Back to bathroom remodel contractors
Dpd Construction & Design
- Based in
- San Francisco
- On San Francisco permits
- Dec 2000 to Sep 2006
- Last 24 months
- 0 permits filed
16 permits since 2000: 15 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 145 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 22, 2006 | Completed final sign-off Oct 2006 | 842 Teresita Bl | patrial renovation of bathroom - new tub, shower stall, medicine cabinet, tile & new florescent lights.Details
patrial renovation of bathroom - new tub, shower stall, medicine cabinet, tile & new florescent lights. | $18,000 |
| Mar 10, 2005 | Completed final sign-off May 2005 | 207 Christopher Dr | renovate 2 bathrooms, bath & new shower stall, new tile, new low flow toilet, new vanity, fixtures.Details
renovate 2 bathrooms, bath & new shower stall, new tile, new low flow toilet, new vanity, fixtures. | $34,000 |
| Sep 10, 2003 | Completed final sign-off May 2004 | 2539 Clay St | #5- demo (e) bath & 2 closets. construct 2 bath, 1 full, 1 1-3/4. all new fixtures & marble tileDetails
#5- demo (e) bath & 2 closets. construct 2 bath, 1 full, 1 1-3/4. all new fixtures & marble tile | $35,000 |
| Aug 1, 2002 | Completed final sign-off Jul 2003 | 1364 Vermont St | retifit rear north roof with shed dormer. construct new bath 4'-7"x 13'-8" in area. remove existingDetails
retifit rear north roof with shed dormer. construct new bath 4'-7"x 13'-8" in area. remove existing | $22,500 |
| Mar 6, 2001 | Completed final sign-off Jul 2002 | 187 Melrose Av | retro-set of basement area, conversion of storage area to bedrm, new bath, new closet/storage, new fDetails
retro-set of basement area, conversion of storage area to bedrm, new bath, new closet/storage, new f | $32,000 |