Duffin Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2001 to Sep 2024
- Last 24 months
- 0 permits filed
98 permits since 2000: 72 completed, 17 never finaled, 9 expired or cancelled.
Of the 17 never-finaled permits, 2 are 3 to 5 years old, 10 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 5 completed, 3 never finaled. Typically 6 days from filing to permit and 253 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 14, 2021 | Never finaled issued Aug 2022, no final | 639 34th Av | 3rd story addition w/ roof deck. remodel entire (e) 2nd-story home. kitchen, baths, living spaces, stairs, hvac, electrical, plumbing and facade improvements.Details
3rd story addition w/ roof deck. remodel entire (e) 2nd-story home. kitchen, baths, living spaces, stairs, hvac, electrical, plumbing and facade improvements. | $500,000 |
| Sep 3, 2021 | Never finaled issued Sep 2021, no final | 88 Entrada Ct | demo of interior wall b/w kitchen and family room. add new stairs b/w kitchen and family room. create trash enclosure at extg garage doors. new concrete footings for opening b/w kitchen and family and trash enclosure.Details
demo of interior wall b/w kitchen and family room. add new stairs b/w kitchen and family room. create trash enclosure at extg garage doors. new concrete footings for opening b/w kitchen and family and trash enclosure. | $50,000 |
| Mar 3, 2021 | Completed final sign-off Jan 2022 | 887 28th Av | 1/f: interior non-compliance stair replacement in kind. 2/f: raise floor partially under the (e) vanity countertop at the bathroom to improve head clearance for (e) non-compliance interior stairway. install new vanities, countertop and cabinets at bathroom. relocate outlets at bathroom.Details
1/f: interior non-compliance stair replacement in kind. 2/f: raise floor partially under the (e) vanity countertop at the bathroom to improve head clearance for (e) non-compliance interior stairway. install new vanities, countertop and cabinets at bathroom. relocate outlets at bathroom. | $20,000 |
| Jan 16, 2018 | Completed final sign-off Sep 2022 | 65 Almaden Ct | replace internal stairs, install 5 lew skylights, add 2 bedrooms, replace 1/2 bath with full bath at 1st fl enclose atrium, add 1 / 1/2 bath, remodel kitchen and bathDetails
replace internal stairs, install 5 lew skylights, add 2 bedrooms, replace 1/2 bath with full bath at 1st fl enclose atrium, add 1 / 1/2 bath, remodel kitchen and bath | $270,000 |
| Oct 6, 2017 | Completed final sign-off May 2018 | 851 42nd Av | gr fl convert family rm to bedroom, new bedroom at front, move stairs, relocat bathroo, laundry, utility. convert part of kitchen to master bedroom, relocate new stairs to gr fl,kitchen remodelDetails
gr fl convert family rm to bedroom, new bedroom at front, move stairs, relocat bathroo, laundry, utility. convert part of kitchen to master bedroom, relocate new stairs to gr fl,kitchen remodel | $220,000 |
| Sep 11, 2017 | Never finaled issued Sep 2017, no final | 4430 24th St | replace 3 front vinyl windows w/ alum-clad wood dh; inkind replace sectional garage door; inkind repair front stairs; no other workDetails
replace 3 front vinyl windows w/ alum-clad wood dh; inkind replace sectional garage door; inkind repair front stairs; no other work | $65,000 |
| Mar 5, 2015 | Completed final sign-off Aug 2017 | 848 42nd Av | remodel bedrooms at 2nd floor. convert storage into bedroom, bathroom and study at 1st floor. reverse stair at lightwell.Details
remodel bedrooms at 2nd floor. convert storage into bedroom, bathroom and study at 1st floor. reverse stair at lightwell. | $50,000 |
| May 28, 2013 | Completed final sign-off May 2014 | 1509 Clement St | 1)demo rear stairs. 2)demo portion of ground floor rear wall. 3)add new rear stair to 2nd floor. 4)add 42" parapet at deck. 5) mech and electrical on seperate permit.Details
1)demo rear stairs. 2)demo portion of ground floor rear wall. 3)add new rear stair to 2nd floor. 4)add 42" parapet at deck. 5) mech and electrical on seperate permit. | $25,000 |