Permit GraphShortlistSan Francisco building permits since 2000

Duggan Development

Contractor license
461502
State license record
Based in
Daly City
On San Francisco permits
Apr 2002 to Mar 2019
Last 24 months
0 permits filed

9 permits since 2000: 7 completed, 1 never finaled, 1 expired or cancelled.

Of the 1 never-finaled permit, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Kitchen remodel permits

AllRoof deck 1Kitchen remodel 3Bathroom remodel 3

3 kitchen remodel permits: 3 completed. Typically 5 days from filing to permit and 233 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Mar 29, 2019Completed
final sign-off Feb 2020
1417 Cole Stkitchen remodel, bathroom remodel, install new windows (not visible from street level) intall new hardwood floors, interior decoration, upgrade electrical wiring upgrade plumbing. structural (remove load non bearing wall)
Details
Permit
201903296680
Status
complete
Filed
Mar 29, 2019
Permit issued
Apr 3, 2019
Final sign-off
Feb 5, 2020
Declared cost
$100,000
Address
1417 Cole St

kitchen remodel, bathroom remodel, install new windows (not visible from street level) intall new hardwood floors, interior decoration, upgrade electrical wiring upgrade plumbing. structural (remove load non bearing wall)

Open the permit page

$100,000
Aug 31, 2018Completed
final sign-off Nov 2018
1246 23rd Avrevision to pa 2018-0323-4429 - add beam & post assembly to replace wall between kitchen & dining @ 2nd floor
Details
Permit
201808318942
Status
complete
Filed
Aug 31, 2018
Permit issued
Sep 19, 2018
Final sign-off
Nov 27, 2018
Declared cost
$60,000
Address
1246 23rd Av

revision to pa 2018-0323-4429 - add beam & post assembly to replace wall between kitchen & dining @ 2nd floor

Open the permit page

$60,000
Mar 23, 2018Completed
final sign-off Nov 2018
1246 23rd Avremodel (e) kitchen at 2nd floor & two bathrooms at 3rd floor, electrical upgrade, new paint, refinish hardwood floor. all fixtures will be located at existing location. no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)3 & 150.0(k)5.
Details
Permit
201803234429
Status
complete
Filed
Mar 23, 2018
Permit issued
Mar 27, 2018
Final sign-off
Nov 15, 2018
Declared cost
$40,000
Address
1246 23rd Av

remodel (e) kitchen at 2nd floor & two bathrooms at 3rd floor, electrical upgrade, new paint, refinish hardwood floor. all fixtures will be located at existing location. no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)3 & 150.0(k)5.

Open the permit page

$40,000