Duggan Development
- Based in
- Daly City
- On San Francisco permits
- Apr 2002 to Mar 2019
- Last 24 months
- 0 permits filed
9 permits since 2000: 7 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 5 days from filing to permit and 308 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 29, 2019 | Completed final sign-off Feb 2020 | 1417 Cole St | kitchen remodel, bathroom remodel, install new windows (not visible from street level) intall new hardwood floors, interior decoration, upgrade electrical wiring upgrade plumbing. structural (remove load non bearing wall)Details
kitchen remodel, bathroom remodel, install new windows (not visible from street level) intall new hardwood floors, interior decoration, upgrade electrical wiring upgrade plumbing. structural (remove load non bearing wall) | $100,000 |
| Mar 23, 2018 | Completed final sign-off Nov 2018 | 1246 23rd Av | remodel (e) kitchen at 2nd floor & two bathrooms at 3rd floor, electrical upgrade, new paint, refinish hardwood floor. all fixtures will be located at existing location. no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)3 & 150.0(k)5.Details
remodel (e) kitchen at 2nd floor & two bathrooms at 3rd floor, electrical upgrade, new paint, refinish hardwood floor. all fixtures will be located at existing location. no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)3 & 150.0(k)5. | $40,000 |
| Nov 23, 2015 | Completed final sign-off May 2019 | 153 Clipper St | remodel existing residence, in fill portion of existing lightwell, third floor addition with roof deck. 1 new bedroom, 1 new bathroom.Details
remodel existing residence, in fill portion of existing lightwell, third floor addition with roof deck. 1 new bedroom, 1 new bathroom. | $75,000 |