Back to bathroom remodel contractors
Duffin Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2001 to Sep 2024
- Last 24 months
- 0 permits filed
98 permits since 2000: 72 completed, 17 never finaled, 9 expired or cancelled.
Of the 17 never-finaled permits, 2 are 3 to 5 years old, 10 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 14 completed, 4 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 222 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 14, 2021 | Never finaled issued Aug 2022, no final | 639 34th Av | 3rd story addition w/ roof deck. remodel entire (e) 2nd-story home. kitchen, baths, living spaces, stairs, hvac, electrical, plumbing and facade improvements.Details
3rd story addition w/ roof deck. remodel entire (e) 2nd-story home. kitchen, baths, living spaces, stairs, hvac, electrical, plumbing and facade improvements. | $500,000 |
| Mar 3, 2021 | Completed final sign-off Jan 2022 | 887 28th Av | 1/f: interior non-compliance stair replacement in kind. 2/f: raise floor partially under the (e) vanity countertop at the bathroom to improve head clearance for (e) non-compliance interior stairway. install new vanities, countertop and cabinets at bathroom. relocate outlets at bathroom.Details
1/f: interior non-compliance stair replacement in kind. 2/f: raise floor partially under the (e) vanity countertop at the bathroom to improve head clearance for (e) non-compliance interior stairway. install new vanities, countertop and cabinets at bathroom. relocate outlets at bathroom. | $20,000 |
| Jan 30, 2020 | Completed final sign-off Mar 2020 | 60 Arguello Bl | 3rd floor master bathroom: install new sinks and counter in kind. replace shower and floor tile in kind. replace shower and floor tile in kind. install new exhaust for same location. reuse shower valve same location.Details
3rd floor master bathroom: install new sinks and counter in kind. replace shower and floor tile in kind. replace shower and floor tile in kind. install new exhaust for same location. reuse shower valve same location. | $30,000 |
| May 22, 2019 | Never finaled issued May 2019, no final | 6725 California St | lower unit -remodel kitchen & full bath. new opening in (e) shear wall. new front door. new patio doors. upper unit -remodel full bath. new skylight.Details
lower unit -remodel kitchen & full bath. new opening in (e) shear wall. new front door. new patio doors. upper unit -remodel full bath. new skylight. | $65,000 |
| Feb 6, 2019 | Completed final sign-off Feb 2019 | 2645 Baker St | install new wood vanity in master bathroom at 3rd floor to replace existing.Details
install new wood vanity in master bathroom at 3rd floor to replace existing. | $5,000 |
| Feb 4, 2019 | Completed final sign-off Aug 2019 | 3595 21st St | remodel bath at top floor unit. relocate washer dryer and water heater. (n) skylightDetails
remodel bath at top floor unit. relocate washer dryer and water heater. (n) skylight | $15,000 |
| Sep 13, 2018 | Completed final sign-off Nov 2018 | 2206 Pine St | install new tile and plumbing fixtures in (2) bathrooms; guest bathroom on first floor and guest bathroom on second floor. install new toilets, etc.Details
install new tile and plumbing fixtures in (2) bathrooms; guest bathroom on first floor and guest bathroom on second floor. install new toilets, etc. | $50,000 |
| Jul 18, 2018 | Completed final sign-off Nov 2018 | 1 Daniel Burnham Ct | remodel existing bath. no new walls. update current fixtures and finishes in same locationDetails
remodel existing bath. no new walls. update current fixtures and finishes in same location | $25,000 |
| Jul 18, 2018 | Completed final sign-off Sep 2019 | 876 43rd Av | remodel existing 3rd floor master bath. update knob and tube wiring to current code. remodel (e) 2nd lfoor 1/2 bath and pantry. install new fixtures and update plumbing and electricalDetails
remodel existing 3rd floor master bath. update knob and tube wiring to current code. remodel (e) 2nd lfoor 1/2 bath and pantry. install new fixtures and update plumbing and electrical | $25,000 |
| Jan 16, 2018 | Completed final sign-off Sep 2022 | 65 Almaden Ct | replace internal stairs, install 5 lew skylights, add 2 bedrooms, replace 1/2 bath with full bath at 1st fl enclose atrium, add 1 / 1/2 bath, remodel kitchen and bathDetails
replace internal stairs, install 5 lew skylights, add 2 bedrooms, replace 1/2 bath with full bath at 1st fl enclose atrium, add 1 / 1/2 bath, remodel kitchen and bath | $270,000 |
| Oct 4, 2017 | Never finaled issued Oct 2017, no final | 1150 Lombard St | unit #27: remodel master bath & guest bath. remodel kitchen, update plumbing & electrical as required. alll work is cosmetic, no structural.Details
unit #27: remodel master bath & guest bath. remodel kitchen, update plumbing & electrical as required. alll work is cosmetic, no structural. | $161,000 |
| Aug 8, 2017 | Completed final sign-off May 2019 | 584 Duncan St | remodel extg kitchen in units 584 and 586. replace in kind fixtures for 586 bathroom. replace rear windows. relocate gas fireplace, new skylights. replace in kind front facade windows.Details
remodel extg kitchen in units 584 and 586. replace in kind fixtures for 586 bathroom. replace rear windows. relocate gas fireplace, new skylights. replace in kind front facade windows. | $80,000 |
| Dec 19, 2016 | Expired or cancelled expired Jul 2020 | 1816 Lake St | remodel 2 bathrooms on 2nd floor. no wall will be removed. update electrical and plumbing as required. no alteration of wall, window and door.Details
remodel 2 bathrooms on 2nd floor. no wall will be removed. update electrical and plumbing as required. no alteration of wall, window and door. | $85,000 |
| May 2, 2016 | Completed final sign-off Oct 2017 | 1501 Beach St | replace kitchen cabinets/w similar in same location, replace plumbing fextures & tile finishes in master bath & hall bath, all fixtures in (e) location update electrical as needed.Details
replace kitchen cabinets/w similar in same location, replace plumbing fextures & tile finishes in master bath & hall bath, all fixtures in (e) location update electrical as needed. | $75,000 |
| Jan 21, 2016 | Expired or cancelled expired Feb 2022 | 48 Clarendon Av | remodel in kind, 1 kitchen, 3 bathrooms and 2 powder rooms. no new walls, no structural work performed. kitchen will follow california energy codes.Details
remodel in kind, 1 kitchen, 3 bathrooms and 2 powder rooms. no new walls, no structural work performed. kitchen will follow california energy codes. | $130,000 |
| Mar 5, 2015 | Completed final sign-off Aug 2017 | 848 42nd Av | remodel bedrooms at 2nd floor. convert storage into bedroom, bathroom and study at 1st floor. reverse stair at lightwell.Details
remodel bedrooms at 2nd floor. convert storage into bedroom, bathroom and study at 1st floor. reverse stair at lightwell. | $50,000 |
| Jan 26, 2015 | Completed final sign-off Feb 2015 | 813 47th Av | unit #3 - replace tile in 1 bathroom shower/floor on top flr. behind kitchen install new shower pan/replace sink + faucet. replace cabnetry + counter top. install new light fixture. no walls to be removed.Details
unit #3 - replace tile in 1 bathroom shower/floor on top flr. behind kitchen install new shower pan/replace sink + faucet. replace cabnetry + counter top. install new light fixture. no walls to be removed. | $20,000 |
| Mar 12, 2014 | Never finaled issued Mar 2014, no final | 72 06th Av | repair/replace water damaged flooring. drywall & cabinetry on lower level of lower unit to include game room/office bathroom. (repair in kind).Details
repair/replace water damaged flooring. drywall & cabinetry on lower level of lower unit to include game room/office bathroom. (repair in kind). | $25,000 |
| Feb 3, 2014 | Completed final sign-off Nov 2018 | 18 Moore Pl | new 3rd story addition with roof deck add two bedrooms and one bathDetails
new 3rd story addition with roof deck add two bedrooms and one bath | $250,000 |
| Nov 29, 2010 | Completed final sign-off Mar 2011 | 7919 Geary Bl | remove & replace finishes to studs at second floor bath, high efficacy lighting or occupancy sensor control.Details
remove & replace finishes to studs at second floor bath, high efficacy lighting or occupancy sensor control. | $20,000 |