen and one full bathroom. replace cabinets sink. floor. bath tubDetails
remove kitchen and one full bathroom. replace cabinets sink. floor. bath tub | $12,000 |
| May 5, 2008 | Completed final sign-off May 2009 | 1482 46th Av | ground floor remodeling: add playroom, half bath & storage roomDetails
ground floor remodeling: add playroom, half bath & storage room | $33,000 |
| Mar 17, 2008 | Expired or cancelled expired Dec 2008 | 1871 Green St | replace bath, fixtures and finishes, using existing plumbing, within existing space (e) light fixtures to remain. no structural work.Details
replace bath, fixtures and finishes, using existing plumbing, within existing space (e) light fixtures to remain. no structural work. | $1,000 |