Back to bathroom remodel contractors
Dliu Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2014 to Jul 2026
- Last 24 months
- 12 permits filed
121 permits since 2000: 91 completed, 4 in progress, 18 never finaled, 8 expired or cancelled.
Of the 18 never-finaled permits, 4 are 3 to 5 years old, 14 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
51 bathroom remodel permits: 43 completed, 1 in progress, 5 never finaled, 2 expired or cancelled. Typically 13 days from filing to permit and 343 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 5, 2025 | In progress issued Jun 2025 | 3095 24th Av | remodel all 5 full bathrooms at (e) location. chagne flooring and paint whole house.Details
remodel all 5 full bathrooms at (e) location. chagne flooring and paint whole house. | $60,000 |
| May 13, 2024 | Completed final sign-off Feb 2025 | 254 Beverly St | 2nd fl - remodel of kitchen, bathroom & bedroom; remodel of (e) bathroom interior only with no change to bathroom envelope; relocate interior stairway and add new skylights per plan. no change to (e) building envelope. structural strengthening where needed for interior remodeling per plansDetails
2nd fl - remodel of kitchen, bathroom & bedroom; remodel of (e) bathroom interior only with no change to bathroom envelope; relocate interior stairway and add new skylights per plan. no change to (e) building envelope. structural strengthening where needed for interior remodeling per plans | $150,000 |
| Sep 21, 2023 | Completed final sign-off Jan 2024 | 135 Corona St | minor residential interior remodel single family residence to remodel e bathrooms and e kithen on 2nd fl for non structural partition walls, per plan. remodel e laundry area to laundry new bath on gr fl per plans. no change to existing building envelopeDetails
minor residential interior remodel single family residence to remodel e bathrooms and e kithen on 2nd fl for non structural partition walls, per plan. remodel e laundry area to laundry new bath on gr fl per plans. no change to existing building envelope | $78,000 |
| Aug 16, 2023 | Expired or cancelled expired Dec 2025 | 1100 Holloway Av | adding g/f as adu per state govt code 65852.2a-d at (e) ground floor habitable space to include 3 bedroom, 3 baths with sep entrance and full kitchen with added bedroom egress windows to (e) for new adu per plans. convert (e) work under pa202306139938 & 202305127691.Details
adding g/f as adu per state govt code 65852.2a-d at (e) ground floor habitable space to include 3 bedroom, 3 baths with sep entrance and full kitchen with added bedroom egress windows to (e) for new adu per plans. convert (e) work under pa202306139938 & 202305127691. | $15,000 |
| Jun 13, 2023 | Completed final sign-off Oct 2025 | 1100 Holloway Av | revision to 202305127691. minor revision to 2nd fl and gr fl layout from prvious permit. no exterior change. proposed from prev permit. voluntary structural and seismic strengthening to accompany prev 202305127691 permit gr fl. add 2 full bath on 1st floor & 2nd floor.Details
revision to 202305127691. minor revision to 2nd fl and gr fl layout from prvious permit. no exterior change. proposed from prev permit. voluntary structural and seismic strengthening to accompany prev 202305127691 permit gr fl. add 2 full bath on 1st floor & 2nd floor. | $80,000 |
| May 18, 2023 | Completed final sign-off Mar 2024 | 691 Madrid St | minor residential interior remodel of sfr, ground flr remodel for habitable space for total of 2 bedrm, 1 media & 1 bath. remodel of second flr, per plans to have total 2 beds, 2 bath, relocate int. stair, re-roof of extg roof where needed strucctural strengthening where needed per structural drawinDetails
minor residential interior remodel of sfr, ground flr remodel for habitable space for total of 2 bedrm, 1 media & 1 bath. remodel of second flr, per plans to have total 2 beds, 2 bath, relocate int. stair, re-roof of extg roof where needed strucctural strengthening where needed per structural drawin | $250,000 |
| May 12, 2023 | Completed final sign-off Nov 2025 | 1100 Holloway Av | comply to complaint 202306457: g/f - 1 new bedrooms, den, media room and 3 new bathrooms. no new openings proposed. amend to 202301311100Details
comply to complaint 202306457: g/f - 1 new bedrooms, den, media room and 3 new bathrooms. no new openings proposed. amend to 202301311100 | $150,000 |
| Jan 25, 2023 | Never finaled issued Jul 2023, no final | 370 Parnassus Av | 2nd revision to pa# 201412042987. dental office floor plan revised to allow larger waiting/reception, add staff bath, relocate janitor's closet, add x-ray area. garage lvl revised to add electrical rm w/ elec. mtrs & direct access for pg&e & change exist stair at rear for lvl access to gas metersDetails
2nd revision to pa# 201412042987. dental office floor plan revised to allow larger waiting/reception, add staff bath, relocate janitor's closet, add x-ray area. garage lvl revised to add electrical rm w/ elec. mtrs & direct access for pg&e & change exist stair at rear for lvl access to gas meters | |
| Dec 1, 2022 | Completed final sign-off May 2024 | 2470 23rd Av | 1st fl remodel of habitable space for 2 bed, 1 media room, 2 bath. remodel of 2nd fl per plans. add new skylights. infill (e) courtyard & (e) lightwell against blank neighbor wall at property line. new rear deck w/ stairs at rear. eg 02 for eero at the rear of building, review no inspection for fireDetails
1st fl remodel of habitable space for 2 bed, 1 media room, 2 bath. remodel of 2nd fl per plans. add new skylights. infill (e) courtyard & (e) lightwell against blank neighbor wall at property line. new rear deck w/ stairs at rear. eg 02 for eero at the rear of building, review no inspection for fire | $225,000 |
| Sep 16, 2022 | Completed final sign-off Jan 2023 | 35 Reposa Wy | remodel bathron on 2nd fl; remodel (e) non-bearing kitchen wall on 2nd fl; add media room and bathroom on ground floor; no excavation proposed relocate interior stairs and new windows and doors at rear of building; enclose 2nd fl lightwell; 3 skylights,Details
remodel bathron on 2nd fl; remodel (e) non-bearing kitchen wall on 2nd fl; add media room and bathroom on ground floor; no excavation proposed relocate interior stairs and new windows and doors at rear of building; enclose 2nd fl lightwell; 3 skylights, | $85,000 |
| Aug 1, 2022 | Completed final sign-off Oct 2024 | 421 Walnut St | rev to pa201708023959: revise 1/f bathroom location, additional skylihgt, change to framing based on revision & existing field conditions.Details
rev to pa201708023959: revise 1/f bathroom location, additional skylihgt, change to framing based on revision & existing field conditions. | $2,800 |
| Jul 26, 2022 | Completed final sign-off Feb 2023 | 2552 24th Av | interior remodel of 2nd fl kitchen and bath. add habitable space to e garage /storage to 1 bedroom, 2 baths, laundry and media room. no change to e exterior building envelope. relocate e interior stairway to compliant stairs, per plans. rear windows per plans,Details
interior remodel of 2nd fl kitchen and bath. add habitable space to e garage /storage to 1 bedroom, 2 baths, laundry and media room. no change to e exterior building envelope. relocate e interior stairway to compliant stairs, per plans. rear windows per plans, | $150,000 |
| Jul 5, 2022 | Completed final sign-off Oct 2022 | 549 Monterey Bl | remodel extg bathroom, not move any wall at 1st floor.Details
remodel extg bathroom, not move any wall at 1st floor. | $10,000 |
| Jun 7, 2022 | Completed final sign-off Aug 2022 | 217 Juanita Wy | remodel bathrooms on (e) 3/f & 2/f. relocate non-bearing kitchen wall & kitchen remodel. convert (e) garage/storage to one bedroo, bathroom, mud room on g/f. no excavation proposed. relocate interior stair per plan.Details
remodel bathrooms on (e) 3/f & 2/f. relocate non-bearing kitchen wall & kitchen remodel. convert (e) garage/storage to one bedroo, bathroom, mud room on g/f. no excavation proposed. relocate interior stair per plan. | $150,000 |
| Apr 26, 2022 | Completed final sign-off Aug 2023 | 48 Sanchez St | interior remodel. demo interior wall between rear entry & kitchen. replace kitchen finishes, fixtures & caseworks. modify interior wall between 2 baths. replace old wall with new. no change in building foot print. add recessed lighting.Details
interior remodel. demo interior wall between rear entry & kitchen. replace kitchen finishes, fixtures & caseworks. modify interior wall between 2 baths. replace old wall with new. no change in building foot print. add recessed lighting. | $60,000 |
| Jan 26, 2022 | Completed final sign-off Jun 2023 | 1634 39th Av | 1st fl: add 2 bedrooms, a media room, 2 full baths, & remodel foyer area. 2nd fl: remodel bathroom, kitchen, add a full bath, add a rear deck.Details
1st fl: add 2 bedrooms, a media room, 2 full baths, & remodel foyer area. 2nd fl: remodel bathroom, kitchen, add a full bath, add a rear deck. | $110,000 |
| Dec 22, 2021 | Completed final sign-off Feb 2023 | 494 20th Av | rev pa201912300872. 1/f: add a hallway, add a tub to bathroom. relocate washer/dryer to 2/f. 2/f: revise kitchen and dining area plan; 3/f: revise bathroom and bedroom plans.Details
rev pa201912300872. 1/f: add a hallway, add a tub to bathroom. relocate washer/dryer to 2/f. 2/f: revise kitchen and dining area plan; 3/f: revise bathroom and bedroom plans. | $10,000 |
| Nov 17, 2021 | Completed final sign-off Mar 2022 | 549 Monterey Bl | kitchen & bath remodel on 3rd & 2nd floor. no change to existing exterior envelope. structural support @ kitchen remodel & add 3 skylights @ roof.Details
kitchen & bath remodel on 3rd & 2nd floor. no change to existing exterior envelope. structural support @ kitchen remodel & add 3 skylights @ roof. | $125,000 |
| Oct 5, 2021 | Completed final sign-off Aug 2022 | 2966 26th Av | remodel gr fl 2nd bath to full bath, add 1 full bath at gr fl, remodel 2nd fl bath to 2 full bathDetails
remodel gr fl 2nd bath to full bath, add 1 full bath at gr fl, remodel 2nd fl bath to 2 full bath | $25,000 |
| Feb 25, 2020 | Expired or cancelled expired Apr 2026 | 421 27th St | interior remodel of 1st & 2nd floors. adding 2 bedrooms & bathroom on ground flDetails
interior remodel of 1st & 2nd floors. adding 2 bedrooms & bathroom on ground fl | $25,000 |
| Nov 19, 2019 | Never finaled issued Sep 2020, no final | 831 Greenwich St | convert closet space to a full bathroom in fourth floor.Details
convert closet space to a full bathroom in fourth floor. | $12,000 |
| Sep 26, 2019 | Completed final sign-off Oct 2021 | 80 Forest View Dr | residential interior remodel of single family residence. ground floor remodel of garage space for total of 1 bed, 1 media room & 1 1/2 bath. remodel of 2nd floor and 3rd fl, per plansDetails
residential interior remodel of single family residence. ground floor remodel of garage space for total of 1 bed, 1 media room & 1 1/2 bath. remodel of 2nd floor and 3rd fl, per plans | $200,000 |
| Feb 13, 2019 | Completed final sign-off Feb 2020 | 938 Ingerson Av | comply w/ complaint 201853881,201842451 & 200874536; const 2 bed rm, 2 bath rm & family rm. at ground fl. remodel (e) kitchen, bath rm. add 3 bath rm. & replace sheet rock w/new at 2nd fl, const 2 bed rm, 2 bath rm, media rm at lower fl. & re-build (e) interior staircase grd flr. down to lower fl;Details
comply w/ complaint 201853881,201842451 & 200874536; const 2 bed rm, 2 bath rm & family rm. at ground fl. remodel (e) kitchen, bath rm. add 3 bath rm. & replace sheet rock w/new at 2nd fl, const 2 bed rm, 2 bath rm, media rm at lower fl. & re-build (e) interior staircase grd flr. down to lower fl; | $158,000 |
| Nov 27, 2018 | Never finaled issued Dec 2018, no final | 2070 Green St | revision t0 pa 201808167549. revise window sizes at rear. basement & 2nd flr - reconfigure bathroom layoutDetails
revision t0 pa 201808167549. revise window sizes at rear. basement & 2nd flr - reconfigure bathroom layout | $10,000 |
| Oct 19, 2018 | Completed final sign-off Mar 2022 | 651 24th Av | horizontal addition @ rear of 1st floor. new 2nd unit with 2 bedrooms & 2 baths. interior alterations to 1st floor & new roof @ 2nd floor. revision to pa# 2016/08/26/6116.Details
horizontal addition @ rear of 1st floor. new 2nd unit with 2 bedrooms & 2 baths. interior alterations to 1st floor & new roof @ 2nd floor. revision to pa# 2016/08/26/6116. | $44,156 |
| Aug 28, 2018 | Completed final sign-off Apr 2019 | 1223 Hollister Av | add new adu in 1st floor with 2 bedrooms, 2 full baths, a kitchen, a living room & dining room per ord# 95-17. in 2nd foolr: convert dining room to a bedroom with a full bath.Details
add new adu in 1st floor with 2 bedrooms, 2 full baths, a kitchen, a living room & dining room per ord# 95-17. in 2nd foolr: convert dining room to a bedroom with a full bath. | $58,000 |
| Aug 17, 2018 | Completed final sign-off Sep 2020 | 4038 Cesar Chavez St | in basement convert storage space into living space . on 1st and 2nd fl. remodel kitchen, bedrooms, bathrooms and remodel roof deck add front light well, front windows, add 3 skylights and replacing side and rear windows, not visible from public view.Details
in basement convert storage space into living space . on 1st and 2nd fl. remodel kitchen, bedrooms, bathrooms and remodel roof deck add front light well, front windows, add 3 skylights and replacing side and rear windows, not visible from public view. | $120,000 |
| Aug 16, 2018 | Completed final sign-off Aug 2020 | 2070 Green St | basement: add 3 bedrms, wine room, media, & int. stairs. 1/f: relocate kitchen, remodel bath, & add laundry. 2/f: remodel bath, add 1 bedrm, 1 bath, & 1 office. 3/f: remodel kitchen & bath. add office & pantry. new elevator to all flrs, infill east & west lightwell. n roof deck & balconies.Details
basement: add 3 bedrms, wine room, media, & int. stairs. 1/f: relocate kitchen, remodel bath, & add laundry. 2/f: remodel bath, add 1 bedrm, 1 bath, & 1 office. 3/f: remodel kitchen & bath. add office & pantry. new elevator to all flrs, infill east & west lightwell. n roof deck & balconies. | $200,000 |
| Aug 6, 2018 | Never finaled issued Aug 2018, no final | 234 Montana St | remodel (e) kitchen & bathroom on (e) 2nd fl. add one bathroom and skylights on (e) 2nd fl plan. rear window replacement at rear. all work limited to within interior of building.Details
remodel (e) kitchen & bathroom on (e) 2nd fl. add one bathroom and skylights on (e) 2nd fl plan. rear window replacement at rear. all work limited to within interior of building. | $80,000 |
| Aug 2, 2018 | Completed final sign-off Jul 2019 | 234 Montana St | remodel at ground floor of extg 2 story structure to accomdate additional habitable space. new 1 bedroom on ground and relocate bathroom for total of 2 bedroom and 1 bathroom. replace one rear window for bedroom.Details
remodel at ground floor of extg 2 story structure to accomdate additional habitable space. new 1 bedroom on ground and relocate bathroom for total of 2 bedroom and 1 bathroom. replace one rear window for bedroom. | $30,000 |
| Jun 27, 2018 | Completed final sign-off Oct 2019 | 123 09th Av | 1st fl: infill lightwell on south. reconfigure bath. 2nd & 3rd floor: modify south lightwell. enlarge bathroom and den.Details
1st fl: infill lightwell on south. reconfigure bath. 2nd & 3rd floor: modify south lightwell. enlarge bathroom and den. | $5,000 |
| May 24, 2018 | Completed final sign-off Feb 2020 | 431 Moscow St | add two bedrooms & one bathroom at (e) ground floor. remodel (e) kitchen & bathroom at the 2nd fl. demo (e) deck & build new deck.Details
add two bedrooms & one bathroom at (e) ground floor. remodel (e) kitchen & bathroom at the 2nd fl. demo (e) deck & build new deck. | $95,000 |
| May 9, 2018 | Completed final sign-off Apr 2019 | 11 Winter Pl | for total (4) units each: (4) kitchen remodel and (4) bathroom remodel. no change of (e) floor planDetails
for total (4) units each: (4) kitchen remodel and (4) bathroom remodel. no change of (e) floor plan | $4,000 |
| Apr 24, 2018 | Completed final sign-off Jul 2018 | 1174 Alabama St | new bathroom and walkthrough closet maher naDetails
new bathroom and walkthrough closet maher na | $20,000 |
| Apr 17, 2018 | Completed final sign-off May 2019 | 842 Lyon St | 1st fl:add 1 bedrm, 1 fam rm, 1 office, 1 bath, 1 laundry, new stairs to 2nd fl. 2nd fl: remodel kitchen, bath, add bath, 1 den, cantilever deck at rear. 3rd fl, remodel kitchen, bath, add 1.5 baths, 1 den, 1 laundry, cantilever deck, new roof deck. match so lightwell with neighor.fully sprinkler.Details
1st fl:add 1 bedrm, 1 fam rm, 1 office, 1 bath, 1 laundry, new stairs to 2nd fl. 2nd fl: remodel kitchen, bath, add bath, 1 den, cantilever deck at rear. 3rd fl, remodel kitchen, bath, add 1.5 baths, 1 den, 1 laundry, cantilever deck, new roof deck. match so lightwell with neighor.fully sprinkler. | $160,000 |
| Apr 13, 2018 | Completed final sign-off Apr 2019 | 858 31st Av | 2nd flr - remodel kitchen, remove bathroom, add a powder room and wetbar. 3rd flr. remodel bathroom, add master bathroom.Details
2nd flr - remodel kitchen, remove bathroom, add a powder room and wetbar. 3rd flr. remodel bathroom, add master bathroom. | $38,000 |
| Apr 10, 2018 | Completed final sign-off Oct 2019 | 123 09th Av | 1st fl: total remodel, add family room & laundry. 2nd fl: total remodel, add 1 bath & den. 3rd fl: total reomdel, add 1 bath, 1 den & laundry. new roof deck. provide nfpa 13d sprinkler systems under on seperate permit.Details
1st fl: total remodel, add family room & laundry. 2nd fl: total remodel, add 1 bath & den. 3rd fl: total reomdel, add 1 bath, 1 den & laundry. new roof deck. provide nfpa 13d sprinkler systems under on seperate permit. | $120,000 |
| Mar 20, 2018 | Completed final sign-off Jun 2019 | 750 Lyon St | 1st fl - add a family room, a bedroom, a media room, an exercise room, a full bath, upgrade footing and slab; 2nd fl - remodel kitchen and bathrooms; 3rd fl - add 2 full bathroomsDetails
1st fl - add a family room, a bedroom, a media room, an exercise room, a full bath, upgrade footing and slab; 2nd fl - remodel kitchen and bathrooms; 3rd fl - add 2 full bathrooms | $80,000 |
| Feb 2, 2018 | Completed final sign-off Sep 2018 | 8 Arco Wy | 2nd floor: add new full bath, new 2x2 skylight in full bath, new half bath, remodel extg closet and kitchen. 1st floor: add 2 nw bedrooms , 2 nw full baths and family room. n/a for maherDetails
2nd floor: add new full bath, new 2x2 skylight in full bath, new half bath, remodel extg closet and kitchen. 1st floor: add 2 nw bedrooms , 2 nw full baths and family room. n/a for maher | $35,000 |
| Jan 12, 2018 | Completed final sign-off Jun 2018 | 39 West View Av | relocate e kitchen, add 1 new bath, convert e kitchen space to bedroom 2nd fl. construct 1 bdrm, family rm, 1 full bath at gr fl, consruct new deck w staircase at rear of building approx 18 x 7 maher not reqDetails
relocate e kitchen, add 1 new bath, convert e kitchen space to bedroom 2nd fl. construct 1 bdrm, family rm, 1 full bath at gr fl, consruct new deck w staircase at rear of building approx 18 x 7 maher not req | $56,000 |
| Dec 7, 2017 | Completed final sign-off May 2018 | 255 Ralston St | 1st fl - add bedroom, family room, 2 full bathrooms and exsercise area; 2nd fl - remodel kitchen, bathroom, add full bathroom and new rear deckDetails
1st fl - add bedroom, family room, 2 full bathrooms and exsercise area; 2nd fl - remodel kitchen, bathroom, add full bathroom and new rear deck | $89,000 |
| Oct 4, 2017 | Completed final sign-off Apr 2018 | 67 Meadowbrook Dr | 1st fl: convert (e) space to have a family room, a bedroom, a full bath. 2nd fl: remodel kitchen, bathroom & add a full bath, a powder room.Details
1st fl: convert (e) space to have a family room, a bedroom, a full bath. 2nd fl: remodel kitchen, bathroom & add a full bath, a powder room. | $68,000 |
| Aug 10, 2017 | Completed final sign-off Dec 2017 | 95 Junipero Serra Bl | to comply with complaint #201797762. bathroom remodel: counter top replacement and reccess lightingDetails
to comply with complaint #201797762. bathroom remodel: counter top replacement and reccess lighting | $16,000 |
| Aug 3, 2017 | Completed final sign-off Mar 2018 | 1630 Noriega St | work on 2nd floor only - remodeling (e) kitchen, bathroom, add 1 bathroom. change (e) living room to 2 bedroom. add 1 skylight, less than 1' above the roof. new furnace & water heater.Details
work on 2nd floor only - remodeling (e) kitchen, bathroom, add 1 bathroom. change (e) living room to 2 bedroom. add 1 skylight, less than 1' above the roof. new furnace & water heater. | $15,000 |
| Aug 2, 2017 | Completed final sign-off Jul 2024 | 421 Walnut St | vertical addition. 1-story addition above existing single family home. add 3 bedrooms, 2 bathrooms, new family room & laundry room.Details
vertical addition. 1-story addition above existing single family home. add 3 bedrooms, 2 bathrooms, new family room & laundry room. | $60,000 |
| Jun 8, 2017 | Completed final sign-off Jan 2018 | 316 Edinburgh St | 1. on ground floor: remodel (e) half bath, replace (e) lighting by new recessed lights & replace (e) windows by new vinyl windows in kind. 2. on 2nd flr: remodel (e) kitchen & 2 full bathrms & replace (e) lighting by new recessed lights. no removal of walls & no (n) walls.Details
1. on ground floor: remodel (e) half bath, replace (e) lighting by new recessed lights & replace (e) windows by new vinyl windows in kind. 2. on 2nd flr: remodel (e) kitchen & 2 full bathrms & replace (e) lighting by new recessed lights. no removal of walls & no (n) walls. | $50,000 |
| May 22, 2017 | Completed final sign-off Jul 2024 | 107 De Soto St | revision to pa#201704264928, 1/f: change sliding door to window, delete on sliding door, re-arrange bathroom fixtures, add a wet bar, 2/f: relocate bathroom, kitchen cabinet, skylights, add a powder room, add a spiral stair.Details
revision to pa#201704264928, 1/f: change sliding door to window, delete on sliding door, re-arrange bathroom fixtures, add a wet bar, 2/f: relocate bathroom, kitchen cabinet, skylights, add a powder room, add a spiral stair. | $15,000 |
| Apr 26, 2017 | Completed final sign-off Jul 2024 | 107 De Soto St | 1st floor: legalize extg bathroom and 2 bedrooms, add a family room, a bedroom, a laundry room, and a full bath. 2nd floor: remodel kitchen and bathrooms.Details
1st floor: legalize extg bathroom and 2 bedrooms, add a family room, a bedroom, a laundry room, and a full bath. 2nd floor: remodel kitchen and bathrooms. | $80,000 |
| Apr 17, 2017 | Completed final sign-off Jun 2017 | 3909 Lincoln Wy | in 2nd floor: remodel existing bathroom, add a new full bathroom.Details
in 2nd floor: remodel existing bathroom, add a new full bathroom. | $18,000 |
| Feb 22, 2017 | Never finaled issued Feb 2017, no final | 44 Goettingen St | 1st flr: add an exercise room. 2nd flr: remodel (e) kitchen, bathrooms, add a powder room, add a rear deckDetails
1st flr: add an exercise room. 2nd flr: remodel (e) kitchen, bathrooms, add a powder room, add a rear deck | $50,000 |
| Aug 26, 2016 | Completed final sign-off Mar 2022 | 651 24th Av | 1st floor: add a family room, two bedrooms, a full bathroom.Details
1st floor: add a family room, two bedrooms, a full bathroom. | $60,000 |