Back to bathroom remodel contractors
Dlr Custom Builders
- Based in
- Oakland
- On San Francisco permits
- Jul 2005 to Oct 2023
- Last 24 months
- 0 permits filed
15 permits since 2000: 7 completed, 3 never finaled, 5 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 3 completed, 1 never finaled, 2 expired or cancelled. Typically 7 days from filing to permit and 249 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 31, 2023 | Completed final sign-off Apr 2025 | 1401 14th Av | remodel of 2 bathrooms, replacment of (e) skylight inkind, fire proofing garage 5/8" dryuwall to create fire separation between garage & living space, install 2 self closing doors, remodel (e) laundry room, eliminate (e) basement bathroom and convert to storage area, perform elec, plumb and hvac asDetails
remodel of 2 bathrooms, replacment of (e) skylight inkind, fire proofing garage 5/8" dryuwall to create fire separation between garage & living space, install 2 self closing doors, remodel (e) laundry room, eliminate (e) basement bathroom and convert to storage area, perform elec, plumb and hvac as | $95,000 |
| Aug 28, 2015 | Never finaled issued Aug 2015, no final | 1286 04th Av | remodel (e)bathroom & utility rm, remove plaster finish on walls & ceilings of 3 bedrooms & replace with ddry wall 5/8" type"x",approx 500 sq.ft. all work at 2nd flr.Details
remodel (e)bathroom & utility rm, remove plaster finish on walls & ceilings of 3 bedrooms & replace with ddry wall 5/8" type"x",approx 500 sq.ft. all work at 2nd flr. | $17,000 |
| Aug 25, 2015 | Expired or cancelled expired Apr 2019 | 1284 04th Av | new master bath, remodel extg bath, 3 new closets, remodel laundry area, modify extg closet, modify extg partition walls, modify elec, plmg, & heating. add electrical outlets. install electrical sub-panelDetails
new master bath, remodel extg bath, 3 new closets, remodel laundry area, modify extg closet, modify extg partition walls, modify elec, plmg, & heating. add electrical outlets. install electrical sub-panel | $35,000 |
| Nov 19, 2014 | Expired or cancelled expired Nov 2021 | 212 Dorado Tr | remodel units 212 and 214: bathroom: vanity, tile, tub, plumb fixutres, lighting, kitchen cabinet replacement, plumb, elec range, hood, lighting, wall removal. bedroom wall removal, laundry rm removal, replace. add powder m, vainity , toiletDetails
remodel units 212 and 214: bathroom: vanity, tile, tub, plumb fixutres, lighting, kitchen cabinet replacement, plumb, elec range, hood, lighting, wall removal. bedroom wall removal, laundry rm removal, replace. add powder m, vainity , toilet | $150,000 |
| Dec 20, 2013 | Completed final sign-off Sep 2014 | 877 Vallejo St | remodel (e) hallway bathroom. to include building electrical, plumbing & mechanical installations - mep under separate permit.Details
remodel (e) hallway bathroom. to include building electrical, plumbing & mechanical installations - mep under separate permit. | $15,000 |
| Jul 10, 2008 | Completed final sign-off Oct 2008 | 871 Vallejo St | remodel (e) kitchen, update (e) bath & w.c., repalce water heater w/on-demand gas fired water heater, install new electrical conduit from front bldg to back bldg. rewire remodeled kitchen & add electrical outlets in bedrooms. install elec sub-panel.Details
remodel (e) kitchen, update (e) bath & w.c., repalce water heater w/on-demand gas fired water heater, install new electrical conduit from front bldg to back bldg. rewire remodeled kitchen & add electrical outlets in bedrooms. install elec sub-panel. | $25,000 |