Permit GraphShortlistSan Francisco building permits since 2000

Dpd Construction & Design

Contractor license
537717
State license record
Based in
San Francisco
On San Francisco permits
Dec 2000 to Sep 2006
Last 24 months
0 permits filed

16 permits since 2000: 15 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Kitchen remodel permits

AllDeck 3Stairs 1Kitchen remodel 7Bathroom remodel 5

7 kitchen remodel permits: 6 completed, 1 never finaled. Typically 0 days from filing to permit and 98 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Aug 18, 2006Completed
final sign-off Oct 2006
149 Chenery Strenovation of kitchen: remove closet from bedroom, remove built-in cabinet from dining room, remove sm window in kitchen. new cabinets, floor, window, walls, insulation (f13 walls), update wiring, update plumbing, new lighting.
Details
Permit
200608189831
Status
complete
Filed
Aug 18, 2006
Permit issued
Aug 18, 2006
Final sign-off
Oct 19, 2006
Declared cost
$38,000
Address
149 Chenery St

renovation of kitchen: remove closet from bedroom, remove built-in cabinet from dining room, remove sm window in kitchen. new cabinets, floor, window, walls, insulation (f13 walls), update wiring, update plumbing, new lighting.

Open the permit page

$38,000
Jun 5, 2006Completed
final sign-off Aug 2006
2370 29th Avrenovation of kitchen: remove 2 doors, 1 wall. new cabinets, floor, appliances, coutnertop, electrical update. non structural.
Details
Permit
200606053133
Status
complete
Filed
Jun 5, 2006
Permit issued
Jun 5, 2006
Final sign-off
Aug 22, 2006
Declared cost
$42,000
Address
2370 29th Av

renovation of kitchen: remove 2 doors, 1 wall. new cabinets, floor, appliances, coutnertop, electrical update. non structural.

Open the permit page

$42,000
Sep 29, 2005Completed
final sign-off Apr 2006
1518 17th Avremodel of kitchen: new floor, cabinets, countertop, appliances, enterior with sound proofing, remove part of wall between kitchen & dining room, new window.
Details
Permit
200509294255
Status
complete
Filed
Sep 29, 2005
Permit issued
Sep 29, 2005
Final sign-off
Apr 26, 2006
Declared cost
$34,000
Address
1518 17th Av

remodel of kitchen: new floor, cabinets, countertop, appliances, enterior with sound proofing, remove part of wall between kitchen & dining room, new window.

Open the permit page

$34,000
Aug 5, 2005Completed
final sign-off Nov 2005
842 Teresita Blremodel kitchen new-cabinets, counter tops, sink, faucet, window floor. no structural changes.
Details
Permit
200508059590
Status
complete
Filed
Aug 5, 2005
Permit issued
Aug 5, 2005
Final sign-off
Nov 28, 2005
Declared cost
$32,000
Address
842 Teresita Bl

remodel kitchen new-cabinets, counter tops, sink, faucet, window floor. no structural changes.

Open the permit page

$32,000
Aug 5, 2005Never finaled
issued Aug 2005, no final
175 Red Rock Wyremodel kitchen-new cabinets, sink, faucet, countertops. no structural changes, no change in design.
Details
Permit
200508059586
Status
issued
Filed
Aug 5, 2005
Permit issued
Aug 5, 2005
Declared cost
$11,000
Address
175 Red Rock Wy

remodel kitchen-new cabinets, sink, faucet, countertops. no structural changes, no change in design.

Open the permit page

$11,000
Jun 4, 2004Completed
final sign-off Aug 2004
207 Christopher Drdemo of existing kitchen and part wall to dining rm construct new kitchen with new wiring cabinets
Details
Permit
200406045545
Status
complete
Filed
Jun 4, 2004
Permit issued
Jun 4, 2004
Final sign-off
Aug 25, 2004
Declared cost
$28,000
Address
207 Christopher Dr

demo of existing kitchen and part wall to dining rm construct new kitchen with new wiring cabinets

Open the permit page

$28,000
Jan 21, 2004Completed
final sign-off Jul 2004
187 Melrose Avrenovation of kitchen/new cabinets/countertop/flooring/lghtg/sink/applc
Details
Permit
200401214438
Status
complete
Filed
Jan 21, 2004
Permit issued
Jan 21, 2004
Final sign-off
Jul 19, 2004
Declared cost
$48,500
Address
187 Melrose Av

renovation of kitchen/new cabinets/countertop/flooring/lghtg/sink/applc

Open the permit page

$48,500