Drycrew Restoration Contractor
- Based in
- Oakland
- On San Francisco permits
- Sep 2023 to Oct 2026
- Last 24 months
- 10 permits filed
16 permits since 2000: 8 completed, 7 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Stairs permits
1 stairs permit: 1 in progress. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 14, 2026 | In progress issued Oct 2026 | 600 07th St | replace type x gympsum board on hallway 1-6th floors due to water damage at 2 ft high (flood cut) total drywall replacement on hallways 1,480 sf. / replace type x gympsum board on emergency stairs from the 7th to 1st floor. total drywall been replace on stairs due to water damage is....Details
replace type x gympsum board on hallway 1-6th floors due to water damage at 2 ft high (flood cut) total drywall replacement on hallways 1,480 sf. / replace type x gympsum board on emergency stairs from the 7th to 1st floor. total drywall been replace on stairs due to water damage is.... | $38,000 |