Back to kitchen remodel contractors
Dlr Custom Builders
- Based in
- Oakland
- On San Francisco permits
- Jul 2005 to Oct 2023
- Last 24 months
- 0 permits filed
15 permits since 2000: 7 completed, 3 never finaled, 5 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 expired or cancelled. Typically 5 days from filing to permit and 87 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 19, 2014 | Expired or cancelled expired Nov 2021 | 212 Dorado Tr | remodel units 212 and 214: bathroom: vanity, tile, tub, plumb fixutres, lighting, kitchen cabinet replacement, plumb, elec range, hood, lighting, wall removal. bedroom wall removal, laundry rm removal, replace. add powder m, vainity , toiletDetails
remodel units 212 and 214: bathroom: vanity, tile, tub, plumb fixutres, lighting, kitchen cabinet replacement, plumb, elec range, hood, lighting, wall removal. bedroom wall removal, laundry rm removal, replace. add powder m, vainity , toilet | $150,000 |
| Jul 10, 2008 | Completed final sign-off Oct 2008 | 871 Vallejo St | remodel (e) kitchen, update (e) bath & w.c., repalce water heater w/on-demand gas fired water heater, install new electrical conduit from front bldg to back bldg. rewire remodeled kitchen & add electrical outlets in bedrooms. install elec sub-panel.Details
remodel (e) kitchen, update (e) bath & w.c., repalce water heater w/on-demand gas fired water heater, install new electrical conduit from front bldg to back bldg. rewire remodeled kitchen & add electrical outlets in bedrooms. install elec sub-panel. | $25,000 |
| Jul 27, 2005 | Completed final sign-off Nov 2005 | 873 Vallejo St | remodel (e)kitchen.no exterior changes,no structural changes,new 100 amp sub-panel,7 new circuitsDetails
remodel (e)kitchen.no exterior changes,no structural changes,new 100 amp sub-panel,7 new circuits | $20,000 |